          Geotechnical investigation
     Proposed Residence - 17 The Esplanade, Sunshine Beach

Geotechnical investigation  19 November 2025 | Ref. 25289-001-Rev0
19 November 2025 | 25289-001-Rev0
Log in to download the original file

25289-001-Rev0 - The Esplanade (1)-compressed.pdf · 2.9 MB (large file)

The download may take up to a minute.

Full text of the other 44 pages

Page 2

Document Review
 Doc No.      Revision    Prepared By          Reviewed By               Date Issued
 001          0           Oliver De Silva      Ashley Davey              19 November 2025




 Doc No.      Revision    Method of Delivery   Issued To
 001          0           Electronic           Tiani Boulton
                                               ([email protected])




Prepared By                                     Reviewed By



Oliver De Silva BAppSc PMEG                     Ashley Davey BEng (Geological) RPEQ 8159
Engineering Geologist                           Director/Principal Geotechnical Engineer




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                           i

Page 3

Executive Summary
This report details the results of a geotechnical investigation undertaken for a proposed residential
development at 17 The Esplanade, Sunshine Beach. Preliminary architectural drawings indicate that the
development will consist of the construction of a three-level structure, which includes a single level
basement.
The boreholes and in situ test results indicate a subsurface profile of relatively poorly graded dune sands
to the maximum investigation depth of 6.9 m below ground level (BGL). Very loose to loose sands were
deepest in borehole BH2, extending to 2.4 m BGL, overlying medium dense sand to depths of 5 m BGL,
with underlying dense (or denser) sands. The other borehole and DCP tests indicated shallower
transitions to both medium dense and dense sands.
Slope stability modelling was carried out considering short-term erosion from a 100 year average
recurrence interval extreme storm event (as nominated by the appointed coastal engineering experts,
Moffat & Nichol (M&N)); and anticipated regression of the dune over time. The M&N assessment
indicated that a large portion of the high dune face would be affected by such a future erosion event,
extending approximately 17 m laterally into the dune face; with a localised scarp crest at around RL 23 m
AHD. The erosion cut was shown to extend to within 13 m of the subject site’s eastern boundary.
Subsequent regressive failures of the erosion profile would then be expected to occur, until the dune
face reached a slope angle of about 27°, which could encroach by about 7 m into the subject site.
The property is situated on the western side of The Esplanade road reserve, which acts as a buffer
between the beach, dune slope and the site. As a result, maintaining the integrity of the road reserve
would, in turn, help protect the property. Since the road reserve is owned and managed by Noosa
Council (NC), it is anticipated that NC would prioritise its protection before any erosion progresses
beyond the reserve and reaches the site. However, if NC determines that the property requires its own
protective measures, a shear pile wall would need to be constructed along the eastern boundary.
Given our understanding of the ground conditions and the predicted future slope geomorphology, a
shear pile wall founded at depth into the dense (or denser) sands may be required to protect the site
from coastal erosion. Subject to detailed design, secant or contiguous shear piles, possibly with
additional structural support (e.g. raked piles, ground anchors), would be required to cater for the
anticipated ‘upstand’ of about 5 m following future erosion (as indicated by our analysis). The shear piles
would likely need to be at least 12 m deep BGL. Protection against erosion and adverse interaction with
adjacent properties would also be required. This could consist of a grout curtain extending from the
eastern boundary at least 8 m westward along the northern and southern boundaries.
The following additional recommendations are provided for the proposed development:
 The proposed residence and any ancillary structures must be supported by footings founded at least
   1 m into natural medium dense (or denser) sands. In the areas of deeper cut (i.e. the basement level),
   high level footings may be adopted. Elsewhere, piles will be required.
 Excavations close to site boundaries may necessitate the installation of temporary shoring.
 Ground vibrations during construction must be minimised and monitored. Where excessive vibrations
   occur, alterations to construction techniques may be required. It is recommended that a dilapidation
   survey of adjoining structures be completed prior to construction.
 Collected roof water should be directed by pipes to the council stormwater system along The
   Esplanade. Hydraulic design should be such that under no circumstances are uncontrolled
   stormwater flows permitted over the dune face.


Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                         ii

Page 4

Contents
1.    Introduction ............................................................................................................................................................ 1
2.    Proposed Development ....................................................................................................................................... 1
3.    Method of Investigation ......................................................................................................................................3
      3.1 Fieldwork ...................................................................................................................................................................... 3
      3.2 Geotechnical Laboratory Testing ........................................................................................................................ 3
4.    Results of Investigation ...................................................................................................................................... 4
      4.1 Site Description ......................................................................................................................................................... 4
      4.2 Topography................................................................................................................................................................. 6
      4.3 Geology ........................................................................................................................................................................ 7
      4.4 Subsurface Conditions ............................................................................................................................................ 8
      4.5 Groundwater............................................................................................................................................................... 8
      4.6 Geotechnical Laboratory Test Results ............................................................................................................... 9
      4.7 Surface Drainage ....................................................................................................................................................... 9
5.    Slope Stability Assessment ............................................................................................................................... 10
      5.1 Existing Conditions................................................................................................................................................. 10
      5.2 Stability Assessment .............................................................................................................................................. 10
           5.2.1     Quantitative Assessment .................................................................................................................... 13
6.    Geotechnical Recommendations ..................................................................................................................... 16
      6.1 Earthworks ................................................................................................................................................................. 17
           6.1.1   Site Preparation and Trafficability................................................................................................... 17
           6.1.2   Excavations .............................................................................................................................................. 18
           6.1.3   Filling ......................................................................................................................................................... 18
      6.2 Building Foundations ............................................................................................................................................ 19
           6.2.1   Indicative Site Classification .............................................................................................................. 19
           6.2.2   Footing Design....................................................................................................................................... 19
      6.3 Temporary and Permanent Retention ............................................................................................................ 20
      6.4 Drainage ..................................................................................................................................................................... 22
7.    Conclusion ............................................................................................................................................................ 22
8.    Limitations ............................................................................................................................................................ 22




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                                                                                       iii

Page 5

Tables
Table 1: Summary of Subsurface Profiles ................................................................................................................................ 8
Table 2: Stability Risk Levels ....................................................................................................................................................... 11
Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007) ................................................................ 12
Table 4: Soil Parameters Adopted for Slope/W Analyses ............................................................................................... 14
Table 5: Slope/W Analysis Results ........................................................................................................................................... 14
Table 6: Retaining Structure Design Parameters ................................................................................................................ 21

Text Figures
Text Figure 1: Proposed layout plan (upper), elevations (middle) and sections (lower), courtesy of
      ADG............................................................................................................................................................................................ 2
Text Figure 2: Aerial image of the site and immediate surrounds (courtesy Nearmap, 25 August
      2025) .......................................................................................................................................................................................... 4
Text Figure 3: Oblique drone image of the site and surrounds, looking north ........................................................ 5
Text Figure 4: Oblique drone image of the site, looking west ........................................................................................ 5
Text Figure 5: Oblique drone image of the site, looking east ......................................................................................... 6
Text Figure 6: Site plan showing ground surface contours (courtesy Noosa Council [NC] ‘Intramaps’) ........ 7
Text Figure 7: Extract of Laguna Bay 1:100,000 Scale Surface Geology map ............................................................ 7
Text Figure 8: Extract from NC landslide hazard overlay mapping ............................................................................. 10
Text Figure 9: Slope/W Output – Case 1 ............................................................................................................................... 15
Text Figure 10: Slope/W Output – Case 2 ............................................................................................................................. 15
Text Figure 11: Zone of influence diagrams – footings to be founded below these lines ................................. 20

Figures
Figure 1: Site Plan
Figure 2: Section A-A’

Appendices
Appendix A                       Borehole/DCP Reports & Explanatory Notes
Appendix B                       Laboratory Test Certificate
Appendix C                       Extracts from AGS Guidelines (2007)
Appendix D                       Limitations




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                                                                                                   iv

Page 6

1.          Introduction
This report details results of a geotechnical investigation undertaken for a proposed residential
development at 17 The Esplanade, Sunshine Beach. The investigation was carried out by Tectonic for
Christian Seymour, in accordance with our Proposal P25454-Rev0 dated 8 September 2025. Adapt
Planning are the town planners for the development.
Moffat & Nichol (M&N) are the coastal engineers for the project and have provided a coastal erosion
‘cut’ profile which could affect the subject site.
The geotechnical investigation comprised the drilling of two boreholes using hand auger equipment,
located at the eastern property boundary and in the western part of the site. In situ dynamic cone
penetrometer (DCP) testing was also conducted adjacent to and within the boreholes, and at three
stand-alone locations. Geotechnical laboratory testing was undertaken on one select soil sample.
This report presents the results of the geotechnical investigation and slope stability modelling, to address
possible slope instability following coastal erosion from a hypothetical future sea surge/storm event
assessed by M&N, along with geotechnical recommendations for the proposed development in general.



