Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0831 - Approved Plans [As Published] · 142008.831

of 15

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

            
      

               

 

£
5
wo og ae
Be “
Exlsing 1dgea BE >
* 102 Erining Pore aa, Existing sewer cornsction fobe Karina 4 1 \
. New sewer concen fram exer aro \ \ LEGEND
toa = TING TUCKAROO TO

   

‘AINED (F

NO | ge

 

 

 
  

é ——
Esaag Soe * tg ta agg 4 She, Acca sanrg
tote ~ \ \ ‘te ppecified
DL — 1
tod
Vt
4 \ 4 Z, _

FF. BF Conc.
Refer Civil eng, drawings.

  

\ = Timber Bencrssat

Hard surface

=]
B Mutched area

 

a
Une of Basement Carpark betow

TOW RL. 11

y oe to - ” ao 4 Plant No.6 to be confirmed price to
i a we press vo construction.

 

 

 

PLANTING DISTANCES
FROM SERVICES
ain, DIST. SERVICE
‘Sn. POWER POLES
2m. UNDERGROUND SERVICES:
4m. STREET LIGHTS:
om, STORMWATER PIT

 

approx. DIST. DESCRIPTION
1m STREET TREES SSS
i FRON BACK OF KERB
CONC. DRIVEWAY Om. LANDSCAPING SETBACK WHERE
- ot VEHICLES PARK PARALLEL TO
0 . - oe KERB

 

 

‘ STREET TREES MUST BE ABLE TO ATTAIN A
o CLEAR TRUNK HEIGHT OF 1.8m ON MATURITY.

 

On bis pow erm tr
arcrmers cath,

 

   

     

LANDSCAPE CONTRACTOR TO VERIFY
’ LOCATION OF ALL SERVICES &
/ / \ BOUNDARIES PRIOR TO CONSTRUCTION.

EXPOSED AGGREGATE
FINISH TO SEATING AREA

 
 

 
 

DRINKING FOUNTAIN

              

 

 

 

 

 

 

Toe
ma aa ma
nee ‘i
fa TET tit
AS rer =

 

 

 

cn on "1 ’ FORE wabionon romvum.
<—— 2mm High masonary walls, “\ A Z

 

Exhaust Vani with

 

BLUE COUCH TURF
~—e oe AS SPECIFIED TO |:
. BALANCE OF LAND jt

 

 

 

 

 

= —
EXISTING TREE TO
BE REMOVED

°

    

         

@ 1800 CRS
NOTE: All overtiead power to 06 ralbcaied undergroune

7 wt

c
LANDGRAPHICS

  
            
      

CONCRETE
FOOTPATH
BY COUNCIL

LANORCAPE ARCHITECTS

 

BIN PICK UP AREA 5 : an earner

 

3 Proposed Office Development
tin David Low Way, Peregian Beach
TREET TREES TO BE MULCHED st . . (fe Cone Pao Landscape arr oe

‘AND EOGED WITH 200x75 TIMBER © *

SLEEPER LAID FLAT.

 

}_

wo? % Seer man hota ane

DAVID LOW WAY @ 1 Ry mennens wrens Movant MOREA 6 SERS

Core Architects - John Roberson

a2

    

   
  
   

 

= NE COAST 7 smernnnee pester Wats Haracape Pan
PROPOSED OFFICE DEVELOPMENT - PEREGIAN BEACH REGIC 4%. COUNCIL eee x =e

 

PLANS . or ROVED

 

LANDSCAPE OPERATIONAL WORKS

oo Eeting Wats ne

 

 

  
  

 

 

a om | oe
signature: porta Caan tee oven | oe
LEO | Pe at ee oases ~ pH
Date: 25. Hite 4 2EQ: OTE santos ac em Sarees ve | ema
es

 

 

 

 

 

 

' UskHiiso| (Aor | or oF os c

 

ek

 

 
Full text of the other 14 pages

Page 2

 

 

Upnt pate LOM for Exvang Talsbe At
02 CALL x CALLIXA 5 xdsting sewer connection .
AUS dutx § stg Paved
Hew sewer conection fom LEGEND

POA labx 5, CAL LUx Lika

CALL x LOM lon x 5.
0 Lux LOM Ion x $ = . ‘Trees 09
epecified

LOM ionx 5 Shrubs, Accent planting
* Feta “ ns Bad Groundoowars.
’ as spedtied

 

CAL Capx1

 

Existing Sewer. =
tobe

s08 DIP Gam x4

q

LOM Ion x t

DIP cum x1 OIP cam x1 Fa De Oa) 20 SY ge ly aa: ee “ Existing Trees
. GRE RGx1 a to be fetalnad

lonx4 aa ALL wqux

aot u
Od i ea Concrete surfose
GRE RGx4 LOM Ion x1

BAN robx + '
LOM Jon x1 ZA concrerw Patn
RAMP BAN rob x G by others
FF. BF Cone, f
BAN robx 4 an? Refer Civil eng. drawings. COM lori = timer Benehoost
we GRE RGx1
BAN robx 1 BAN rob x7
LOM lon x1 LOM ton x2 tard surtaoe
BAN rob x1 RGx1
GRE RG x2
BAN robx1

SYZ Cas x
LOM con x

MEL Clal

CAL Eurx 1
a
AUS dulx3

MEL Cla x 2

CAL Capk 4

CAL Eurx2

Line of Basemnet Carpark below

TOW RL 11

SYZ Cas x2 DIA ton x 4 3 he ye hn : Py Kistul x8) ,
TEC hi x1 oa vey ' : BAC citx1 ‘, 4 . = \ \ | Pant nooo be confiimed prior lo
4 ut x LOM con x6 : \ \ .
e@ 3 : : 1 oat ausbulxs | j
A 1 oy
: Bantintx 11 PLANTING DISTANCES

PALMS TO BE 100L TRIPLE PLANTED . ‘ i y ERVICES
WITH STAGGERED TRUNK HEIGHTS -. ee I FROM 5 ce
TO BE SELECTED BY LANDGRAPHICS. BAC ctxt 3 woh. ost, _| seRviCe
BAC citx 1 CAR glax@ i an, UNDERGROUNO SERVICES
LOM con x8 4m, STREET UGHTS
2m, STORMWATER PIT

~ GRERGx1

 

CAL Eurx 1 Bicycha racks: GRE RG x2 FROM BACK OF KERB
CONC. DRIVEWAY ; Refer to shavt LAGS Y sm, LANDSCAPING SETBACK WHERE
" : ot 4 ‘ BAC cite? GRE RGx2 ‘ VEHICLES PARK PARALLEL TO
aa! PAN jas x3 . he BAC citx 4 : CAR glax8 x robx 4 “ . a
CAL Capx2 LOM con x8 ’ CAL LI x3 en ‘. SINEET TREES MUST BE ABLE TO ATTA A
Bicycle racks: f E 7 2 CLEAR TRUNK HEIGHT OF 1.8m ON MATURITY.
LOM ton x Reter to steel LAO . endx2 LOM con x : >
BAN CALLI x 3. ‘ on LANDSCAPE CONTRACTOR TO VERIFY
DIA cas x11 ELA rol x3 LOM con x | uy RG x2 GRE RG x1 : } . " LOCATION OF ALL SERVICES &
GRE RG x2 MOOK ong x 3 A BOUNDARIES PRIOR TO CONSTRUCTION.
x ‘ .
— yom ton x14
tobx 7
* x 2 x1
Tin nena MGLCOS x2 Va , 2 RG ie . ear? /
DIA lon x 12 : “ a WY 2 ' Nob 2, 7
. . 2 * > +
Exeust Vout wih iy ts eI /..
Pylon Sign Above Nas . oO
5 cores TOM SyZABx1 [BLUE COUCH TURF

