Skip to the record
Accept no imitations.

Original source · versioned page text

Scg 33094(Swm)

of 32

Page text read automatically using OCR, there may be inaccuracies

1.0     INTRODUCTION:


SCG Consulting Engineers have been commissioned by Tim Ditchfield Architects to provide a Storm
Water Management Plan for the proposed development at Lots 1 and 2 on RP116776, 23-25 Sidoni
Street, Tewantin.

The proposed development involves the construction of a multi level residential building and a single
commercial tenancy. The objective of this stormwater management plan is to demonstrate that the
following measures will be incorporated into the design and construction of the development:



        •     Maintain stormwater quality – Protect receiving waters (during and post construction)

        •     Manage storm water peak flow rates of runoff and existing flow path characteristics.

        •     Protect against flooding.

        •     Adopt Water Sensitive Urban Design (WSUD) principles throughout.



This report should be read in conjunction with our concept Stormwater Management Plan (SWMP)
(Appendix D) drawing (No.) 33094 – C5.1.

The proposed development has been assessed against the following guidelines and planning
documents:



        •     Queensland Urban Drainage Manual 2017 (QUDM)

        •     Water Sensitive Urban Design (WSUD) Technical Design for S.E. Queensland

        •     Noosa Plan 2020

        •     State Planning Policy 2017

        •     AS/NZS 3500.3:2018 – Plumbing and Drainage Part 3 – Stormwater Drainage

        •     QDC MP1.4 – Rainwater Tanks and Other Supplementary Water Supply Systems.



2.0     EXISTING SITE DESCRIPTION:


The Site is described as Lots 1 and 2 on RP116776, is located within Noosa Council Government area
and is approximately 2002m2 (0.20ha) in area.

The site is currently vacant and site cover is predominately short grasses. The site is located in a
“District Centre” zoning in accordance with the Noosa Plan 2020

The site generally falls from the rear (southern) boundary in a northern direction towards the front
boundary on Blakesley Street. Council drainage infrastructure is located within the road reserve
consisting of side entry pits connected to an underground network.




 SCG Consulting engineers                          4                           SCG Ref: 33094(SWM)

Log in to download the original (SCG 33094(SWM).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.