2.          Proposed Development
Architectural drawings prepared by Aboda Design Group (Ref. ADG, Project No. NSS032, Dwg. Nos.
WD.101 to WD.603 [not inclusive], Rev A, dated 27 June 2025) indicate that a three-storey residence is
proposed.
The basement level would be ‘dug in’ to the slope, ‘daylighting’ to the east and being completely below
ground to the west (~3.5 m below existing ground levels). A full central level would be present above,
with a partial third level, allowing for open, elevated courtyard and terraces. Building construction is
shown to consist of suspended concrete floors, concrete and masonry walls, full height glazed facades
and some lighter weight cladding in select locations. A below ground pool would be constructed along
the northern side of the allotment, with the floor of the pool shell being up to about 3 m below existing
ground levels.
In order to construct the basement level of the residence (and the pool), earthworks will be required
comprising excavations of up to about 4 m depth, with some possible minor filling of up to about 0.5 m
high to form platforms for slab edges and general landscaping. Deeper excavations may be required for
underground services and footings.
Extracts from the proposed development plans are illustrated in Text Figures 1 overleaf.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                           1

Page 7

Text Figure 1: Proposed layout plan (upper), elevations (middle) and sections (lower), courtesy of ADG




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                    2

Page 8

3.          Method of Investigation
3.1         Fieldwork
An experienced geotechnical engineer from Tectonic undertook a site walk-over survey on 24 September
2025 to visually assess indicators of past slope instability. The walk-over included assessment of soil
exposures, surface drainage conditions, topography, evidence of erosion or past instability, and
vegetation coverage/condition.
In conjunction with the walk-over survey, two hand auger boreholes (designated BH1 and BH2) were
drilled. Borehole BH1 was drilled within the garden bed along the eastern boundary of the site, whilst
borehole BH2 was drilled within the proposed building footprint in the western part of the site. In situ
testing utilising the DCP method was completed from surface adjacent to each borehole, and at selected
downhole depths. In addition, three standalone DCP tests were conducted, from near the crest of the
sand dune and further down the dune face, extending to depths of between 2.1 m and 2.9 m below
ground level (BGL). Hand augers were taken to practical refusal at depths of between 3 m and 4 m BGL,
with DCP testing extending below the bases of the boreholes to depths of up to 6.9 m BGL.
Boreholes were backfilled with drilling spoil and left slightly mounded at the ground surface. Disturbed
soil samples were recovered from the auger cuttings. The engineer was responsible for logging soil
profiles and maintaining investigation practices in accordance with AS1726 Geotechnical site
investigations, supervising in situ testing, and recovering samples.
Borehole and DCP reports are attached in Appendix A, together with explanatory notes. Test locations
are shown in Figure 1 and subsurface conditions are discussed in Section 4.4.


3.2         Geotechnical Laboratory Testing
One selected disturbed soil sample from borehole BH1 was dispatched to a NATA accredited laboratory
for geotechnical testing, which comprised a particle size distribution (PSD) test for soil classification
purposes. Geotechnical laboratory testing was undertaken in accordance with Australian Standard
AS1289 Method for Testing Soils for Engineering Purposes.
Laboratory test results are summarised in Section 4.6, and the test certificate is attached in Appendix B.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                            3

Page 9

4.          Results of Investigation
4.1         Site Description
The site is formally described as Lot 678 on RP48111, covering an area of about 505 m2, with frontage to
the southern extent of The Esplanade along the eastern boundary. At the time of the investigation, an
existing residence occupied the majority of the site, with a swimming pool and garden area in the north-
western part.
The site was accessed via a concrete driveway sloping up from the roadway to the east, which then
entered the site at a level grade. The existing residence (to be demolished) was a three-storey, rendered
blockwork structure, with the ground level terraced into the slope to the west. A survey plan supplied to
us indicates that a water main runs adjacent to the eastern boundary of the property, and a sewer
reticulation main crosses the south-eastern corner of the block.
Blockwork retaining walls, ranging up to about 1.7 m high, retained cuts for the lower level of the
residence along the northern and southern sides.
Some minor (mostly ‘hairline’) cracking was noted in various parts of the rendered structures across the
site. Otherwise, the residence and other structures around the garden areas appeared to be in relatively
good condition, based on a visual exterior assessment, with no signs of structural distress caused by
global slope instability.
A 2025 aerial image of the site and surrounds is shown in Text Figure 2 below.




                                    Subject site
                                                                                               Sunshine Beach




Text Figure 2: Aerial image of the site and immediate surrounds (courtesy Nearmap, 25 August 2025)

Site conditions at the time of our investigation are shown in Text Figures 3 to 5 on the following pages.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                           4

Page 10

 Residence on                                                       The Esplanade

 subject site



                                                                   Main dune




                                                                                                  Smaller frontal dune




                Text Figure 3: Oblique drone image of the site and surrounds, looking north




                                       Residence on
                                       subject site




                        Main dune




                                                                                    Smaller frontal dune




                       Text Figure 4: Oblique drone image of the site, looking west



Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                    5

Page 11

                                             Minor cracking noted in
                                             rendered structures




                       Text Figure 5: Oblique drone image of the site, looking east


4.2         Topography
During our site walk-over, topographic features specific to the site were noted, and ground slopes were
recorded using a hand-held clinometer. As illustrated in Text Figure 6 overleaf, the site is located just
above the crest, and over the upper face, of the high dune backing Sunshine Beach. The stoss face of the
dune is generally eastward facing at the site location.
The inferred natural ground slope was generally consistent through the site, at about 8° to the east.
However, the site had been altered by historic cut and fill earthworks associated with construction of the
existing residence, which had formed level areas connected via stairs and retaining walls. In the area
immediately to the east of the site, along the road area, the ground was near flat and appeared to have
been formed by filling works estimated to be up to 1 m in height. Approximately 3 m to the south-east
of the property boundary, this fill was retained by a 0.6 m high timber sleeper retaining wall in poor
condition. The remainder of the abovementioned fill, which formed a near level area extending between
5 m and 10 m east of the site, was graded down to the natural slope. This then transitioned to the top of
the dune slope, with a prominent break in slope over the main dune face which had an overall gradient
of around 30°. At about midway down the dune slope, the slope angle increased to between 30° and 37°,
but was still generally planar in shape.
At the toe of the high dune a trough was present, of around 5 m width. The frontal dune running along
the back of the main beach area was about 1 m height and undulating. Beyond this, the beach dropped
down from about RL 3 m AHD to the shoreline (around RL 0 m AHD).




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                       6

Page 12

A selection of the geomorphological features described above are denoted on Text Figures 3 to 5 on the
preceding pages.




                                                                                                           Subject site




    Text Figure 6: Site plan showing ground surface contours (courtesy Noosa Council [NC] ‘Intramaps’)


4.3              Geology
Available geological information 1 indicates that the site is underlain by Holocene age quartz dune sand
(described as “parabolic dunes”, Ref. extract in Text Figure 7 below).




                                                                                   Approx. site location




                      Text Figure 7: Extract of Laguna Bay 1:100,000 Scale Surface Geology map



1
    Queensland Government, Dept. of Natural Resources, Mines and Energy, 1:100,000 Laguna Bay Surface Geology, Sheet 9545, 2018


Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                                 7

Page 13

4.4          Subsurface Conditions
Detailed descriptions of the subsurface conditions encountered in the boreholes are provided in the
borehole reports attached in Appendix A, along with definition sheets which describe terms and
abbreviations used in the reports. Subsurface conditions encountered in the boreholes are summarised
below and are illustrated as a cross-section in Figure 2 (attached at the end of report text).
The subsurface conditions encountered in the boreholes surrounding the existing residence comprised
initially loose clayey and silty sand fill to depths of 0.4 m and 0.5 m BGL in boreholes BH1 and BH2,
respectively. Then, very loose to loose natural sands were encountered to depths of 0.4 m and 2.4 m in
boreholes BH1 and BH2, respectively. Below this in borehole BH1, medium dense sand was encountered
to a depth of 1.2 m BGL, overlying dense (or denser) sand to the borehole termination depth of 4 m BGL.
In borehole BH2, medium dense sand was encountered to the borehole termination depth of 3 m BGL,
with downhole DCP testing indicating the presence of dense sand below 6.5 m BGL.
Standalone DCP testing undertaken across the dune to the east of the site indicated loose natural sand
to depths of 1.3 m to 1.8 m BGL, then becoming medium dense to depths of 1.9 m to 2 m BGL, overlying
dense (or denser) sand to the DCP termination depths.
Table 1 below provides a detailed summary the subsurface profiles encountered in each borehole and
standalone DCP test (presented left to right from west to east direction, western boundary of site to high
foredune toe).

Table 1: Summary of Subsurface Profiles

 Material / Test Location   BH2                BH1                DCP1           DCP2          DCP3

 Loose Sand Fill            0.0 – 0.5          0.0 – 0.4          NE             NE            NE


 Very Loose to Loose        0.5 – 2.4          0.4 – 0.4          *0.0 – 1.4     *0.0 – 1.9    *0.0 – 1.5
 Natural Sands

 Medium Dense Natural       2.4 – 5.0*         0.4 – 1.2          *1.4 – 2.0     *1.9 – 2.1    *1.5 – 2.0
 Sands

 Dense (or denser)          *5.0 – 6.9TD       1.2 – 4.2R         *2.0 – 2.9TD   *2.1 – 2.2R   *2.0 – 2.3R
 Natural Sands

Notes:
     1. Depths noted in m BGL at time of investigation (24 September 2025)
     2. NE Denotes not encountered
     3. * denotes materials inferred from DCP results
     4. TD denotes DCP test termination depth
     5. R denotes DCP refusal


4.5          Groundwater
No signs of groundwater seepage (‘springs’) were observed at the ground surface during our walk-over
and no groundwater was encountered in the boreholes. It is expected that an unconfined groundwater
table would exist below the toe of the dune, close to sea level, and fluctuate with tidal and weather
conditions. The groundwater level is anticipated to rise slightly under the dune moving west.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                            8

Page 14

Groundwater seepage may develop at shallower depths, particularly following periods of prolonged or
heavy rainfall at various levels through the dune profile, possibly being ‘perched’ of zones of indurated
sand that may exist. Based upon experience at other similar sites in the area, such seepage would be
expected to be transient and of relatively minor lateral extent.


4.6         Geotechnical Laboratory Test Results
PSD analysis on one natural sand sample selected from borehole BH1 indicated that the soil generally
comprised poorly graded, fine to medium grained sand, that was relatively ‘clean’ (1% trace silt).
Full test results (laboratory certificate) are presented in Appendix B.


4.7         Surface Drainage
Surface drainage would be expected to follow natural surface contours to the east towards the beach.
The site has a relatively small catchment, with the majority of upslope run-off expected to be intercepted
by the neighbouring property or the roadside drainage along Stevens Street to the west.
Given the sandy nature of the site, rainfall would normally be anticipated to infiltrate the ground surface
relatively quickly. However, as the proposed development will occupy the majority of the block,
significant run-off from hard surfaces will occur. Nevertheless, where directed into swales rather than
pipes, such run-off would be expected to infiltrate into the natural sands relatively rapidly. No significant
surface water run-off features were noted across the allotment or adjacent dune face during our
assessment (e.g. scour/wash out scars).