Letter Boxes
GAL Eurx t__— . AS SPECIFIED TO

RGx2 BALANCE OF LAND.

aor ‘ " rob x2
Teme ag ee Main Zot ee me ee 5 SYZ HOTE: Al ovetnad power to bo relocetd uncOrDrDUND
FLA : Tombs EXISTING TREE
ret x1 . . TO BE REMOVED
a BAN IT .
GAR gta x 20
EtAcetx 4

 

BIN PICK UP AREA
CAR gla x 14
BAN Intx 1 Froposed Office Davolopment

. David Low Way, Peragian Beach
Ae BAN intx 1 , ELA retx' (7 Hew core, Pete Lancscane veins oa
LOM con x 4 © sow antde =

© Storm Water mar poke Mr Erik Hipwood of MORGAN & BEIERS
DAVID LOW WAY SUNE, NE GOAS™

Dy) esting Fe rytrant

REGION A a a

PLANS ~ COUNCIL 70 Beacon
3 AF ROVED

[Gee] etsteg store ot
Sionature(/}

To Gist Tear Ine
Date: 25 °/

 

     

 

 

PROPOSED OFFICE DEVELOPMENT - PEREGIAN BEACH
LANDSCAPE OPERATIONAL WORKS

       

 

—— | Eth ete

+ Eadsting Over hag power to bo taken uroergiound
te elactieal eng, detals
ee - — batty Senerine
NOTE sf servicus plotted tom Surveyors
inlornaton.

taxniiso| Lacz

 

 

Page 3

 

 

 

25 MPa concrete, pressure washed to expose aggregate.
AO.5m2 finished sample must be provided to the site
superintendent prior to commencement for approval, The
sample may form part of the final product. Amendments to the
aggregate mix ratios, depth of aggregate exposure or CCS.
saturation, may be made at this stage.

 

 

F62 Reinforcement located

PAVEMENT SCHEDULE

 

 

 

SEATING AREA IN FRONT GARDENS

 

JOINTS

 

+ Expansion joints to be at minimum 12m centres. To be located at edges of tile bands
where possible. 10mm thick closed ceil cross linked polyethylene foam or approved

equivatent.

 

 

  

1 erases
$34 me

 

Th

FOOTPATH PAVEMENT - DETAIL

 

central to the concrete width.

~_ Compacted sub-base and
SJ sub-grade Supply proof of
-——} compaction to site
superintendant,
+ Contraction joints to be at minimum 2.0m centres. Joints to be 25mm depth saw cut or

PAVING TYPE EXPOSED AGGREGATE
CONCRETE AS DETAILED

COLOUR CCS PAPERBARK

FINISH

10MM MARY RIVER
STONEAGGREGATE

 

FOOTPATH ALONG SHOP FRONT.
PAVING TYPE POUREO 125MM DEPTH

 

25MPA CONCRETE WITH
F62 LOCATED CENTRALLY
COLOUR NATURAL GREY
FINISH BROOM FINISH

 

 

 

 

 

 

 

PROVIDE IMPERVIOUS
MEMBRANE COATING TO
INSIDE OF PLANTER TO
MANUFACT. SPECIFICATIONS

PROVIDE GEOTEXTILE SURROUND
TO DRAINAGE CELL & AGGREGATE

LAYER
PROVIDE TOPPING LAYER

TO OBTAIN FALLS TO DRAINAGE

POINTS

PROVIDE AGGREGATE LAYER
TO TOP OF ORAINAGE CELL WITH

GEOTEXTILE SURROUND.

100mm MULCH
LAYER

      

SLOTTED PIPE
Smm BELOW PROVIDE 90 DIA SLOTTED

PIPE WITH GEOTEXTILE
SURROUND AND CAPPED TO.
TOP FOR MAINTENACE ACCESS

SELECT RENDER TO
MATCH BUILDING

 

 

ea ae”

  

 

Radius curve to!
corner of planters

PODIUM PLANTER DETAIL

 

      
        

PROVIDE IMPORTED
PODIUM MIX

PROVIDE DRAINAGE CELL
TO BOTTOM & SIDES.
CUT TO FIT (5mm TOLERANCE)

ORAINAGE LINE TO.
CONNECT TO STORMWATER
DRAINAGE SYSTEM

 

 

 

 

| 0 f

 

0)

50

 

ae

Spit Preventing Bracing,
Mi2 rod/bolt & fixings galvinised
all edges blunt,

 

 

Vertica! face to building
300mm Bollard spacings

to prevent vehicular access.
200x75 CCA treated Fi4
H'Wood posts.

All edges arrissed

finish with Koppers CN oil
or similar

CSC approved.

 

 

 

500

 

[ ‘Concrete footpath

  

{Concrete footing to Engineers detail
(300x400x600mm deep nominal)

 

 

100

 

—}-—Nominal size drainage aggregate.

 

 

400

 

 

FIXED TIMBER BOLLARD DETAIL NTS

 

 

 

 

PROPOSED PLANT SCHEDULE

 

"
K

  

 

 

 

 

 

 

 

y.

Code Botanical Name Common Name | ae read Size Oty.
x

TREES f
ALL equ Allocasuarina equisefitolia She-oak 7™m 2.5m 45 litre 8
BAC cil Backhousea citiodora Lemon Scented Myrtle | Gmto 15m) 2m 45 litre 5
BAN int Banksia integniolia Coastal Banksia 10m 3m 45 titre 7
DIP cam Diplogtottis campbell Small Leaved Tamarind) 6m “2m 45 lite 3
ELA ret Elasocarpus reticulatus Blueberry Ash 6m pm 45 live 10
PAN ped Pandanus pedunculatus * ‘Screw Pine 6m. en 200 litre 3
SHRUBS AND TUFTING PLANTS !
AUS dul Austromyrtus dulcis Midgon Berry 0.7m 4-2m 440 pot | 85
BAN rab | Banksia robur Swamp Banksia 1.5m 1.5m 200 pot 38
CALCap | Callistemon Captain Cook Bottlebrush 2m 1.5m 200 pot 4
CAL Eur | Catistemon Eureka Bottlebrush 4m 4.5m 200 pot 10
CAL LJ Caliistemon ‘Lite John’ im am 200 pot 33
CAR gla Carpobrotus giaucescens Little John Bottlebrush | 9.3m 0.5m 200 pot 50
OIA cae Dianewa caerulee Flax Lily O.Sm-1m | 9.5m 140 po, | 40
DIAton Dianetia longifolia Flax Lily 0.6m 0.5m 440 pot 2
GRERG | Greviles ‘Robyn Gordon’ Robyn Gordon 1m ‘1.2m 200 pot 40
MEL Cla | Melaleuca ‘Claret Tops' ‘A Owadl Paperbath 1.5in 1m 200p1 | 7
LOMcon | Lomandra confertifolia Little Con 0.3m 0.7m 440 83
LOM Ion Lomandra longifolia Mat Rush m \am 140 87
PAN jas Pandarea jasminoldes Pink Bower of Beauty | Climber Climber | 140por | 3
SYZAB Syzygium aus. "Aussie Boomer’ ly Ply 1.5m 1m soo po: | 4
SYzCas | Syzygiumcy. Cascade’ Lilly Pilly 3m 1.5m 300 pot | 9
TEC hit Tecomanthe hii Fraser Island Cimber | — climber gimber | 140p0t | 1

 

 

 

 

 

 

 

 

 

 

 

*Confirm all advanced stack selectians with LandGraphics prior

 

site delivery

X *Certification from the nursery is to be submitted to Councll, that the proposed Pandanus tec, var pedunculatus does not carry
the leaf hopper Jamelia australis, .

