Council archive · source document
Dewatering Management Plan · OPW24/0032
Plans and drawings: the text below has words only, no drawings.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
ADG Consulting Pty Ltd
5.6 Groundwater treatment
All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
stormwater network. The following treatment measures will be adopted, and will be installed and
operational prior to the commencement of dewatering:
1. A groundwater pH buffering treatment system (primary treatment)
2. A sedimentation tank to provide additional residence time and sedimentation (secondary
treatment).
3. Installation of fine media filtration to retain suspended sediments and/or heavy metals (tertiary
treatment), if required.
Details of the treatment systems and methodologies are provided in Section 0 of this report.
Note: Consideration should be taken, regarding placement of treatment gear on site to enable easy
cleaning and maintenance throughout the dewatering phase for the project. Consider the potential
requirement for regular de‐sludging of sedimentation tank/s to suitable area onsite, if available (cost
minimisation).
ADG1304.21 Dewatering Management Plan_Rev0_08.10.21 Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Dewatering Management Plan.pdfRelated documentApplication case desk ↗
Dewatering Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.