Original source · versioned page text
25289-001-Rev0 - The Esplanade (1)-compressed
should be graded to ensure free drainage of stormwater away from construction areas, and to a control point(s). 6.1.2 Excavations Excavations through the soils should be achievable using conventional earthmoving plant (e.g. excavators with toothed buckets). Temporary, unsurcharged cuts in the very loose to loose sand could be formed at 1V:2H, and at 1V:1.5H in medium dense (or denser) sand, for batters up to 4 m in height. Flatter batters or temporary retention may be required if groundwater seepage is encountered or if sloughing of dry sand occurs at the batter surface. Deeper cuts, if required, may require temporary shoring, unless assessed and approved by Tectonic during construction. Permanent cuts or fills greater than 1 m must be retained. Permanent cut and fill batters up to 1 m high shall not exceed 1V:2.5H. Any permanent soil and fill batters will require erosion protection (e.g. revegetation or surface protection). It is likely that the temporary batter slopes will not be able to be achieved due to spatial constraints. Thus, temporary shoring will likely be required, as per the recommendations in Section 6.3 below. Excavations in close proximity to existing structures and infrastructure (e.g. underground services in along the eastern property boundary), including neighbouring properties, will need to be specifically designed to prevent undermining. If undermining is a potential issue the existing structures may need to be underpinned or excavations may require temporary shoring. The advice of a suitably qualified and experienced structural RPEQ must be sought regarding any potential undermining and design and construction of any underpins/temporary shoring (if required). The above recommendations do not supersede any existing safety regulations or legislation applicable to excavations (e.g. limits on personnel entry into trenches). 6.1.3 Filling The natural sandy soils where free of deleterious materials (e.g. vegetation, organics etc.) may be reused as structural fill, subject to appropriate moisture adjustment. It should be noted that compaction of such relatively ‘clean’ sands as structural fill requires the addition of substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment (typically a smooth drum roller or heavy vibrating plate). Should importation of fill be required, it is recommended that such fill should comply with the following: Minimum CBR of 10 % Maximum plasticity index of 15 % Shrink-swell index ≤ 1 % Maximum particle size of 100 mm Any fill should be compacted at moisture contents within the range of ±2 % of optimum moisture content for Standard Compaction. Fill material should be placed in 250 mm thick (loose thickness) layers and be compacted by repeated rolling using a minimum 4 tonne smooth drum roller (or equivalent, with vibration on if safe to do so) to achieve a dry density ratio of at least 95 % of the maximum Dry Density Ratio (DDR), based upon the Standard Compaction method, or a Dry Density Index of at least 70 %. Confirmatory compaction testing must be carried out at regular intervals. A minimum of two tests per vertical lift is recommended where structural fill heights are to exceed 300 mm. Further details for Geotechnical investigation 19 November 2025 | 25289-001-Rev0 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.