Plant No.s to be confirmad prior to
construction.

 

 

 

 

PLANTING DISTANCES
FROM SERVICES
min. DIST. _| SERVICE
3m. POWER POLE:
2m. UNDERGROUND SERVICES
am. STREETLIGHTS
2m, STORMWATER PIT

 

 

 

R

 

SUNSHINE GOA
EGIONAL COUNCIL

PLANS APPROVED

Signature:

    

appror, DIST, | DESCRIPTION

 

 

im, STRE!
FROM BACK OF KERB

0.5m, LANDSCAPING SETBACK WHERE.
VEHICLES FARK PARALLEL TO
KERB

 

 

STREET TREES MUST BE ABLE TO ATTAIN A
CLEAR TRUNK HEIGHT OF 1.9m ON MATURITY,

 

 

LANDSCAPE CONTRACTOR TO VERIFY
LOCATION OF ALL SERVICES &
BOUNDARIES PHIOR TO CONSTRUCTION,

 

 

 

 

   

BS ~ 15000

1 charge to Sunshine Cost

 

Price $165 00 plus gst
Trevor Roy
(Queendand Salas

|

Iteot Future Austalia Pty Lid
Be? Leitchs Ra Brenca’e OLD 4500
T. 4617 3205 1533

F. #61 7 3205 1536

MM, + 422 265 949

www. stroatturniture.com

supports powdercoated. Colour TBA

tens $470.00 each plus gst
wes $410.00 each plus pst

EXAMPLES: BENCH SEATING IN FRONT GARDENS

 

 

(

 

 

   

Planting Area

Turf

EXTRUDED CONCRETE EDGE DETAIL

 

Select Garden Sed Mulch

 

 

 

 

‘SPADE EDGE.
Ensure neal spade
edge is maintalned
to all street ees.

 

 

 

 

 

 

900min
sanerally Ox
depih of rootbatl

Ensure pit
edges are

 

tosmnny wh obey

porous “Generally ax width of roctbal)

PLANTING DETAILS - ADVANCED STOCK

 

 

 

NOTE:

Advanced tree stock planting
selection to council approval.
All street trees to have min.
1.2m clear trunk

 

 

 

£|

 

 

 

 

 

 

 

 

 

1800 x 50 x 50 Hwd slakes.

stakes to be chamfered, centrally
pointed & driven vertically Into
the ground outside the rootball

Approved securing material
such as Rubber tree ties or
50mm julemat/hessian tes

in figure 8 loops secured
loosely to tree & fixed to stake
with fathead galv. nails

100mm nom. compasied organic
mulch or counci approved. Form
shallow dish drain to base of tee.

Mound at pit edge

100mm deep friable imparted

topsof with 20% organic content,

light compaction only,

Tree pit to be excavated to min.

900 depth and backfilled witn

friable soll wilh max. 2% organic

content, light compaction only.

Slow release fertliser 10
manutacturers specifications

Backfill original subgrade

   

Rootball to sit on top of backfil

Cultivate subgrade
to 150mm depth

1:25@A1

 

 

LaNDGRAPHICS

(ANDEGAPE ARCHITECTS

 

Sa atten eso eiwre rang ray se
SS ren ake

 

Faw
Proposed Office Development
Davis Low Way, Peregian Beach

 

chon
Mr Erik Hipwood of MORGAN & BEIERS

 

Ate
‘Core Architects - John Roberson

 

ight compaction only.

ooh To
Operational Works Landscape Details

 

 

 

 

 

 

 

 

 

 

 

 

nos as
me 7]
ome | Me

Cae iho

sess teow
ome — = ane
uckHie] taca | coro c

 

 

 

 

Page 4

 

 

v2.07 | January OF

Genera! Description

Solidly consinucied from galvanised
stael, this bicycle stand holds muttipte
bioycles by their front wheels, Availadle
in single or double sided tunits and in
varying lengths,

Specification

BICYCLE STAND TYPES:
[A BSTS-01: Single sided bicycle stand
[3BSTO-01: Double sided bicycle stand

CONSTRUCTION:
Mild steel seciions, welded

FINISH:
HDG (standard)

MOUNTING OPTIONS:
(2 Surface fixing
(0 Sub-surfane fang wi baseplate

SIZE OPTIONS:
No. of Bikes Dim.A Dim. 5
co 2 250 360

Cc 3 1200 700
K 4 1650-1050

5 1900: 1400
“standard

Same options may incur extra cost

T68-ZEG10 idee | F 61-2 G18 1305
‘ecw, streetiumiture. com

 

bicycle station
BST 01

DT OF]

 

Bicycle Station 6i i
a icyde Staton
BSTS-01 Single BSTD-H Double
ora ose

   

40016 HOLES

 

surface | sub-surtsoe
basepine

 

MOUNTING AND INSTALLATION

 

SUB-SURFACE FIXED

WOTE:

Fastenert tw be proviced ano lnstales
Gy Perwares. es tre orstler rerpeartalty
teenie he mimoMy of tasteners,

© cra 2207

Fleiss 0380 Rot ty scing Mis Cranig uty fonru) 9: en aceptfg Ut GFA Gand Teh PPTL
Yor are (rotates Is aang for ty GTi Co which EFA iow Dataring, a8t yOu Stadt Me
LAGICY mise odes 12 cory Te drawing Oran apytgiale Gioantaes fone EFA you {or arepne
1m pad OF Grgagoe by piu Inbal 15 Lee Oro WCBAR pHKERey HPTD OF SP GeV pirct
cYiatcasand oy eacras

EFA (eberves the O72e 1 amend SpetSDON wtteat as fy PET Mer

 

 

Bicycle racks

Bike stands for 15 bikes are provided in the basement!"

Provide 2 bike racks for 4 bicycles each as shown on sheets LA01 to LA03.
Refer to specifications by the suppller, eg. Street Furniture Australla

(refer to Detail on this page.)

Fix firmly on proposed concrete slabs
(Exposed Aggregate finish as for seating areas.) |

wa

Climbing plants for bin area

 

Provide climbing structure as specified by the architect.
Plant 1 vigorous climber (Tecomanthe hillii) and lead plant
into the right direction / prune as required. 1
Plant 3 other native climbers (Pandorea jasminoides) én the
other side of the trellis as indicated on the plan. ‘

The trellis should be covered after approx. 2 years. 4

   

     
   

SUNSHINE COAS
REGIONAL COUNCIL

PLANS APPROVED

 

 

Plant No.5 to be confirmed pnor to
construction.

 

PLANTING DISTANCES
FROM SERVICES

 

min. DIST, | SERVICE
or.

