Council archive · source document
Minor Change Report MCU21 0117 02 (As Published) · MCU21/0117.02
Existing Condition 48 (OPW approval)
APPROVED PLANS
48. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
7283_L01-01_G Landscape Notes and schedules Sept 2023
7283_L03-01_G Landscape planting plan Sept 2023
Amendments The above plan is required to be amended to accommodate a 0.5
metre wide landscape bed along the full length of the driveway
(western side of driveway) from Pearl Street.
7283_L07-01_G Landscape Details Sept 2023
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
23098/SK10 G Concept Site Levels and Drainage Plan 14/05/2024
1. The drawing is marked as conceptual and includes a note
Amendments
advising the drawing is not to be used for construction. Provide
an amended plan that is suitable for Operational Works
Construction for Council approval prior to the prestart meeting.
2. Prior to the prestart meeting, provide an amended plan to Council
for approval that includes the frontage works required in
accordance with the MCU Conditions.
3. Prior to the prestart meeting, provide updated engineering plans
which specifically address the following:
a. A piped solution is proposed for Lot 1 SP153798. Due to the
proposed surface levels of the development driveway, when
events exceed the 2%AEP, or when blockage of the pipe inlet
occurs, flooding/ponding on the upstream lot will occur.
Revise the design to ensure that no ponding/flooding on the
upstream lot will occur in the 1%AEP event based on design
blockage allowance for any pipe system, consistent with
QUDM.
b. Provide cross and long sections and hydrologic and hydraulic
calculations for the swales proposed in the following
locations:
i. On the eastern boundary of the development site to
convey flows from outlet 2/1 to the LPD
ii. From the driveway low-point to the bioretention basin
iii. On the northern and eastern boundaries of Lot 1
SP153798 to convey runoff from the external
catchment to inlet 1/1
Page 17 of 29
Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU21 0117 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Report MCU21 0117 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.