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                           9

Page 15

5.          Slope Stability Assessment
5.1         Existing Conditions
The Noosa Planning Scheme 2020 includes a landslide hazard overlay map (Ref. extract in Text Figure 8)
which indicates that the eastern edge of the site, and steeper dune face to the east, have been mapped
as Moderate and High Hazard areas, respectively.




                                           Subject site




                    Text Figure 8: Extract from NC landslide hazard overlay mapping

It should be noted that the NC landslide hazard mapping is a broad-scale indication of the potential
landslide susceptibility and is superseded by this site-specific assessment. The allotment and adjacent
dune face did not exhibit any visible surface features which would indicate larger scale global slope
instability during our walk-over. No landslide back scarps, noteworthy groundwater seepage or areas of
naturally ‘hummocky’ ground were observed. Medium dense sands were encountered at relatively
shallow depths below surface down the dune face, with the dune standing at around 30° overall.
Generally, sand dune slopes are close to the ‘limit of equilibrium’ where the surface gradient is about 30°,
although often lower (26˚ to 28˚) for very loose sands (as were indicated to be present down the dune in
DCP1 to DCP3 to depths of up to 1.9 m BGL). The limit of equilibrium is the ‘tipping point’ to instability,
where the factor of safety (FOS) of the slope is approximately 1.0. The FOS of a slope is the balance (ratio)
between the forces driving instability (e.g. soil weight, groundwater pressure) and the resisting forces (e.g.
soil friction and cohesion).


5.2         Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 2 on the
following page.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                           10

Page 16

Table 2: Stability Risk Levels
 Risk Level                   Example Implications(1)

 VH       Very High Risk      Unacceptable without treatment. Extensive detailed investigation and research, planning and
                              implementation of treatment options essential to reduce risk to Low; may be too expensive and
                              not practical. Work likely to cost more than value of property.

 H        High Risk           Unacceptable without treatment. Detailed investigation, planning and implementation of
                              treatment options required to reduce risk to Low. Work would cost a substantial sum in relation
                              to the value of the property.

 M        Moderate Risk       May be tolerated in certain circumstances (subject to regulators’ approval) but requires
                              investigation, planning and implementation of treatment options to reduce risk to Low.
                              Treatment options to reduce to Low risk should be implemented as soon as practicable.

 L        Low Risk            Usually acceptable to regulators. Where treatment has been required to reduce the risk to this
                              level, ongoing maintenance required.

 VL       Very Low Risk       Acceptable. Manage by normal slope maintenance procedures.

Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend
on the nature of the property at risk; these are only given as a general guide.

Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given below, it is assessed that there should be a Low Risk of global slope instability
affecting the proposed development. Regulators (NC) normally require that a Very Low or Low Risk of
landslide affecting the property must be demonstrated to enable development approval.
Summarised in Table 3 overleaf is our qualitative assessment of landslide risk for the development site. A
summary of qualitative terminology for use in assessing risk to property is attached (taken from AGS
2007).




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                                 11

Page 17

Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007)
 Hazard                     Likelihood    Consequence   Assessed Risk   Comments

                                                                        Given the low natural gradients through the
 Failure through very                                                   proposed building areas and retention
 loose to loose natural                                                 system proposed, it is considered Unlikely
 sands and sand fill                                                    that a landslide in these materials would
                               Unlikely     Medium           Low
 above the foundation                                                   affect the proposed development. For a
 depth in future                                                        potential Medium impact from such
 building areas                                                         instability the resultant risk would be Low as
                                                                        per AGS 2007.

                                                                        The likelihood of a deep failure through the
                                                                        medium dense (or denser) natural sand
                                                                        below the proposed foundation depth is
 Deep failure through                                                   assessed as Rare due to the lack of
 the medium dense (or                                                   precedence of such movements locally, no
                                 Rare        Major           Low
 denser) sands below                                                    signs of any existing slope instability and a
 the foundation depth                                                   lack of groundwater. Although the
                                                                        consequence of such a failure would be
                                                                        Major, the resultant risk is Low as per AGS
                                                                        2007.

                                                                        The likelihood of failure of a temporary
                                                                        retention system, if required as outlined in
                                                                        Section 6.3, is assessed as Unlikely, subject
 Instability of
                                                                        to detailed design by a suitably qualified
 temporary shoring
                                                                        RPEQ engineer, which accounts for the
 system (if required), as      Unlikely     Medium           Low
                                                                        required factors of safety against slope
 discussed in
                                                                        instability, and construction by a specialist
 Section 6.3.
                                                                        contractor. Although the consequence of
                                                                        such a failure could be Medium, the
                                                                        resultant risk is Low as per AGS2007.

                                                                        While the modelling indicates it is Possible
                                                                        that an extreme erosion event could affect
                                                                        the site, the likelihood of a landslide
 Retrogressive failure
                                                                        extending through the future piled wall
 of the high foredune
                                                                        system along the eastern edge of the site
 face considering
                                                                        boundary as outlined in Section 6 is assessed
 potential future
                                                                        as Rare, subject to detailed design by a
 erosion from a                  Rare        Major           Low
                                                                        suitably qualified RPEQ engineer,
 hypothetical storm
                                                                        construction by a specialist contractor, and
 and wave scenario,
                                                                        considering the results of our quantitative
 impacting the subject
                                                                        slope stability analysis outlined in Section
 site.
                                                                        5.2.1. Although the consequence of such a
                                                                        failure would be Major, the resultant risk is
                                                                        Low as per AGS2007.



The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 6 have been designed to mitigate those impacts.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                       12

Page 18

5.2.1       Quantitative Assessment
In order to estimate the factor of safety (FOS) against slope instability for the proposed development,
numerical analysis has been conducted using Slope/W. The ground surface profile has been modelled
using a combination of architectural layout drawings and slope angles measured in the field by Tectonic.
The analysed subsurface profile was compiled based on the results of our subsurface investigation.
Some inferences regarding subsurface conditions were made between test locations. A minimum FOS
value of 1.5 is the commonly adopted industry standard for long term conditions.
Although the existing sand dune slope would be considered relatively stable in the short term, it is
acknowledged that there were positive gradients dipping down and away, from beyond the eastern edge
of the likely building area, and very loose/loose sands were present in the near surface profile. The longer
term stability of the site could in addition be affected by other factors such as coastal erosion by storm
tides, which could theoretically lead to larger scale failures.
Modelling has therefore been carried out considering erosion from a hypothetical storm and wave
scenario nominated by coastal engineering experts (M&N), and taking into account subsequent
retrogression of the dune over time. Each of the cases analysed are summarised as follows:
   Case 1 – Reprofiling of slope due to the modelled storm erosion profile.
   Case 2 – Slope stability analysis following regressive failure of the slope from Case 1, with the high
    dune ultimately assuming an inclination of 27° (eastern property boundary protected by a shear pile
    wall).
The modelled ground surface profile for the initial Case 1 was based on provided survey information
across the subject site (Ref. Next Step Surveying, Project No. NSS032, Dwg No. 3000 001, dated 30
January 2025) with surface profiles beyond the eastern property boundary estimated from slope angles
and measurements in the field by Tectonic. Erosion cut adopted in Case 1 was based on information
provided in the referenced M&N report, which included a combination of short-term erosion from a
100-year average recurrence interval (ARI) storm event. It was indicated in the M&N assessment that a
significant portion of the high dune face would be affected by a future erosion cut, extending
approximately 17 m laterally into the dune face; with a localised scarp crest at around RL 23 m AHD. The
erosion cut was shown to extend to within 13 m of the subject site’s eastern boundary. A toe level of
around RL 1.9 m AHD was adopted; generally consistent with the larger scale erosion cut given by M&N
in their modelling. Subsurface conditions for Cases 1 & 2 were developed using the borehole and DCP
information collected during the investigations.
Based on the subsurface conditions at the site, and the extent of proposed earthworks, it is anticipated
that the majority of the building loads for the proposed residence and ancillary structures will be
transferred by high-level footings into the natural medium dense (or denser) sands underlying the site.
However, in some locations where medium dense (or denser) sands will be at depth, piled foundations
will be required. A surcharge load of 5 kPa was modelled in areas where the building loads are to be
transferred via piled foundations to the underlying soils and in landscaped/driveway areas, whilst 30 kPa
was applied across the proposed building area were medium dense (or denser) sands are expected at
bulk earthworks levels to represent the distributed load from the proposed three level structure.
The soil parameters adopted for the analyses are summarised in Table 4 and are based on interpretation
of the site investigation, in situ testing and laboratory test results. The parameters are consistent with
the low to mid-range values recommended for similar materials in Appendix D of Australian Standard
AS4678-2002 Earth Retaining Structures. Due to the dune slope and high permeability soils, a
groundwater table is not anticipated within the slope and therefore, was not modelled.


Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                        13

Page 19

Table 4: Soil Parameters Adopted for Slope/W Analyses
             Material Description            Unit Weight (kN/m3)             Cohesion, c (kPa)       Friction Angle, ɸ (degrees)

         Very Loose/Loose Sands                       17                              0                          27

             Medium Dense Sands                       18                              0                          34

         Dense (or denser) Sand                       19                              0                          36

* Depends on type of fill used and compaction achieved

Commonly adopted industry standards generally require minimum FOS values against slope instability of
1.3 and 1.5 for short-term and long-term conditions, respectively. Administering authorities such as NC
normally require a minimum FOS of 1.5 or greater for long-term conditions. Results of the stability
analyses are presented in Table 5, with the Slope/W outputs shown in Text Figures 9 & 10, overleaf.