 

2m, UNDERGROUND SERVICES
4, STREET LIGHTS
2m, STORMWATER PIT

 

 

 
      

ay
Im, Ss

ROM BACK OF KERB
LANDSCAPING SETBACK WHERE.
VEHICLES PARK PARALLEL TO
KERO

Om,

 

STREET TREES WUST BE ABLE TO ATTAIN A
CLEAR TRUNK HEIGHT OF 1.9m ON MATURITY,

 

LANDSCAPE CONTRACTOR TO VERIFY
LOCATION OF ALL SERVICES &
BOUNDARIES PRIOR TO CONSTRUCTION,

 

 

 

 

 

"AMENDMENTS:
a ory
® | gemsen | wove aa "a
o | yapse_ | asec comer, a
€ | irons | necro ancncarnss Owe ur
IHNES A ROLLER NN
FE AO DS FOUNTIN
ASOTONG BR AEA BAL MAEAS

 

 

 

 

b

° a a

LANDOGAPE ARGHITECTE

 

 

 

Proposed Offios Oovelopment
David Low Way, Pereguin Beach

 

om
Mr Erk Hipwood of MORGAN & SEIERS

 

eta
Core Architects - John Roberson

 

ae
‘Operavonal Works Landscape Detais

 

 

 

 

 

 

 

 

 

 

form vee |
! Gm
3 ivi . eat np
é oor orc8
tac | to en
Pe = haw
tokio} tact | oor | ic

 

 

 

Page 5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOLO WA, 1) am 709120

 

 

 

 

 

MAGI trae

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LP UNOTT? Tahce Tvokvanee ued eet KoreM TTF I Chote

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a Tip
r a a . 3 / somn INOTE : SYMBOLS ARE DRAWN IN THE CORRECT
it ' 7 2 | — @ Be sas a ISITION BUT ARE NOT SHOWN TO SCALE
P MP 20/03/07)
D Il eee fn ' gee
“TR |] oreseyt —S NP 20/14/01 ORES SDT. WING IS  AND IS NOT TO
§. 10.500 4 ee 10) new 1509 sewrr | | 3. IN ANY FORM AS A WHOLE OR
N Tee srua (1 ° Ss rea +95 GS) RISPECTION CONNECTION 10 IN PARA WITHOUT THE EXPRESS WRITTEN
|| Mwsrection i i 8730 en estarep or | | A TY OF PLUMBING DESIGN AND
SHAFT AT I & 56820 ' SCA. ATRORETY PTYLTD.
(CONNECTION —
- \ueaoys \ \
PDEA AL ome =.
: ny 1 [10.1207 [REL eanany ISSUE. Pars
——) ‘ 2 [14.03.08 | PRELIMINARY ISSUE. |
=X | \ \t pe fue peeumse a
. 1.06.08 |SEWER REVISED. SW BOUNOARY [HL |3Gt
ow . 4 - pyr DISCHARGE RISER DELETE
UPPER | SEWER NOTES REVISED NW BOUNDARY.
an\ \ \ a
: q [pa ADDED.
2 AAD
\
° ~
iG
——— *
| ee es a Proven
HT OVER.
Rw RISER: Mi
\ 3
, +t _—®
t ise Fine
_ —— 1 y
oo _ 4 These plans have been designed
. 5 \ uv to and comply with :
vo cm! L AS. 3800.2003 wes
STORMWATER PAT CY ) AHSCA
REFER CML =O
EER
oe
MORGAN & BEIERS ATF
ee
FREEHOLD
Bone
B82 —
“) |core ARCHITECTS
Tyan ean
|. PLUMBING DESIGN AND DRAFTING
hydraulic ond fire protection consultants
PRLO7} $437 7450 Fax 407) $437 735% malik retoy
2540 Tecrwoing ¢ Unive, {PO Bax 128 ) Warena. Old. 4575
‘ ‘ACH. V17159243 ABN, 62117155243 BSA Licence Ho. 1106752
Council Planning m2 —
ineeri ign Standards - Water &
Engineering Design Standart OFFICE DEVELOPMENT
247 DAVID LOW WAY
PEREGIAN BEACH
being Tite
HYDRAULIC SERVICES
GROUND FLOOR GROUND FLOOR
SANITARY SERVICES ALL SERVICES
‘NOTE:
WATER METERS ARE TO GE READR
ACCESSAGLE, LOCATED WH “COMJON
AREA’ AxD TO BE “ELSTER” BRAND
[oR ‘(COMPLETE WITH STRON
GROUND FLOOR INSET (TYPICAL =
WATER SERVICES ~ 070172 H- 03 TD B ';
NOT FOR CONSTRUCTION fe ceame®

Page 6

Fue€e.

 

 

 

for MORGAN & BEIERS ATF

PROPOSED OFFICE DEVELOPMENT
DAVID LOW WAY, PEREGIAN.

CONTRACT REF: M3087

 

 

 

LIST OF DRAWINGS

M3087/C01 TITLE SHEET AND LIST OF DRAWINGS
C02 SEDIMENT AND EROSION CONTROL PLAN, NOTES AND DETAILS
C03 CARPARK LAYOUT PLAN
C04 STANDARD DETAILS - GENERAL
COS STORMWATER LAYOUT PLAN
C06 STORMWATER LONGITUDINAL SECTIONS AND DETAILS

STANDARD DRAWINGS

 

R-0051
D-0010

NSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALIA

COMMERCIAL DRIVEWAY
ACCESS CHAMBER DETAILS DIA 1050 TO 1500

D-0014 ACCESS CHAMBER CAST IRON COVER AND FRAME
D-0030 EXCAVATION, BEDDING AND BACKFILLING OF PIPES

 

 

THE ABOVE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
ALL THE ASSOCIATED CONSULTANTS DRAWINGS.

 

 

 

Sunshine Coast Regional Council

Devejopment Permit Operational Works No: 2222, PF AL.
PPROVAL,

 

ind i circumstances vay the Ban & Speclicaione be departed
trom within the written approval of Council,

PLANS APPROVED

  

SHMAIEY ooo sscssseseeGsecene ounceasnonsstsunananonesonsseceransceceammacessrenssseeey

 

 

Oetegated Authorising Officer

se AON 7716 7 MS ACK 114 O57 HS
E CONSULTING CIM ond STRUCTURAL ENGINEERS

—_ PROJECT MANAGERS
FRASER COAST: SUNSHINE COAST: CORAL_GQAST:

ACK. O10 271 440 ACN. O07 675 165 ACN. 010 27) 40
34.00 Ucryboragp Ra, Lew 1/161 Sratore Re, 2 fasatvan Sueet,
PD. bos 259, (PA, Bor 200, 0, Boo 1141,
Fisloc, 0. 4655) Wsdloolare, 0. 4557) a, 0. 4670)
Phone (07) 41 203955 Prom (07) 4 40420 Prone (07) 41 526655
Fox (07) 41 245683 Fox (07) 4 MRSS For 407) 41 526683

Cell tgtieagonc 6nd Doe Enel rgacctagpendacton

I Pitcrn Borlow
M3087/C01 A xy 959

 

 

 

 

Page 7

|

 

SEDIMENT AND EROSION PLAN

Objective/target

 

Comply with alt statutory reguiations and
maintain them during construction and the
maintenance period. Comply with this erosion
and sediment controt plan, te control
erasian and sediment flows.

 

 

Management Strategy Site foreman to identify and check direction
of storm water land flows as shown on the
plan, Provide barriers and other measures

shown on the flan to prevent storm water

flows aver embankments and sediments into
catchpits.

