Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Scg 33094(Swm)

of 32

Page text read automatically using OCR, there may be inaccuracies

The following design manuals are to be implemented prior to any construction commencing.

      -   SPP Appendix 2, Table A

      -   IECA Principles of Construction site ESC

      -   Water By Design ESD Factsheet Suite




5.3         Completed Development


The proposed development has been assessed against the State Planning Policy 2017 and the Noosa
Plan 2020. The site has an allotment area of 2002m2 and such does not trigger local or state
requirements for operational stormwater quality treatment objectives.




6.0        STORMWATER QUANTITY:
  The site is zoned within a “District Centre” zoning and corresponds to a design fraction impervious
  of 100% in accordance with QUDM Table 4.5.1 – Fraction impervious vs development category. It
  can be assumed that the subdivision stormwater infrastructure was designed in accordance with
  QUDM and approved by Noosa Council. The proposed development consist of an Impervious area
  of approximately 89% and therefore we don’t believe on-site detention is required for the site as
  this fits within the existing development category.



  In addition to the above the site is located within the lower third of the total stormwater catchment
  and therefore by detaining stormwater flows it may allow peak flows from the site to coincide with
  the wider catchment peak flows and therefore result in a worsening effect on the existing drainage
  infrastructure. Therefore we are of the opinion measures to control stormwater peak flows from the
  site would adversely impact the downstream infrastructure.



6.1        Proposed Drainage:

  The proposed site drainage is detailed in drawings SCG 33094 - SW1.1 (Appendix D) and is
  discussed below.



As defined in the Noosa Plan 2020 stormwater drainage must be designed in accordance with QUDM
2017, therefore the following design storms were adopted: -



           1.    Minor Drainage System        -      10% AEP ARI (Q10 Storm)
           2.    Major Drainage System        -       1% AEP ARI (Q100 Storm)




 SCG Consulting engineers                             8                          SCG Ref: 33094(SWM)

Log in to download the original (SCG 33094(SWM).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.