Table 5: Slope/W Analysis Results
    Analysis           Description                                                                        Factor of Safety

    Case 1             Unstable, over-steep dune face following potential future erosion cut after
                                                                                                                0.5
                       significant storm event

    Case 2             Slope stability analysis following regression of the slope from Case 1 to a
                       long-term stable profile of 27°, with the eastern property boundary                      1.5
                       protected by a shear pile wall



Results of the analyses indicates the following:
      Case 1 – It was noted that the modelled storm erosion cut would not initially affect the site.
       However, the dune face following the storm erosion cut would have an unstable FOS of 0.5, due to
       the over-steep nature of this profile.
      Case 2 – Following regression of the dune from the future erosion cut to a long-term stable profile
       of 27°, if the eastern property boundary is protected by an engineer designed and certified shear pile
       structure the potential critical slip surface takes the form of a deep-seated failure into the underlying
       dense (or denser) sands. Such a slip surface results in a FOS of 1.5, allowing for retrogression of the
       slope from Cases 1. The pile wall structure would be significant, with deep piles (at least 12 m BGL)
       and a concrete capping beam, possibly in combination with lateral restraint due to the pile ‘upstand’
       of about 5 m.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                              14

Page 20

                                    Text Figure 9: Slope/W Output – Case 1




                                    Text Figure 10: Slope/W Output – Case 2




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                             15

Page 21

6.          Geotechnical Recommendations
Based on the modelled 100-year ARI erosion cut profile, and the subsequent regressive failures of the
slope to equilibrium (27°), the subject site would require protection from erosion.
From a geotechnical perspective, the requisite FOS could be achieved utilising a shear pile wall
positioned along the eastern property boundary. However, the property is situated on the western
(landward) side of The Esplanade road reserve, which acts as a buffer between the beach dune slope and
the site. As a result, maintaining the integrity of the road reserve would, in turn, help protect the
property. Since the road reserve is owned and managed by NC, it is anticipated that NC would prioritise
its protection before any erosion progresses beyond the reserve and reaches the site. However, if NC
determines that the property requires its own protective measures, a shear pile wall would need to be
constructed along the eastern boundary.
Given our understanding of the ground conditions and the predicted future slope geomorphology, a
shear pile wall founded at depth into the dense (or denser) sands may be required to protect the site
from coastal erosion. Subject to detailed design, secant or contiguous shear piles, possibly with
additional structural support (e.g. raked piles, ground anchors), would be required.
The adopted structure should comprise piles structurally tied together at the surface using a steel-
reinforced concrete capping beam. An ‘A-frame’ structure may ultimately be required (i.e. vertical and
raked piles) to achieve the required shear force resistance, at least if micro-piles are adopted, especially
where allowance is given for the anticipated upstand ranging up to about 5 m high indicated by the
stability analyses.
A summary of the minimum piling requirements for the shear pile wall is given as follows:
Case 4: Shear pile wall along eastern edge of building area:
    Minimum Pile Length (below existing ground): 12 m
    Upstand Height:                                  5m
    Unfactored resistance to normal shear forces:    160 kN/m*
*The quoted resistance to normal shear forces is as utilised within the scope of the program Slope/W. It is
noted that this does not necessarily relate to actual design parameters, and designers must undertake finite
element analysis to assess soil/structure interactions and calculate both bending and shear stresses in the
piles. Retaining structures should also undergo rigorous checks of global and internal stability. The designer
must be satisfied that the geotechnical data presented is adequate to allow the analyses to be undertaken
with a high degree of confidence.
For a non-contiguous pile wall system such as micro-piles, a grout ‘curtain’ would need to be installed
along the length of the wall to prevent the flow of sand between the piles. Based on the highest
modelled vertical face of about 5 m height along the eastern boundary, such a grout ‘curtain’ should be
installed down to at least 7 m below the ground surface (existing).
Whilst the proposed structure would prevent erosion along the eastern boundary of the property, there
is potential for the design erosion event to remove sand from the neighbouring properties to the north
and south, exposing the side boundaries of the site to instability and erosion. The extent of the side
boundary erosion protection required has been determined by a line drawn at 27° extending upwards
from the estimated dune toe, following extreme storm erosion, and subsequent retrogressive
failures. Erosion protection is required to extend from the shear pile wall to an equivalent distance of
8 m from the eastern property boundary, along the northern and southern boundaries. The erosion


Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                              16

Page 22

protection shall taper from a minimum depth of 2 m BGL in the west, deepening to the east to tie into
the shear pile wall along the eastern edge.
Whether the pile wall will also need to extend around the side boundaries will depend on the dimensions
and strength of the grout curtain installed and its ability to provide at least emergency support to the
retained sand. This should be considered as part of the detailed design.
General geotechnical recommendations for site development are provided in the following sections.


6.1         Earthworks
Bulk excavations in the order of up to 4 m depth are anticipated for the basement level construction.
Isolated deeper excavations may be required for underground services and footings. The pool is shown
to be below ground, and will require excavation of up to about 3 m below existing ground levels, close to
the site’s northern boundary. Filling is anticipated to be for landscaping only, and should be less than
0.5 m high.
The advice give herein should be treated as preliminary to aid in project planning, and Tectonic must
review detailed design drawings for the residence prior to construction.

6.1.1       Site Preparation and Trafficability
Following clearing of existing vegetation, any tree stumps and large roots should be ‘grubbed out’. Any
organic rich topsoil should then be stripped and set aside. Similarly, all foundations and remaining
structural elements from the existing residence should be removed. Based on the boreholes and site
observations, stripping depths to remove existing unsuitable upper soils should be relatively shallow,
however, deeper areas of unsuitable materials may be present across the site, particularly related to the
existing structure (e.g. retaining wall backfill, service trenches, footing excavations). Topsoil materials
must not be used in structural fill; however, may be placed across landscaping areas.
It should be noted that compaction of such relatively ‘clean’ sands as structural fill requires the addition
of substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment
(typically a vibrating plate). Care must be taken with the use of vibratory equipment (e.g. compactors or
sheet piling) to ensure that there are no adverse impacts on surrounding structures. The impacts from
ground vibration must be closely monitored and managed during construction. It would be prudent to
conduct a dilapidation survey of neighbouring structures prior to commencement of construction; and
furthermore it is recommended that a suitably qualified and experienced civil/structural RPEQ is engaged
to provide a vibration management plan for the proposed construction works.
The exposed natural subgrade following excavations will likely be in a loose condition (even where
indicated to be denser in our investigation boreholes) and must be compacted by several passes of a
vibrating plate or minimum 4 tonne vibrating smooth drum roller, in conjunction with surface application
of ample water, to achieve the required compaction.
Due to the potential for development of poor trafficability during construction, placement of a minimum
150 mm thick granular working platform may be required across laydown areas. Specific platform
design would be required prior to mobilisation and trafficking of any heavy mobile plant on the site (e.g.
mobile cranes, concrete pumps or piling rigs).
Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate
the ground, making un-sealed surface drainage ineffective for the control of flows. Any sealed areas




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                            17

Page 23

should be graded to ensure free drainage of stormwater away from construction areas, and to a control
point(s).

6.1.2       Excavations
Excavations through the soils should be achievable using conventional earthmoving plant
(e.g. excavators with toothed buckets). Temporary, unsurcharged cuts in the very loose to loose sand
could be formed at 1V:2H, and at 1V:1.5H in medium dense (or denser) sand, for batters up to 4 m in
height. Flatter batters or temporary retention may be required if groundwater seepage is encountered or
if sloughing of dry sand occurs at the batter surface. Deeper cuts, if required, may require temporary
shoring, unless assessed and approved by Tectonic during construction.
Permanent cuts or fills greater than 1 m must be retained. Permanent cut and fill batters up to 1 m high
shall not exceed 1V:2.5H. Any permanent soil and fill batters will require erosion protection (e.g.
revegetation or surface protection).
It is likely that the temporary batter slopes will not be able to be achieved due to spatial constraints.
Thus, temporary shoring will likely be required, as per the recommendations in Section 6.3 below.
Excavations in close proximity to existing structures and infrastructure (e.g. underground services in
along the eastern property boundary), including neighbouring properties, will need to be specifically
designed to prevent undermining. If undermining is a potential issue the existing structures may need to
be underpinned or excavations may require temporary shoring.
The advice of a suitably qualified and experienced structural RPEQ must be sought regarding any
potential undermining and design and construction of any underpins/temporary shoring (if required).
The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).

6.1.3       Filling
The natural sandy soils where free of deleterious materials (e.g. vegetation, organics etc.) may be reused
as structural fill, subject to appropriate moisture adjustment. It should be noted that compaction of such
relatively ‘clean’ sands as structural fill requires the addition of substantial volumes of water (‘flooding’)
combined with the use of vibratory compaction equipment (typically a smooth drum roller or heavy
vibrating plate). Should importation of fill be required, it is recommended that such fill should comply
with the following:
   Minimum CBR of 10 %
   Maximum plasticity index of 15 %
   Shrink-swell index ≤ 1 %
   Maximum particle size of 100 mm
Any fill should be compacted at moisture contents within the range of ±2 % of optimum moisture
content for Standard Compaction. Fill material should be placed in 250 mm thick (loose thickness) layers
and be compacted by repeated rolling using a minimum 4 tonne smooth drum roller (or equivalent, with
vibration on if safe to do so) to achieve a dry density ratio of at least 95 % of the maximum Dry Density
Ratio (DDR), based upon the Standard Compaction method, or a Dry Density Index of at least 70 %.
Confirmatory compaction testing must be carried out at regular intervals. A minimum of two tests per
vertical lift is recommended where structural fill heights are to exceed 300 mm. Further details for



Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                           18

Page 24

control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for
Commercial and Residential Developments.