 

Tasks/ Actions Erect sediment barriers at the tap of
embankments as shown on the drawing.
Strategically place check dams around gully

pits,

 

Site foreman to check erosion and sediment
flows at the base of embankments after

Performance Indicators

 

 

 

CONCRETE MASONRY BLOCKS

1980 SERIES) INLET WITH GRATE

 

 

 

 

 

 

 

 

CONCRETE MASONRY BLOCKS.

2mm WIRE NETTING {150 SERIES!

ALL SIDES

RUNOFF WATER
WITH SEOIMENT

OVERFLOW

 

       

 

NTS

 

 

 

 

required,

 

 

 

 

 

THESE DEVICES ARE DESIGNED TO MINIMISE EROSION AT A CONSTRUCTION
SITE AND CONSEQUENTLY DECREASE DOWNSTREAM SEDIMENT TRANSPORT,
THEY INCLUDE DIVERSION DRAINS, SLOPE DRAINS, ENERGY OISSIPATERS
AND LEVEL SPREADERS.

DIVERSION DRAINS MAY BE FORMED AS A CUT DRAIN, BANK OR BERM OR
A COMBINATION OF BOTH,

SLOPE DRAINS ARE GENERALLY STABILISEO QRAINS WHICH DISCHARGE
WATER FROM THE ENO OF A DIVERSION DRAIN DOWN AN EXPOQSEO SLOPE.

 

ENERGY DISSIPATERS (EG: HAY BALES} MAY BE NECESSARY AT THE
ENDS OF SLOPE ORAINS.

LEVEL SPREADERS ARE EXCAVATED OUTLETS CONSTRUCTED AT ZERO
GRADE AT THE END OF DIVERSION DRAINS TO CONVERT CONCENTRATED
FLOW TO SHEET FLOW.

ONTROL IE WIND C I D

TO ENSURE THAT ALL WORKS DO NOT DETRIMENTALLY AFFECT THE AMENITY OF
THE GENERAL NEIGHBOURHOOD AND THE ENVIRONMENT SURROUNDS THE FOLLOWING
MEASURES SHOULD BE ADOPTED:

PROVIDE A WATER TRUCK ON SITE FOR THE DURATION OF THE CONTRACT PERIOD.
ALL TOPSOILED AREAS TO BE TREATED BY SURFACE SPRAYING A MINIMUM OF
THREE (3) TIMES PER DAY AT MAXIMUM THREE {3} HOUR INTERVALS, UNTIL
SATISFACTORY GROUND COVER 1S ACHIEVED.

SEDIMENT MANAGEMENT DETAILS

 

    

rain. STEEL / TIMBER POST tong, TO BE SPACED

Check that check dams are working during AT 3.0m MAXIMUM crs. EXACT SPACING OF POSTS TO

rain periods. BE CONFIRMED ON SITE BY SUPERINTENDENT. POSTS
Frequency /Deadline Site foreman to monitor performance after 5 TO BE POSITIONED ON DOWNSTREAM SIDE OF FABRIC

fall.

every heavy downfa Z| "SILT LOK’ FILTER FABRIC (or approved equiv.)
Responsible Person/ Site foreman to be responsible for 3 COMPACTEO BACKFILL TO TRENCH
Organisation inspections * FLOW

WSL

Reporting/Re Site workers to advise foreman if they z wg POPS PREPS D SLOT

notice any barrier needing repair. Z| S

Z| LAY THE TOE-IN FLAP OF FABRIC IN THE

Corrective Ac Site foreman to report and order through o BOTTOM OF TRENCH AS SHOWN

supervisor, extra barrier or check dams os 3

 

DETAILS n4s

POST A END POCKET POST A

   

POST ol POST B END POCKET

JOINING SECTIONS FO
SILT FENCE ats

 

« OVERLAP POSTS AS SHOWN TO PREVENT FLOW THROUGH

+ ORIVE POSTS FIRMLY TOGETHER AND WIRE TIE AT TOP TO
PREVENT SEPARATION OF FENCE.

LINE OF POST: f

       

 

 

 

 

LEGEND |

 

 

Sa

 

 

 

 

 

 

 

   

 

FIELO INLET SEDIMENT TRAP,
EFER DETAIL.

 

 

 

 

 

 

 

SILT FENCE (SEE DETAIL)

4
FILTER TUBE SECIMENT
TRAP {SEE DETAILI

FIELD INLET SEDIMENT TRAP

NOTE: ALL SERVICES

TO BE LOCATED

ON SITE BY CONTRACTOR
PRIOR TO ANY CONSTRUCTION

| oy

SILT' FENCE FIXED IN ACCORDANCE
WITH MANUFACTURERS SPEC, TO
TEMPORARY SITE FENCING.

 

 

 

 

 

 

y ! i FIELD INLET SEOIMENT

FILTER TUBE SEOIMENT
TRAP, REFER DETAIL.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

 

 

TF Undr no circumstances may the Plan & Specifications be depar'
from within the written approval of Council.

DAVID LOW WAY

TEMPORARY CONSTRUCTION ENTRY/EXIT. REFER TO QETAIL. ALL
CONSTRUCTION VEHICLES TO USE THIS ENTRY. THE CONTRACTOR
SHALL CONTINUOUSLY MONITOR THE ROAO AOJACENT TO THE SITE
FOR ANY SOIL OR OTHER MATERIAL CARRIEO OFF THE SITE AND
IMMEQIATELY REMOVE SUCH MATERIAL.

LINE OF KERB
AND CHANNEL

           

7 a
—

a.

GEOTEXTILE FILTER TUBE —

EXTENT OF EARTHWORKS

 

Dis”
Ve ne Goas gional Couriell
—\= a] Davetapn sit Pernt Ofer al Work to: ZV. od Te
a i)

 

 

BERM {300mm

SS HEIGHT}

GEOTEXTILE FABRIC,
BIDUM U34 OR SIMILAR..

a

RUNOFF FROM PAD
DIRECTED TO SEDIMENT TRAP.

  

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LINE OF BELT. SAND FILLED
4. PROVIDE SILT FENCES AT THE TOE OF ALL FL BATTERS. 71 BELT LOOP TO BE TWISTED
2.PROVIDE CHECK DAMS AT TABLE DRAIN OUTLETS AND WHERE DIRECTED. AROUND TOP OF POST
3,PROVIDE TEMPORARY SILT TRAPS AS DIRECTED. REINFORCED BELT AT FILTER TUBE ENTR EDIMENT
%.THE ABOVE SILT MANAGEMENT MEASURES ARE TO BE MAINTAINED UNTIL TOP OF FABRIC ATS NTS
ACCEPTANCE ‘OFF MAINTENANCE’. “
5. THE ABOVE SILT MANAGEMENT MEASURES ARE DESIGNED IN ACCORDANCE WITH
‘SOL EROSION AND SEDIMENT CONTROL’ BY THE IEA AND MAY BE VARIEO BY THE
COUNCIL'S REPRESENTATIVE TO SUIT SITE CONDITIONS.
6.TURFING AND SEEOING ARE TO BE CARRIED OUT AS SOON AS PRACTICABLE. REFER FENCE TO POST
TO THE SPECIFICATION FOR SEED MIXES AND APPLICATION METHODS. CONNECTION x.1.8
NOTES: TITLE: PROJECT: pase, MARCH 2088 | scat ‘AS SHOWN
1 This & the propery ofthe ener, cat ocy ot | AN BARLOW GREGG WHA. | SEDIMENT & EROSION CONTROL] PROPOSED OFFICE ese Jn | arene
mel cp vereasd ly es) | 7 ih 04 a7 30 Acs 16 BY mS PLAN DEVELOPMENT at DAVID LOW [== « f ne
bieagert en 0) may ocd wet cin] || SS PDP sucine cous oie WAY, PEREGIAN BEACH ont ee HS
8 [ CROSSOVER AMENDED 2175/08 | 2. Fagred dasensions teke precedence evet scaled, C7 Sense amy CORAL Const. CORE RRCHITECTS for MORGAN & BEIERS ATF PROJECT-SUBSET-SHEET -REViSI
A} CSSUE FOR OPERATIONAL WORKS APPROVAL wives | 1, Verity cll dimensions of site. n StLk .
No. Amendment Octe [ByjNo Amendment Date |By Cirennegenae oe Ct Ph: (07) 5Gh4 4511 Fox: (07h Shs 6969 M3087 - C02 B

