Table 4: Soil Parameters Adopted for Slope/W Analyses
Material Description Unit Weight (kN/m3) Cohesion, c (kPa) Friction Angle, ɸ (degrees)
Very Loose/Loose Sands 17 0 27
Medium Dense Sands 18 0 34
Dense (or denser) Sand 19 0 36
* Depends on type of fill used and compaction achieved
Commonly adopted industry standards generally require minimum FOS values against slope instability of
1.3 and 1.5 for short-term and long-term conditions, respectively. Administering authorities such as NC
normally require a minimum FOS of 1.5 or greater for long-term conditions. Results of the stability
analyses are presented in Table 5, with the Slope/W outputs shown in Text Figures 9 & 10, overleaf.
Table 5: Slope/W Analysis Results
Analysis Description Factor of Safety
Case 1 Unstable, over-steep dune face following potential future erosion cut after
0.5
significant storm event
Case 2 Slope stability analysis following regression of the slope from Case 1 to a
long-term stable profile of 27°, with the eastern property boundary 1.5
protected by a shear pile wall
Results of the analyses indicates the following:
Case 1 – It was noted that the modelled storm erosion cut would not initially affect the site.
However, the dune face following the storm erosion cut would have an unstable FOS of 0.5, due to
the over-steep nature of this profile.
Case 2 – Following regression of the dune from the future erosion cut to a long-term stable profile
of 27°, if the eastern property boundary is protected by an engineer designed and certified shear pile
structure the potential critical slip surface takes the form of a deep-seated failure into the underlying
dense (or denser) sands. Such a slip surface results in a FOS of 1.5, allowing for retrogression of the
slope from Cases 1. The pile wall structure would be significant, with deep piles (at least 12 m BGL)
and a concrete capping beam, possibly in combination with lateral restraint due to the pile ‘upstand’
of about 5 m.
Geotechnical investigation
19 November 2025 | 25289-001-Rev0 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.