6.2         Building Foundations
6.2.1       Indicative Site Classification
Site classification for footing design is determined in accordance with AS 2870-2011 Residential Slabs and
Footings, and depend on the depth of cut / fill undertaken at a site, variations in the natural soil profile,
and the reactivity of the in situ soil and any imported fill materials.
Based on the results of the investigation, it is recommended that a site classification equivalent to Class
M is used in relation to the assessment of flexibility requirements for ground slabs, footing and plumbing
design. The footing design recommendations given below must also be considered.

6.2.2       Footing Design
No design loadings were available at the time of reporting. Footings for the proposed residence and any
ancillary structures (e.g. retaining walls, pool etc.) must penetrate through any fill materials and
unsuitable natural soils (i.e. very loose to loose sands) to found at least 1 m into medium dense (or
denser) natural sands. High-level footings may be possible in areas of deeper excavation where medium
dense to dense (or denser) sands are exposed at or near the subgrade. This would be subject to an
assessment by a suitably qualified and experienced geotechnical RPEQ (including verification testing).
High-level footings, so founded, could be designed using a maximum allowable bearing pressure of
100 kPa.
Elsewhere (excluding the shear pile wall), based on the results of the investigation, pile founding depths
for the building of up to 3.5 m BGL (existing ground levels) are anticipated. Deeper piles may be
necessary subject to an assessment of building loads at the detailed design stage.
Excluding the shear pile wall, steel screw piles would be an appropriate footing option, where required.
Piles may be designed using a maximum allowable end bearing pressure of 600 kPa in medium dense
sands, or at least 1 MPa in the deeper dense sands. Due to the presence of very loose to loose upper
sands, together with the restricted site conditions and close proximity of adjacent houses, open bored
piers or driven piles are not recommended for this site. A possible alternative to screw piles could be
grout-injected, CFA piles, provided that construction water loss is carefully monitored and controlled.
Steel reinforced concrete bored piles may be possible; however, the use of sacrificial liners (e.g.
‘Formatube’) would be required.
If steel screw piles are adopted, it will be important to ensure close supervision of installation, as piling
may not encounter sufficient drilling resistance (from torque measurement) in sands at the suggested
founding depth, and piles could extend to much greater depth than necessary.
It is therefore recommended that site specific dynamic load testing be conducted on screw piles, if
adopted, at a minimum.
Where tension or compression capacity developed in the footings is critical for the future structure (e.g.
resistance to uplift forces from high winds), then cyclic load tests (including measurement of deflections
under tension and compression cycles) should also be undertaken prior to construction. Kentledge for
static testing, or simulated cyclic loads, should prove the piles to a minimum of two times the expected
working load within tolerable deflections.



Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                               19

Page 25

Ultimately, the advice of a specialist piling contractor should be sought regarding pile design and
construction. However, where steel screw piles are adopted site specific load testing and the results of
this geotechnical investigation should be considered by the structural engineers in validating any generic
torque to capacity ratios provided as part of the proposed design. An assessment of potential vibration
effects on nearby structures and monitoring requirements should also be included.
Footing design should also account for potential soil reactivity to be equivalent to Class M.
All footings should found such that they are not adversely affected by any adjacent excavations, trenches,
retaining walls, or in ground structures that are not designed to support building loads. Footings should
found at least below a plane extending 1 m horizontally from the base of
trenches/excavations/swimming pool, then rising up at 1V:1H, as illustrated in Text Figure 11.
Where consideration is given to the use of high level footings to the western side of the residence,
structural designers should allow for the deepest founding depth of either:
   Founding footings below the zone of active earth pressure (within this zone reduced foundation
    capacity and adverse interaction with the seaward retention system are anticipated); or
   The arrangement should comply with Text Figure 11, with the relevant plane taken from the
    equivalent ground level at the front of the exposed piled wall following the most onerous erosion
    Case 2 in the stability modelling (Ref. Section 5.2.1).




         Text Figure 11: Zone of influence diagrams – footings to be founded below these lines

It is recommended that footings be inspected by a suitably qualified and experienced engineer prior to
placement of steel reinforcement and pouring of concrete to confirm allowable bearing pressures and
cleanliness of excavations.
If any soil conditions encountered during construction are found to differ from those noted in the
geotechnical investigation, Tectonic should be notified immediately and an inspection carried out to
determine if changes to footing design are required.


6.3         Temporary and Permanent Retention
Excavations are expected to range up to around 4 m BGL (existing ground levels) and, given that the
planned excavation extends close to some of the site boundaries and underground infrastructure (e.g.
underground services), some form of temporary shoring will likely be required.
Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by
use of sheet piles, however Unitywater and NC requirements for their infrastructure may restrict the use
of sheet piles. Shoring of deeper cuts would likely require lateral restraint, and this is conventionally


Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                       20

Page 26

achieved by helical steel anchors (similar to screw piles); and the proximity to neighbouring structures
would require permissions to be obtained for subterranean access. Therefore, where lateral support by
cantilever only is not feasible, it is suggested that internal struts/propping be considered to provide
lateral restraint for the shoring system.
Anchored or propped sheet piles may require pre-drilling to prevent adverse vibrations during sheet pile
installation (where penetration of the deeper dense sands is required).
Other shoring methods that could be considered include bored contiguous or secant piles.
Conventional non-contiguous or soldier pile walls are not feasible for the proposed development due to
the likelihood that loose sands would ‘flow’ through gaps between the piles. Their use may however be
possible where additional grout panels are included in the design.
An advantage of contiguous or secant pile wall retention systems is that they are ultimately used for the
permanent walls, whereas sheet piles would be temporary to provide retention during construction only,
therefore requiring a permanent structural wall to be constructed. Bored pile walls generally require
greater width (horizontally) for installation as compared to sheet piles and are often more expensive.
The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation
of the proposed retention system. It will be necessary to conduct numerical analysis to optimise the
retention system. Detailed design will also need to account for relevant factors of safety to maintain the
temporary and long-term stability of the retention system.
Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping
backfill, will require engineer design and certification of construction. Retaining wall design should be
carried out in accordance with AS4678-2002 Earth retaining structures.
Design for temporary and permanent retaining structures could be carried out using a pressure
distribution applicable to the wall type and based on the parameters listed in Table 6. These values do
not include allowance for hydrostatic pressures, backslopes (assumed to be horizontal), nor transient (e.g.
construction) or adjacent footing loadings.

Table 6: Retaining Structure Design Parameters
                                                                   Lateral earth pressure coefficients
                     Unit weight                                   Ka                    Ko              Kp
 Retained material                         Friction angle (°)
                     (kN/m3)                                       (Cantilever wall)     (Non-yielding
                                                                                         wall)

 Very Loose/Loose
                             17                    27                     0.38                  0.55          2.66
 Sands

 Medium Dense
                             18                    34                     0.28                  0.44          3.54
 Sands

 Dense (or Denser)
                             19                    36                     0.26                  0.41          3.85
 Sands

 Future Controlled
                              *                     *                       *                     *            *
 Fill*

Note:   * Depends on fill material type and level of compaction.

Retaining structures must be founded as per the recommendations in Section 6.2.2 above with the
footings also designed to account for lateral loads imposed by the retaining wall. Detailed design must
include an assessment of internal and global stability.



Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                                    21

Page 27

6.4         Drainage
Adequate site drainage must be installed to ensure that stormwater runoff is directed away from building
walls, footings, batters and retaining walls. Although unlikely, if groundwater seepage is encountered
during excavations, Tectonic must be notified to assess the impact on stability.
Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in
filter ‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and
site-specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to
be accounted for in the design of the retaining structure.
Collected roof water should be directed by pipes to the council stormwater system along The Esplanade.
Hydraulic design should be such that under no circumstances are uncontrolled stormwater flows
permitted over the dune face; where channelised erosion and scour features could be allowed to
develop.
Design of the stormwater system should be undertaken by a suitably qualified and experienced RPEQ.



7.          Conclusion
Based on the findings of our assessment it is concluded that a Low Risk of slope instability could be
achieved for the proposed development, subject to the following:
    Implementation of the recommendations given in this report in formulating the feasibility of the
     development, and preparing the final design; and
    Review of the detailed design by Tectonic to confirm compliance with the recommendations herein.

Confirmation of the deeper subsurface profile present along the eastern boundary would be required to
enable detailed design of the shear pile wall system, if required, via further ground investigation
following access being facilitated by the demolition of the existing residence. This should comprise a
borehole taken to a depth in the order of 20 m BGL, using a rotary drill rig capable of solid flight
augering and deep cased wash boring, with standard penetration tests (SPTs).



8.          Limitations
Your attention is drawn to the document Limitations, which is included in Appendix D of this report. The
statements presented in this document are intended to advise you of what your realistic expectations of
this report should be, and to present you with recommendations on how to minimise the risks associated
with the services provided by Tectonic for this project.




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                                                        22

Page 28

LEGEND

CLIENT PROJECT “- APPROX. HAND AUGER LOCATIONS
CHRISTIAN SEYMOUR GEOTECHNICAL INVESTIGATION AND SLOPE STABILITY ASSESSMENT FOR PROPOSED RESIDENCE

D 17 THE ESPLANADE, SUNSHINE BEACH 4 APPROX. SECTION LINE A-A'
KAB 13/11/20: DRAWING TITLE NOTES
‘ SITE PLAN BASEMAP C

CHECKED BY
ACD 13/11/20
PROJECT NO. DOC NO. FIGURE NO.
SCALE

@ APPROX. DCP LOCATIONS
TESY OF NE, Al 5
1

REVISION

 

Page 29

 

 

ELEVATION (m AHD)

 

 

 

 

 

 

 

 

 

 

 

0 10 20 30 40 50 60 70 80 90 100
35 35
30 30
S on The Esplanade
Bae
25 25
5 pprox Ground Surface.