 

 

 

 

 

Page 8

 

 

 

 

 

 

 

 

 

 

                   

 

 

 

 

 

 

 

 

 

 

 

      

 

 

#o1 2 4 & 8 ow STANDARD NOTES:
Te) -
NOTE: - REFER TO ARCHITECTURAL DRAWINGS FOR 1. THESE ORAWINGS ARE TO BE READ IN CONJUCTION
SCALE 1100 AT AY BUILDING AND CARPARK UT DIME! WS WITH ARCHITECTURAL DRAWINGS.
SETOUT DIMENSIO) 2. ALL LEVELS SHOWN ARE PAVEMENT LEVEL. (U.N.0.)
3. CONTRACTOR IS RESPONSIBLE FOR ALL BUILDING
EA. AT B
Sen . AND CARPARK SETOUT.
cE - ase " RLS 4, ALL SURVEY INFORMATION SUPPLIED BY
= —= 3 =>") =| = = “BAY SURVEY CONSULTANTS PTY LTO’
A . . . ‘ ” . bh
e ’ 2 «
4 + . - % i" 5 ° .
. ‘ ot ae
© ‘ ‘6 ~ e ‘
e ‘ . < 4 “ Soe ~
8 ‘a . ‘ <T_ a < ~ gio
‘ ~ . «i RLWIO « . ~
RUA. 24)— 1 “ ‘ 4 / : ate ,
A + RLUL2Z 4 4 c Tw 65 <
+ INDICATES WHEEL STOPS. p \a 4 “ s .
L., REFER M30B7/CO% FOR DETAILS .. gas 4 a6 2 “ ‘
4 pENVsoy aS < - =
> UNE MARKING IN ACCORDANCE . oo a H
” a . WITH AS 2890.1 :
a 4 . . 2 °
+RUN.22 ‘ + #RLNIS . Ee
. asa epee SSS Sep eee . ns
« ed
» t ‘eH
, | [- ]
By? , > HATCHING INDICATES CONCRETE (
. PAVEMENT REFER STRUCTURAL °
ENGINEERING ORAWINGS: o .
a te aoe i BM003087/G-01-A TO G-06-A
HHg.23 TD {] all L |
ea (Oo, Fl [-]
= i 1 BUILDING 1 BUILDING 2
« ¥ 140 rT ) FFL 10.80
ey Yo oe LL
lsap.2 f EP inaicares rowt-up kere KERB.
= | “ REFER STRUCTURAL ENGINEERING “| Ae ,
(Qj . a ORAWINGS 6M003087/G-01-A TO
oy f he G-06-A NOTE:
PAVEMENT FINISHES AND SURFACE TREATMENT
RLS Es] I IN ACCORDANCE WITH ARCHITECTURAL ORAWINGS
~lh AND SPECIFICATIONS. aT
U
i

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EXISTING SEWER MANHOLE

NEW SEWER CONNECTION

EXISTING SEWER CONNECTION
TO BE TERMINATED

Sa D>

oe, ° .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

Ie
ia
ee « 44

&

aed

BUILDING 3
FFL 10.20

EXISTING TELECOMMUNICATION PIT
EXISTING TELECOMUNICA TION:

i SEWER MAIN

WARNING
\ THE LOCATION OF EXISTING TELSTRA,
ELECTRICITY, SEWERAGE & WATER ARE
\ ‘SHOWN SCHEMATICALLY ON THE DRAWINGS.
\ PRIOR TO AND DURING CONSTRUCTION
\ OBTAIN THE PRECISE LOCATION OF ALL
SERVICES (UNDERGROUND & GVERHEADI
FROM THE RELEVANT AUTHORITY
RESPONSIBLE FOR THE SEAVICE SHOWN.

 

\ \ / !
\ \ (fp EXISTING POWERLINE
— EXISTING SEWER MAIN

‘EXISTING STORMWATER
GULLY, PIT.

                    

NEW CONCRETE

  

 

 

      
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OS EXISTING PAVEMENT
<—” © EXISTING POWER oY = ar ee
necneg occu ces ralnee eset eb eee an seat geas XISTING Ser (DOWELLED CONTROL JOINT
— SEALED PAVEMENT ° EXISTING ELECTRICITY LINE
TO === EXISTING KERB & CHANNEL
seo errr So we EXISTING SEWERAGE MAIN
| oO m— EXISTING SEWERAGE MANHOLE
© SO RETAIN EXISTIN “ ‘ 1 eo: PIG: VEMEN Ls — —+ — EXISTING STORMWATER LINE
TXISTING Cone
: NE aaod Aushoraig Officer _ DAVID LOW WAY | oe CONLAETE PAYENLNTS ———— EXISTING TELSTRA LINE
$5@mm REIAFORCED CONCRETE EXISTING PIT
MESH, Tw Covi
CARPARK LAYOUT PLAN EEE ere Ten wa
1A00@ AI
NOTES; TITLE: PROJECT: cart MARCH 2008 [sae AS SHOWN
F | COUNCL_ANERDMENTS wre Le 4 This is the greperty af the engeesr, oxd aay net BARLOW GREGG weppeva_| CARPARK LAYOUT PLAN PROPOSED OFFICE ocseneD mm | arreowt
Eh Ae MT MAME A OF OA omen - ABN 77106 967 95) AGM 1H 057 383 DEVELOPMENT at DAVID LOW |= Cc | Petin Barbour
0] COUNT ANEXOHENTS W767es | vithout the express percission of ihe engneer. '
C]_ADDMONAL DETAR AODEO naval lefringenent & eny way may resutt wm Legal octon. G4 fs eee sas FRASR GUST WAY, PEREGIAN BEACH ‘OCRD, - = = i $36
Bl CARPARK LEVEL AMEXDMENTS: wares | © 7, Figured mensions teke precedetce over sicles. 0. Bes 1, CORAL COAST: ‘ASSOCIATED CONSUL TANTS PROJECT-SUBSET -SHEET-REVISION
A] ISSUE FOR OPERATIONAL WORKS APPROVAL Bara ln 3, Verity all a site. ee in i Fre Or 8 CORE ARCHITECTS for MORGAN & BEIERS ATF 3087 - C03 £ F
“ ~ Fon 2) eT Su i -
No. ‘Amendment Date [BylNo. ‘Amendment Date [By' teens Pecaminee | Phe (07) Sbbb 45t1 Fax: (07) Shad 6969

