Minor Change Report MCU21 0117 02 (As Published) · MCU21/0117.02
L07-01_I I Landscape Details, prepared by 08-08-25
Blackburne Jackson
L07-02_A A Landscape Details, prepared by 08-08-25
Blackburne Jackson
Condition 29
29. The development site must be landscaped. The works must be undertaken in accordance
with the Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
Landscaping Plans and in particular:
a) A dense 2m minimum landscaped setback to the full length of the site’s frontage to Pearl
Street (excluding access, fence and bin enclosure).
b) A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
Street.
c) A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
infrastructure) except along the proposed driveway which adjoins Lot 1 RP153798 where
a 0.5m wide landscape setback must be provided.
d) The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
e) All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Car Parking
32. A minimum of 20 car parking spaces must be provided and marked on the site. The works
must include in particular:
a) 16 covered parking spaces within the total;
b) Four visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use; and
e) Dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Stormwater Drainage
34. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
works must be undertaken in accordance with an Operational Works approval and include in
particular:
a) The works generally in accordance with the approved engineering operational works
plans as prepared by Morgan Consulting Engineers.
b) Collection and lawful discharge of stormwater to ensure that adjoining properties,
reserves and roads are protected from ponding or actionable nuisance from stormwater
as a result of any works undertaken.
c) The site stormwater system is to accommodate stormwater from Lot 1 RP153798
external to the site, including registration of drainage easements over the site drainage
system in favour of Lot 1 RP153798.
d) the use of gravity stormwater drainage and not surcharge pits
Page 26 of 29
Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU21 0117 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Report MCU21 0117 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.