20 am 20

ood

15 ” 15

g
Ban
«
19) <-> ~~ 10
Sunshine Beach
”
2
‘ o ‘
»

5 0
-5| 5
-10| -10
-15| -15
-20| -20

0 10 20 30 0 30 60 70 80 90 100
DISTANCE (m)
POST LEGEND MATERIAL GRAPHIC
~
ee z B Fu
| aed
= Cie
ic piety
SR
as
‘ W300 ™ ™ op "18/11/2025
° SS Se Christian Seymour San ry
V 1:300 | 17 The Esplande, Sunshine Beach AD 18/11/2025
ae ee ee Proposed Residence H 1:300_V_1:300 [a3
Doh et Eo Coord Sytem: WGAZ020 Zone 58 Height Dctume: AHO Subsurface Section A- A’ man 089 =

 

 

 

 

 

Page 30

      Appendix A
      Borehole/DCP Reports & Explanatory Notes




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                23

Page 31

                                                                                                                                                                                                                                                                                                                                                                                                                                          Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                                                BH1
                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 1 of 1

                                                                                                                                                                                                             Engineering Log - Borehole                                                                                                                                 Project No.:                     25289

                                                                                                                                                                                                                  Client:                                     Christian Seymour                                                                                         Commenced:                       24/9/2025
                                                                                                                                                                                                                  Project Name:                               Proposed Residence                                                                                        Completed:                       24/9/2025
                                                                                                                                                                                                                  Hole Location:                              17 The Esplande, Sunshine Beach                                                                           Logged By:                       BC
                                                                                                                                                                                                                  Hole Position:                              511227.0 m E 7079650.0 m N MGA2020 Zone 56                                                                Checked By:                      OD
                                                                                                                                                                                                                  Drill Model and Mounting:                                    Hand Auger                                               Inclination: -90°               RL Surface:                 24.00 m
                                                                                                                                                                                                                  Hole Diameter:                                               100 mm                                                   Bearing:     360°               Datum:                      AHD             Operator:       KAB

                                                                                                                                                                                                                                     Drilling Information                                                                                              Material Description and Observations




                                                                                                                                                                                                                                                                                                                                                                                 Relative Density
                                                                                                                                                                                                                                                                                                          Classification                                                                                                            DCP TEST
                                                                                                                                                                                                                      Penetration




                                                                                                                                                                                                                                                                                                                                                                                                      Pocket




                                                                                                                                                                                                                                                                                                                                                                                 Consistency
                                                                                                                                                                                                                                                                                            Graphic Log


                                                                                                                                                                                                                                                         Samples                                                                          Material Description
                                                                                                                                                                                                                                                                                                                                                                                                    Penetrometer




                                                                                                                                                                                                                                                                                                                                                                                 Condition
                                                                                                                                                                                                                                                                    Recovery




                                                                                                                                                                                                                                                          Tests                                                             soil type: plasticity or particle characteristics,




                                                                                                                                                                                                                                                                                                                                                                                 Moisture
                                                                                                                                                                                                                                                                                                                                                                                                       UCS                      Blows per 100 mm
                                                                                                                                                                                                                                                                                                          Symbol
                                                                                                                                                                                                             Method




                                                                                                                                                                                                                                                                                                                             secondary and minor components, colour
                                                                                                                                                                                                                                    Water




                                                                                                                                                                                                                                                         Remarks                RL Depth                                                                                                               (kPa)
                                                                                                                                                                                                                                                                                (m) (m)                                                                                                                             0       5      10      15    20   25




                                                                                                                                                                                                                                                                                                                                                                                                     100
                                                                                                                                                                                                                                                                                                                                                                                                     200
                                                                                                                                                                                                                                                                                                                                                                                                     300
                                                                                                                                                                                                                                                                                                                                                                                                     400
                                                                                                                                                                                                                                                                                                                                                                                                     500
                                                                                                                                                                                                                                                                                                                           Clayey SAND (FILL), fine to coarse grained,
                                                                                                                                                                                                                                                                                                                           dark grey, medium plasticity clay fines, with         D to
                                                                                                                                                                                                                                                                                                                                                                                            L
                                                                                                                                                                                                                                                                                                                           organics, with fine to coarse sized subangular         M
                                                                                                                                                                                                                                                                                                                           to subrounded gravels
                                                                                                                                                                                                                                                                                                            SP
                                                                                                                                                                                                                                                      DS_0.5-0.6m                                                          SAND, fine to medium grained, grey brown,
                                                                                                                                                                                                                                                                                                                           (DUNE SAND)
                                                                                                                                                                                                                                                                                                                           becoming grey                                                  MD
                                                                                                                                                                                                                                                                                23.0




                                                                                                                                                                                                                                                                                       1                                                                                                                                Augered to 1.1m
                                                                                                                                                                                                                                                                                                                           becoming pale grey
                                                                                                                                                                                                                                    Not Encountered




                                                                                                                                                                                                                                                                                                                                                                                            D
                                                                                                                                                                                                                                                                                22.0




                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                             HA




                                                                                                                                                                                                                                                                                                                                                                                   M
TECTONIC 3.00.2 LIB.GLB Log 1 TECTONIC BOREHOLE 25289.GPJ <<DrawingFile>> 18/11/2025 10:57 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                                                                                                                                                                                                                        Augered to 3.0m
                                                                                                                                                                                                                                                                                21.0




                                                                                                                                                                                                                                                                                       3
                                                                                                                                                                                                                                                                                                                                                                                          VD




                                                                                                                                                                                                                                                                                                                                                                                                                        Augered to 4.0m
                                                                                                                                                                                                                                                                                20.0




                                                                                                                                                                                                                                                                                       4
                                                                                                                                                                                                                                                                                                                           Hole Terminated at 4.00 m
                                                                                                                                                                                                                                                                                                                           Refusal on very dense sand
                                                                                                                                                                                                                                                                                19.0




                                                                                                                                                                                                                                                                                       5
                                                                                                                                                                                                                                                                                18.0




                                                                                                                                                                                                                                                                                       6




                                                                                                                                                                                                                       Method                                           Penetration                                        Water                   Samples and Tests                        Moisture Condition               Consistency/Relative Density
                                                                                                                                                                                                                  AD/T-Auger Drilling TC Bit                                     VE - Very Easy        Level (Date)                         U## - Undisturbed Sample (## mm)                    D - Dry                          VS - Very Soft
                                                                                                                                                                                                                  AD/V-Auger Drilling V Bit                                      E - Easy                                                   DS - Disturbed Sample                               M - Moist                        S - Soft
                                                                                                                                                                                                                  RT - Rotary Tri-cone Bit                                                             Inflow                               BDS- Bulk Disturbed Sample                          W - Wet                          F - Firm
                                                                                                                                                                                                                  RD - Rotary Drilling                                           F - Firm                                                   SPT - Standard Penetration Test                                                      VSt - Very Stiff
                                                                                                                                                                                                                                                                                                       Partial Loss
                                                                                                                                                                                                                  NMLC -Rock Core                                                H - Hard                                                                                                                                        H - Hard
                                                                                                                                                                                                                                                                                 VH - Very hard       Complete Loss
                                                                                                                                                                                                                  HA - Hand Auger                                                                                                                                                                   Plastic Limit                VL - Very Loose
                                                                                                                                                                                                                                                                               Graphic Log/Core Loss                                                                                                                             L   - Loose
                                                                                                                                                                                                                                                                                                                                                   Classification Symbols                              < PL                      MD - Medium Dense
                                                                                                                                                                                                                                                                                  Core recovered (hatching                                         and Soil Descriptions                                                         D - Dense
                                                                                                                                                                                                                                                                                  indicates material)                                                                                                  = PL
                                                                                                                                                                                                                                                                                                                                                    Based on Unified Soil                              < PL                      VD - Very Dense
                                                                                                                                                                                                                                                                                  Core loss                                                         Classification System                                                        Fr - Friable

Page 32

                                                                                                                                                                                                                                                                                                                                                                                                                                      Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                                            BH2
                                                                                                                                                                                                                                                                                                                                                                                                                                      Page 1 of 1

                                                                                                                                                                                                             Engineering Log - Borehole                                                                                                                             Project No.:                     25289

                                                                                                                                                                                                                  Client:                                 Christian Seymour                                                                                         Commenced:                       24/9/2025
                                                                                                                                                                                                                  Project Name:                           Proposed Residence                                                                                        Completed:                       24/9/2025
                                                                                                                                                                                                                  Hole Location:                          17 The Esplande, Sunshine Beach                                                                           Logged By:                       BC
                                                                                                                                                                                                                  Hole Position:                          511206.0 m E 7079665.0 m N MGA2020 Zone 56                                                                Checked By:                      OD
                                                                                                                                                                                                                  Drill Model and Mounting:                                Hand Auger                                               Inclination: -90°               RL Surface:                 27.00 m
                                                                                                                                                                                                                  Hole Diameter:                                           100 mm                                                   Bearing:     360°               Datum:                      AHD             Operator:       KAB

                                                                                                                                                                                                                                     Drilling Information                                                                                          Material Description and Observations




                                                                                                                                                                                                                                                                                                                                                                             Relative Density
                                                                                                                                                                                                                                                                                                      Classification                                                                                                            DCP TEST
                                                                                                                                                                                                                      Penetration




                                                                                                                                                                                                                                                                                                                                                                                                  Pocket




                                                                                                                                                                                                                                                                                                                                                                             Consistency
                                                                                                                                                                                                                                                                                        Graphic Log


                                                                                                                                                                                                                                                      Samples                                                                         Material Description
                                                                                                                                                                                                                                                                                                                                                                                                Penetrometer




                                                                                                                                                                                                                                                                                                                                                                             Condition
                                                                                                                                                                                                                                                                Recovery




                                                                                                                                                                                                                                                       Tests                                                            soil type: plasticity or particle characteristics,




                                                                                                                                                                                                                                                                                                                                                                             Moisture
                                                                                                                                                                                                                                                                                                                                                                                                   UCS                      Blows per 100 mm
                                                                                                                                                                                                                                                                                                      Symbol
                                                                                                                                                                                                             Method




                                                                                                                                                                                                                                                                                                                         secondary and minor components, colour
                                                                                                                                                                                                                                    Water