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 9

 

 

 

 

PAVEMENT DETAILS ‘
DRIVEWAY AND DRIVEWAY CROSSOVER

 

 

 

1. EARTHWORKS AND PAVEMENT CONSTRUCTION ARE TO BE CARRIEO OUT IN

 

PERVE VEL
ese ys HATCHING INDICATES CONCRETE PAVEMENT REFER STRUCTURAL ACCORDANCE WITH AS 3798 WITH GEOTECHNICAL SUPERVISION TO LE’

* ENGINEERING DRAWINGS BM003087/G-01-A TO G-06-A

. THE CONTRACTOR SHALL PROVIDE CERTIFICATION THAT THE WORK AND ——— 4+ —_
GEQTECHNICAL SUPERVISION COMPLIES WITH AS 3798,

aa
OB 3 ar
PAVEMENT DEPTHS MAY BE VARIED BY THE SUPERINTENDENT 3, THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION REPORT.
FOLLOWING SUBGRADE TESTING,

 

 

 

 

 

 

 

 

 

 

 

 

 

4. SITE PREPARATION: 2.No.25 DIAMETER SPIKING HOLES (TO
COMPACTION STANDARDS SUIT SPIKES 20 DIAMETRE x 300
a. STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE MINIMUN, LENGTH}
ROADWORKS TO 300mm BELOW SUBGRADE = 98% STANDARD ALL VEGETABLE MATTER TO THE BASE OF THE SUB GRADE.
ROADWORKS WITHIN 300mm OF SUBGRADE 110% STANDARD = r 7 Ce
LOT Fit 98% STANDARD b. FURTHER EXCAVATE IF REQUIRED TO BOX OUT TO MINIMUM
SUB BASE GRAVEL 100% STANDARD PAVEMENT THICKNESS. REMOVE AND RECOMPACT FILL AS PER ut] i Los
BASE GRAVEL 100% STANDARD GEOTECHNICAL REPORT NOTE ON THIS DRAWING.
CONCRETE TYPES COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98% WHEELSTOP DETAIL
STANDARD COMPACTION AS OEFINED IN AS 1289 IN THE TOP 200. NOT TO SCALE
STORMWATER STRUCTURES N32 HUMES TYPICAL WHEELSTOP OR
FOOTPATHS N25 d. EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT APPROVED SIMILAR.
DRIVEWAY PAVEMENT INCLUDING SPOTS OR HEAVING SUBGRADE AREAS. STRUCTURAL FILL SHALL BE
ROLL UP KERB N32 APPROVED GRANULAR FILL {100mm MAXIMUM PARTICLE SIZE,
MINIMUM SOAKEO CBR = 15 PLACED IN LAYERS NOT EXCEEDING
NOTES 20dmm AND COMPACTED TO ACHIEVE NOT LESS THAN 98 PERCENT
MAXIMUM RELATIVE ORY DENSITY {STANDARD}, OR 70 PERCENT DRY
PROVIDE SUBSOIL DRAINS UNDER ALL KERB AND CHANNEL AND DENSITY INDEX IN ACCORDANCE WITH AS 1289. SITE FILLING
e OTHER KERBS AND PAVEMENT EDGING. MATERIAL AND COMPACTION UNDER THE PAVING AND BUILDING
. SHALL BE AS ABOVE.
PROVIDE 100@ HEAVY QUTY CONDUITS 200mm ANO EXTEND
. UNDER CONCRETE ORIVEWAYS WHERE CONDUIT LOCATIONS
. REQUIRED.

NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT
OF WORK WITHIN EXISTING ROAD RESERVES.

THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL
EXISTING SERVICES WITHIN THE SITE PRIOR TO COMMENCING
WORK, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO EXISTING SERVICES WHETHER SHOWN ON THE
DRAWINGS OR NOT,

 

ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL
AUTHORITY'S SPECIFICATIONS AND REQUIREMENTS.

 

 

 

 

Sunshine Coast Regional Council
@ 2000, 0B3/

Development Permit Gperational Works No: --

 

RECOMMENDE PROVAL

    

Under no circumstances may the Plan & Specitications be departed
from within the written approvat of Council,

PLANS APPROVED .

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Oelegated Authorising Officer
a
z
NOTES: TITLE: PROJECTI gate MARCH 20! SAUL AS SHOWN
1 = BARLOW GREGG .wewa_| STANDARD DETAILS - GENERAL | PROPOSED OFFICE oesceen aM | -Penoven
L This 15 the peeperty of the engineer, cad moy cot ,
be et, ead iy et | 7 erent DEVELOPMENT at DAVID LOW [= | Ole Oe
i press penaission of . , : ; cena 7
Cf CROSSOVER DETAR REMOVED Tara | regio! i on vey wey est tage cote | | 1S a ieee mas WAY, PEREGIAN BEACH PROJECT-SUBSET-SHEET-REVISION
@[ CETANS aNENOED Brive | 2, Figored dmensions teke precedence ever scaled, tad eM ism Camas coasts {ESSOCIATED CONSIA TANTS for MORGAN & BEIERS ATF
A] SUE FOR OPERATIONAL WORKS APPROVAL wa7oa] & 3. Venty oll fons on site, a serrauany Chast: CORE ARCHITECTS + 3087 - (04 C-
No. Amendment Date |ByjNo. Amendment Octe [By meer Pewee (021 344 72 Ph: {97} S&G6 4511 Fax: (07) S446 4969

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 10

 

 

\

i

 

 

 

PROPOSED CATCHMENTS
Qi00 FLOW PATH

 

 

 

+ RL,

 

: ia

HEEaau

600 x 680
FOX BGTENO.

ve

4 RLN.25

 

            

660 x 600
. gFOX BPTSOR,

  

i

=—=,| = =—)

 

. ie RLW30
5 ‘ “ *
 RLY22 . ° a

¢

4
ye.

pu

EXISTING SEWER CONNECTION

TO BE TERMINATED

 

“

 

RLNL2S

iit Permit Operational Works No: ...-"

 

‘Sunshine Coast Regi iat souncil

OEY,

 

a qs

 

 

 

 

 

 

 

 

 

 

=
~~

HATCHING INDICATES CONCRETE
PAVEMENT REFER STRUCTURAL
ENGINEERING DRAWINGS
BM003087/G-01-A TO G-06-A

\
BUILDING
11.60

 

nde} no circu m
within the written) app;

PLANS Al

 

 

 

 

 

 

 

 

 

 

 

      

 

BUILDING)
are RADON

 

 

 

 

 

 

 

 

NOTE:

 

REFER TO STRUCTURAL ENGINEERS ORAWINGS
FOR BASEMENT DRAINAGE LAYOUT.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

600

60¢ FELO

 

 

 

  

 

600 x 600 FIELO INLET.
1 t 1

 

  

 

 

 

 

 

we

BUILDING 3 '
FFL 10.28

450 x 450 FIELO INLET.

[* x 450 FIELD INLET.

+ NEW SEWER CONNECTION

w

 

 

!
EXISTING SEWER MANHOLE

50d 80 2
er *

i —-—

LEGEND
Ce]
Ea

4

 

NEW CONCRETE
EXISTING PAVEMENT

STORMWATER PIPE

GRATEO INLET PIT
DOWELLED CONTROL JOINT
EXISTING ELECTRICITY LINE
EXISTING KERB & CHANNEL
EXISTING SEWERAGE MAIN
EXISTING SEWERAGE MANHOLE
EXISTING STORMWATER LINE
EXISTING TELSTRA LINE
EXISTING PIT

EXISTING WATER MAIN

 

 

e

\
\

450 x 450
FEILO INLET.

