25289-001-Rev0 - The Esplanade (1)-compressed
Contents
1. Introduction ............................................................................................................................................................ 1
2. Proposed Development ....................................................................................................................................... 1
3. Method of Investigation ......................................................................................................................................3
3.1 Fieldwork ...................................................................................................................................................................... 3
3.2 Geotechnical Laboratory Testing ........................................................................................................................ 3
4. Results of Investigation ...................................................................................................................................... 4
4.1 Site Description ......................................................................................................................................................... 4
4.2 Topography................................................................................................................................................................. 6
4.3 Geology ........................................................................................................................................................................ 7
4.4 Subsurface Conditions ............................................................................................................................................ 8
4.5 Groundwater............................................................................................................................................................... 8
4.6 Geotechnical Laboratory Test Results ............................................................................................................... 9
4.7 Surface Drainage ....................................................................................................................................................... 9
5. Slope Stability Assessment ............................................................................................................................... 10
5.1 Existing Conditions................................................................................................................................................. 10
5.2 Stability Assessment .............................................................................................................................................. 10
5.2.1 Quantitative Assessment .................................................................................................................... 13
6. Geotechnical Recommendations ..................................................................................................................... 16
6.1 Earthworks ................................................................................................................................................................. 17
6.1.1 Site Preparation and Trafficability................................................................................................... 17
6.1.2 Excavations .............................................................................................................................................. 18
6.1.3 Filling ......................................................................................................................................................... 18
6.2 Building Foundations ............................................................................................................................................ 19
6.2.1 Indicative Site Classification .............................................................................................................. 19
6.2.2 Footing Design....................................................................................................................................... 19
6.3 Temporary and Permanent Retention ............................................................................................................ 20
6.4 Drainage ..................................................................................................................................................................... 22
7. Conclusion ............................................................................................................................................................ 22
8. Limitations ............................................................................................................................................................ 22
Geotechnical investigation
19 November 2025 | 25289-001-Rev0 iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.