                                                                                                                                                                                                                                                      Remarks               RL Depth                                                                                                               (kPa)
                                                                                                                                                                                                                                                                            (m) (m)                                                                                                                             0       5      10      15    20   25




                                                                                                                                                                                                                                                                                                                                                                                                 100
                                                                                                                                                                                                                                                                                                                                                                                                 200
                                                                                                                                                                                                                                                                                                                                                                                                 300
                                                                                                                                                                                                                                                                                                                                                                                                 400
                                                                                                                                                                                                                                                                                                                                                                                                 500
                                                                                                                                                                                                                                                                                                                       Silty SAND (FILL), fine to medium grained,
                                                                                                                                                                                                                                                                                                                       dark grey, with rootlets
                                                                                                                                                                                                                                                                                                                                                                                        L


                                                                                                                                                                                                                                                                                                        SP             SAND, fine to medium grained, grey, (DUNE
                                                                                                                                                                                                                                                                                                                       SAND)

                                                                                                                                                                                                                                                                                                                                                                                                                    Augered to 1.0m
                                                                                                                                                                                                                                                                            26.0




                                                                                                                                                                                                                                                                                   1
                                                                                                                                                                                                                                    Not Encountered




                                                                                                                                                                                                                                                                                                                                                                                                                    HW
                                                                                                                                                                                                                                                                                                                                                                                       VL

                                                                                                                                                                                                                                                                                                                                                                               M
                                                                                                                                                                                                             HA




                                                                                                                                                                                                                                                                            25.0




                                                                                                                                                                                                                                                                                   2                                   becoming pale grey
                                                                                                                                                                                                                                                                                                                                                                                        L
TECTONIC 3.00.2 LIB.GLB Log 1 TECTONIC BOREHOLE 25289.GPJ <<DrawingFile>> 12/11/2025 13:58 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                                                                                                                                                                                      MD
                                                                                                                                                                                                                                                                            24.0




                                                                                                                                                                                                                                                                                   3
                                                                                                                                                                                                                                                                                                                       Hole Terminated at 3.00 m
                                                                                                                                                                                                                                                                                                                       Target depth
                                                                                                                                                                                                                                                                            23.0




                                                                                                                                                                                                                                                                                   4
                                                                                                                                                                                                                                                                            22.0




                                                                                                                                                                                                                                                                                   5
                                                                                                                                                                                                                                                                            21.0




                                                                                                                                                                                                                                                                                   6




                                                                                                                                                                                                                       Method                                       Penetration                                        Water                   Samples and Tests                        Moisture Condition               Consistency/Relative Density
                                                                                                                                                                                                                  AD/T-Auger Drilling TC Bit                                 VE - Very Easy        Level (Date)                         U## - Undisturbed Sample (## mm)                    D - Dry                          VS - Very Soft
                                                                                                                                                                                                                  AD/V-Auger Drilling V Bit                                  E - Easy                                                   DS - Disturbed Sample                               M - Moist                        S - Soft
                                                                                                                                                                                                                  RT - Rotary Tri-cone Bit                                                         Inflow                               BDS- Bulk Disturbed Sample                          W - Wet                          F - Firm
                                                                                                                                                                                                                  RD - Rotary Drilling                                       F - Firm                                                   SPT - Standard Penetration Test                                                      VSt - Very Stiff
                                                                                                                                                                                                                                                                                                   Partial Loss
                                                                                                                                                                                                                  NMLC -Rock Core                                            H - Hard                                                                                                                                        H - Hard
                                                                                                                                                                                                                                                                             VH - Very hard       Complete Loss
                                                                                                                                                                                                                  HA - Hand Auger                                                                                                                                                               Plastic Limit                VL - Very Loose
                                                                                                                                                                                                                                                                           Graphic Log/Core Loss                                                                                                                             L   - Loose
                                                                                                                                                                                                                                                                                                                                               Classification Symbols                              < PL                      MD - Medium Dense
                                                                                                                                                                                                                                                                              Core recovered (hatching                                         and Soil Descriptions                                                         D - Dense
                                                                                                                                                                                                                                                                              indicates material)                                                                                                  = PL
                                                                                                                                                                                                                                                                                                                                                Based on Unified Soil                              < PL                      VD - Very Dense
                                                                                                                                                                                                                                                                              Core loss                                                         Classification System                                                        Fr - Friable

Page 33

                                                                                                                                                                                                           CLIENT      : Christian Seymour                                                                                                          SHEET         : 1 OF 1
                                                                                                                                                                                                           CONTRACTOR :
                                                                                                                                                                                                           PROJECT     : Proposed Residence
                                                                                                                                                                                                           LOCATION    : 17 The Esplande, Sunshine Beach
                                                                                                                                                                                                           PROJECT No. : 25289

                                                                                                                                                                                                                                                       TEST: DCP1                                               TEST: DCP2                                               TEST: DCP3
                                                                                                                                                                                                                       LOGGED: BC 24/9/2025 CHECKED: OD                         LOGGED: BC 24/9/2025 CHECKED: OD                         LOGGED: BC 24/9/2025 CHECKED: OD
                                                                                                                                                                                                           Depth (m)




                                                                                                                                                                                                                                                                    Depth (m)




                                                                                                                                                                                                                                                                                                                             Depth (m)
                                                                                                                                                                                                                                    Blows per 100 mm                                         Blows per 100 mm                                         Blows per 100 mm
                                                                                                                                                                                                                       0        5     10        15      20    25                0        5     10        15      20    25                0      5       10        15      20    25

                                                                                                                                                                                                                           HW                                                       HW




                                                                                                                                                                                                             1                                                        1                                                        1




                                                                                                                                                                                                             2                                                        2                                                        2
TECTONIC 3.00.2 LIB.GLB Log IS DCP 3 PER PAGE 25289.GPJ <<DrawingFile>> 12/11/2025 13:58 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                             3                                                        3                                                        3




                                                                                                                                                                                                             4                                                        4                                                        4




                                                                                                                                                                                                             5                                                        5                                                        5




                                                                                                                                                                                                             6                                                        6                                                        6




                                                                                                                                                                                                           Comments                                                 Comments                                                 Comments

Page 34

                                                                                           TERMS USED ON LOGS

DRILLING/EXCAVATION METHOD
AD*        Auger Drilling          RD      Rotary Blade or Drag bit            NQ         Diamond Core - 47 mm
*V         V-Bit                   RT      Rotary Tri-cone bit                 NMLC       Diamond Core - 52 mm
*T         TC-Bit                  RA      Rotary Air                          HQ         Diamond Core - 63 mm
HA         Hand Auger                                                          HMLC       Diamond Core – 63mm
ADH        Hollow Auger                                                        BH         Tractor Mounted Backhoe
                                                                               EX         Tracked Hydraulic Excavator



WATER
GROUNDWATER NOT             The observation of groundwater, whether present or not, was not possible due to drilling water,
OBSERVED                    surface seepage or cave in of the borehole/test pit.
GROUNDWATER NOT            The borehole/test pit was dry soon after excavation. However, groundwater could be present in
ENCOUNTERED                less permeable strata. Inflow may have been observed had the borehole/test pit been left open
                           for a longer period.

SAMPLING AND TESTING
SPT                Standard Penetration Test to AS1289.6.3.1-2004
5,4,10 N=14        5,4,10 = Blows per 150mm. N = Blows per 300mm penetration following 150mm seating
30/65mm            Where practical refusal occurs, the blows and penetration for that interval are reported
RW                 Penetration occurred under the rod weight only
HW                 Penetration occurred under the hammer and rod weight only
HB                 Hammer double bouncing on anvil
DS                 Disturbed sample
BDS                Bulk disturbed sample
FV                 Field vane shear test expressed as uncorrected shear strength (sv = peak value, sr = residual value)
PP                 Pocket penetrometer test expressed as instrument reading in kPa
U50                Thin walled tube sample - number indicates nominal sample diameter in millimetres
DCP                Dynamic cone penetration test
CPT                Electronic cone penetration test
CPTu               Electronic cone penetration test with pore pressure (u) measurement



                                                                                                                       Rev1
                                                                                                                 August 2024

Page 35

                                                                         METHOD OF SOIL DESCRIPTION
                                                                                      USED ON LOGS
CLASSIFICATION AND INFERRED STRATIGRAPHY
Soil is classified and described in borehole and test pit logs using the preferred method given in AS1726 – 2017.
The material properties are assessed in the field by visual/tactile methods.
Particle Size                                                                      Plasticity Properties

 Major          Sub Division           Particle Size
Division
          BOULDERS                     > 200 mm
           COBBLES                    63 to 200 mm
                  Coarse               19 to 63 mm
 GRAVEL           Medium               6.7 to 19 mm
                       Fine           2.36 to 6.7 mm
                  Coarse              0.6 to 2.36 mm
  SAND            Medium              0.21 to 0.6 mm
                   Fine               0.075 to 0.21
                SILT                  0.002 to 0.075
             CLAY                      < 0.002 mm
                                                          NOTE: The U line is an approximate upper bound for most materials.
                                                          Data which plot above the U line may represent unusual/problem soil
                                                          behavior, or unreliable data and should be considered carefully.

MOISTURE CONDITION                                               AS1726 - 2017

Coarse Grained Soils
Symbol       Term             Description
   D             Dry          Sands and gravels are free flowing.
   M             Moist        Soils are darker than in the dry condition & may feel cool. Sands and gravels tend to cohere.
   W            Wet           Soils exude free water. Sands and gravels tend to cohere
Fine Grained Soils
Symbol        Description
  w < PL      Moist, dry of plastic limit, (hard and friable or powdery)
  w = PL      Moist, near plastic limit, (soils can be moulded at a moisture content approximately equal to the plastic limit)
  w > PL      Moist, wet of plastic limit, (soils usually weakened and free water forms on hands when handling)
  w = LL      Wet, near liquid limit
  w > LL      Wet, wet of liquid limit

CONSISTENCY AND DENSITY                                         AS1726 - 2017
 Symbol      Term       Undrained Shear                       Symbol        Term              Density Index %        SPT “N” #
                           Strength
    VS           Very Soft             0 to 12 kPa               VL         Very Loose          Less than 15            0 to 4
    S              Soft               12 to 25 kPa                  L          Loose               15 to 35            4 to 10
    F              Firm               25 to 50 kPa              MD        Medium Dense             35 to 65           10 to 30
    St             Stiff              50 to 100 kPa              D            Dense                65 to 85           30 to 50
    VSt          Very Stiff          100 to 200 kPa              VD         Very Dense            Above 85           Above 50
     H            Hard             Above 200 kPa
In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour of
the material.
# SPT correlations are not stated in AS1726 – 2017, and may be subject to corrections for overburden pressure and
equipment type.




                                                                                                                               Rev3
                                                                                                                      November 2024

Page 36

      Appendix B
      Laboratory Test Certificate




Geotechnical investigation
19 November 2025 | 25289-001-Rev0   24

Page 37

Material Test Report
Report Number:      SL25-1262A-33
Issue Number:       1
                                                                                                                                                                                    Butler Partners (Regional) Pty Ltd
Date Issued:        01/10/2025                                                                                                                                                                      Sunshine Coast Laboratory
Client:             Tectonic Geotechnical PtyLtd                                                                                                                               1/6 Runway Drive Marcoola QLD 4565
                    924 David Low Way, Marcoola QLD 4564                                                                                                                                                     Phone: 0461 255 681
Contact:            Ashley Davey                                                                                                                                         Email: [email protected]
Project Number:     SL25-1262A                                                                                                                  Accredited for compliance with ISO/IEC 17025 - Testing
Project Name:       Tectonic
Project Location:   the Esplanade, Sunshine Beach
Client Reference:   25289
Work Request:       1903                                                                                                                        Approved Signatory: Chris Davidson
Sample Number:      SC25-1903A                                                                                                                                                      Laboratory Manager
                                                                                                                                                NATA Accredited Laboratory Number: 19529
Date Sampled:       26/09/2025
Dates Tested:       26/09/2025 - 29/09/2025
Sampling Method:    Sampled by Client
                    The results apply to the sample as received
Preparation Method: AS 1289.1.1 - Sampling and Preparation of Soils
Site Selection:     Selected by Client
Sample Location:    The Esplanade, Sunshine Beach , Depth: BH1 0.5-0.6
Material:           SAND with trace clay/silt and gravel - SP
Material Source:    UNKNOWN
                                                                                                                                               Particle Size Distribution
Particle Size Distribution (AS1289 3.6.1)
Sieve                     Passed %       Clay   Passing Limits                       Silt                                                                 Sand                                                    Gravel             Cob

                                                                                                                       0.075




                                                                                                                                                           0.425
4.75 mm                           100                                                                                          Sieve


                                                                                                                                       0.15




                                                                                                                                                                             1.18



                                                                                                                                                                                         2.36



                                                                                                                                                                                                      4.75
                                                                                                                                                    0.3



                                                                                                                                                                   0.6
                                                                                                                               (mm)
2.36 mm                            98                                                                         100

1.18 mm                            98
                                                                                                              90
0.6 mm                             97
0.425 mm                           87                                                                         80
                                                                                            Percent Passing




0.3 mm                             52                                                                         70
0.15 mm                             2
                                                                                                              60
0.075 mm                            1
                                                                                                              50

                                                                                                              40

                                                                                                              30

                                                                                                              20

                                                                                                              10



                                                                                                                                0.1           0.2                        1           2          3    4 5         10        20   30
                                                                                                                                                            Particle Size (mm)




                                                         This document shall not be reproduced except in full without approval of the laboratory.
 Report Number: SL25-1262A-33                                              Results relate only to the items tested/sampled.                                                                                           Page 1 of 1

Page 38

      Appendix C
      Extracts from AGS Guidelines (2007)
      Qualitative Terminology for Use Assessing Risk to Property
      & Some Guidelines for Hillside Construction




Geotechnical investigation
19 November 2025 | 25289-001-Rev0                                  25

Page 39

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                    Australian Geomechanics Vol 42 No 1 March 2007
   68039 Landslide Risk Management Issued 10/7/07

Page 40

                                       PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
               APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                     LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                          Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                         Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                             Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                             10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                    -2
B -    LIKELY                                     10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                   10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                   10-4                           H                         M                        L                       L                      VL
                                                    -5
E -    RARE                                       10                             M                          L                       L                      VL                      VL
                                                    -6
F -    BARELY CREDIBLE                            10                             L                         VL                      VL                      VL                      VL
      Notes:   (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
               (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                     time.


      RISK LEVEL IMPLICATIONS
                        Risk Level                                                                                  Example Implications (7)
                                                                 Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
        VH                      VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                 property.
                                                                 Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
         H                           HIGH RISK
                                                                 risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                 May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
         M                      MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                 implemented as soon as practicable.
                                                                 Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
         L                           LOW RISK
                                                                 required.
                                                                 Acceptable. Manage by normal slope maintenance procedures.
         VL                      VERY LOW RISK

       Note:   (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                     given as a general guide.




                                                                      Australian Geomechanics Vol 42 No 1 March 2007
      68039 Landslide Risk Management        Issued 10/7/07

Page 41

     PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



          APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                 GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL     Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
ASSESSMENT       stage of planning and before site works.                                             geotechnical advice.
PLANNING
SITE PLANNING    Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                 arising from the identified hazards and consequences in mind.
DESIGN AND CONSTRUCTION
                 Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                 or steel frames, timber or panel cladding.                                           filling.
 HOUSE DESIGN
                 Consider use of split levels.                                                        Movement intolerant structures.
                 Use decks for recreational areas where appropriate.
SITE CLEARING    Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
    ACCESS &     Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
   DRIVEWAYS     Council specifications for grades may need to be modified.                           geotechnical advice.
                 Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS       Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                 Minimise depth.                                                                      Large scale cuts and benching.
      CUTS       Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                 Provide drainage measures and erosion control.                                       Ignore drainage requirements
                 Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                 Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                 Use clean fill materials and compact to engineering standards.                       onto property below.
      FILLS      Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                 Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                      Include stumps, trees, vegetation, topsoil,
                                                                                                      boulders, building rubble etc in fill.
 ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
  & BOULDERS     Support rock faces where necessary.                                                  boulders.
                 Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                 Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
   RETAINING
                 Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
     WALLS
                 above.                                                                               Lack of subsurface drains and weepholes.
                 Construct wall as soon as possible after cut/fill operation.
                 Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                 Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
   FOOTINGS
                 Design for lateral creep pressures if necessary.
                 Backfill footing excavations to exclude ingress of surface water.
                 Engineer designed.
                 Support on piers to rock where practicable.
SWIMMING POOLS   Provide with under-drainage and gravity drain outlet where practicable.
                 Design for high soil pressures which may develop on uphill side whilst there
                 may be little or no lateral support on downhill side.
   DRAINAGE
                 Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                 Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
    SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                 Line to minimise infiltration and make flexible where possible.
                 Special structures to dissipate energy at changes of slope and/or direction.
                 Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                 Provide drain behind retaining walls.
   SUBSURFACE
                 Use flexible pipelines with access for maintenance.
                 Prevent inflow of surface water.
                 Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
    SEPTIC &
                 be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
    SULLAGE
                 Storage tanks should be water-tight and adequately founded.                          of landslide risk.
   EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
  CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
 LANDSCAPING
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
   DRAWINGS      Building Application drawings should be viewed by geotechnical consultant
   SITE VISITS   Site Visits by consultant may be appropriate during construction/
INSPECTION AND MAINTENANCE BY OWNER
   OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
RESPONSIBILITY   pipes.
                 Where structural distress is evident see advice.
                 If seepage observed, determine causes or seek advice on consequences.




                        Australian Geomechanics Vol 42 No 1 March 2007                                                                  113

Page 42

      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




114             Australian Geomechanics Vol 42 No 1 March 2007

Page 43

tect¢nic

Appendix D
Limitations

 

Page 44

Limitations

This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
accepted for the use of this document, in whole or in part, for any other purpose.
The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
and limitations. Tectonic did not perform a complete assessment of all possible conditions or
circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
not assume it has been provided. If a matter is not addressed, do not assume that any determination has
been made by Tectonic in regards to it.
Conditions may exist which were undetectable given that economic and time constraints limit the
practical extent of geotechnical investigation. Variations in conditions may occur between investigation
locations, and there may be special conditions pertaining to the site which have not been revealed by the
investigation and which have not therefore been taken into account in the document. Where variations
exist on site, additional studies and actions may be required.
Tectonic’s opinions are based upon information that existed at the time that the work was performed.
The passage of time, man-made or natural events, may alter the site conditions. It is understood that the
Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time
the site was visited and cannot be used to assess the effect of any subsequent changes in the quality of
the site, or its surroundings, or any laws or regulations.
Any assessments made in the preparation of this document are based on the conditions indicated from
published sources and the findings of the investigation described. Actual subsurface conditions may
differ from those indicated in the document (e.g. between boreholes or test pits). No warranty is
included, either express or implied, that the actual conditions will conform exactly to the assessments
contained in this document.
Where data supplied by the client or other external sources, including previous site investigation data,
have been used, it has been assumed that the information is correct unless otherwise stated. No
responsibility is accepted by Tectonic for incomplete or inaccurate data supplied by others.
This document is provided for the sole use by the Client and its professional advisers. No responsibility
whatsoever for the contents of this document will be accepted to any person other than the Client. Any
use which a third party makes of this document, or any reliance on or decisions to be made based on it,
is the responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered
by any third party as a result of decisions made or actions based on this document.




Limitations
August 2024 | Rev2

Page 45

             PO Box 899             tectonicgeo.com.au   [email protected]
          Buderim
Geotechnical         QLD 4555
             investigation
19 November 2025 | 25289-001-Rev0                                                   27

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.