3

'

/

yf
Ly

/
gy

WARNING
THE LOCATION OF EXISTING TELSTRA,
ELECTRKITY, SEWERAGE & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS
PRIOR TO AND DURING CONSTRUCTION

 

OBTAW THE PRECISE LOCATION OF ALL
SERVICES (UNDERGROURD & OVERHEAD?
FROM THE RELEVANT AUTHORITY
RESPONSIBLE FOR THE SERVICE SHOWN.

 

2

vr EXISTING POWERLINE
\ fH EXISTING SEWER MAIN
‘y

:
K

Re
25g

™

re @

x

ie
CONNECT NEW STORMWATER
DRAINAGE INTO EXISTING GULLY PIT.

MAINTAIN EXISTING STORMWATER

DRAINAGE D/S._

      
         

WAT!

 

CONNECT NEW STORMWATER
DRAINAGE (NTO EXISTING MANHOLE.
MAINTAIN EXISTING STORMWATER
DRAINAGE D/S.

SCHEDULE

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 

 

 

EXISTING
| SEALED PAVEMENT fT . PIT No. PIPED Pit TYPE
°
Ss 2 i vane ca | faa
v|. aA Wang ty | FOX.ePreN
Ce Ce -e- ia vane at
Se * CONSTRUCT SORMERCIN, ACCESS WY ACCORDANCE, tee ee eee. .. DAVID LOW WAY. . oe ma
LS. 1. ORG. Co we 6421 | BOS epve
STORMWATER LAYOUT PLAN 0 isi | abe St
1AQ0@A1 me
NOTES: TITLE: PROJECT: pare MARCH 2088 | xue AS SHOWN
FT COWL APENDHENTS pare tH L This és the praperty ef Ibe engiwer, cad ey ot aw BARLOW GREGG MHRA, STORMWATER LAYOUT PLAN | PROPOSED OFFICE OLsKNED aM | sppmoven
Cf COUNCE AMERDMEN sd, copied, w reproduced well CONSIATING ERS
i ooee an AE ae Severs petissan om_ B ABN 77114 957 33 ACH TH 7 3S DEVELOPMENT at DAVID LOW |= CC) Pin Barlow
CC] ADDTIOWAL DETAa ADDED verses | egensat & cay Cy aay reset ia zgeL acten, G demrhreien WAY, .PEREGIAN BEACH Secu arta #4930
B] CARPARK AMENOMENTS Brivis | 1, Fagured Gavensions Icke precedence over scoled. CORAL COAST: ASSOCIATED CONSULTANTS PROJECT -SUBSET-SHEET-REVISION
AL ISSUE FOR OPERATIONAL WORKS APPROVAL Bra7oe| 1 verity eb ‘a sie (aes? CORE ARCHITECTS for MORGAN & BEIERS ATF
. Verity 7
Ne Amendment Dote_|By}No. Amendment Date [By hewneryae Reraniiaay | Phy (07) 5664 4511 Fax: (07) Stbb 4959 M3087 - COS F

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 11

 

 

TORI

STORMWATER PIPES SHALL BE AS DETAILEO ON PROFILES
THE FOLLOWING PIPE TYPES MAY BE USED IN ACCORDANCE WITH COUNCIL'S

 

 

fan ras
fox err
2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

  

 

 

 

 

   

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

z 5 3 ao:
: q 5 z 22
APPROVAL. CLASS SIZES NOTEO ARE A MINIMUM ONLY AND SHALL BE * : -
DETERMINED BY COVER REQUIREMENTS FROM DESIGN. ) © SB
PVC PIPES MINIMUM CLASS 6 GREATER THAN 600mm COVER 1 4 1 1
PVC PIPES MINIMUM CLASS 9 LESS THAN 609mm COVER 1}
RCP PIPES RRJ CLASS 2 EXISTING 150% SEWER
FRC PIPES 'ADCOL’ JOINT CLASS 2 EXISTING STORMWATER LIN!
POLYPROPYLENE RIBSTRUCT PIPES BRS ee =o 8 ae 6 a an ==
PIPES TO BE LAID IN ACCORDANCE WITH THE MANUFACTURERS.
SPECIFICATIONS AND AS 3500.
2, MINIMUM GRADE QF 1 IN 100 FOR ALL STORMWATER PIPES. UNO oo] EXISTING STORMWATER
| -~— EXISTING 150% SEWER LINE
3. ALL STEEL GRATES AND FRAMES TO BE HOT DIPPED GALVANISEO AND SHALL BE
CYCLE PROOF IN ACCORDANCE WITH AS 3996.
4. PIT SCHEDULE eh Cle
"WEBFORGE’ OR APPROVED EQUIV, R
SIZE IN TRAFFICABLE AREAS OTHER .
300x300 MSG33C MSG33A
450x450 MSG44C MSG&4A DIAM. {No/mm/CLASS} W2I5@ C12 172150 12 173008 CF Tiong CL? WIND CL? DIAM. Wo/an/TASS) 171508 PVE ial PVC VS =
600x600 MSG66C HSG66A GRADE (PERCENT! ike ine Titi ne Tas GRADE (PERCENT) Ta ; ;
900x600 MSGe9C MSGS9A PIPE FLOW/CAPIcusml 0.010 70.066 0.41870.079 QNS6/0 IS? 0.05670.097 0.05670.12 PIPE FLOW/CAPIcusm} 0.0170.017 0.01374.022 6.01870.068
i I Bl M008 360d REAI LENGTH (m) 26,050 5.200
GRATED DRAINS REACH LENGTH im 16.240 17.400 7.400 | CH | K + =
300 WIDE = MTG30C HYD. GRADELINE tm) & Sls g|s 28 gs 8 HYD. GRADELINE im) | 5 | & 2/5 5
gh = S| 2 s|= s\e #|2 = - = a ate >
5, #7 INDICATES FINISHED SURFACE LEVEL. DEPTH TO INVERT tn) |Z s\< s|8 «lg 2]8 3 DEPTH TO INVERT fa} | = 8/8 als 5
6 THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING WORK. 3 als 4le ¥4)8 Sle BIE Zz /2 88 ard
INVERT LEVEL(m} 3 ge a) 5 gle B15 alk (NVERT LEVEL (m) & 3/3 5) 2 3/%
7 THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES AND LOCATE ALL - * = a 3s = 8 z g 3
SERVICES BEFORE COMMENCING WORK, SURFACE LEVEL (n) | & e & 3 : SURFACE LEVEL (mb | = = =
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED TO = ; - e * s CHAINAGE s gs z 5
SERVICES BY THE WORKS IRRESPECTIVE OF WHETHER THE SERVICES ARE SHOWN CHAINAGE = ® g = & g = 5 a 2
ON THE DRAWINGS OR NOT. 3 of a a s &
LINE 1 LINE 2
ORK
STORMWATER LONGITUDINAL SECTION «:"
BEDDING SCHEDULE: mn x 600mm SG, GRATE
NOMNAL MiNMuM BEDDING MINIMUM ‘GRAVEL BEDDING GRAVEL BEODING MATERIAL SHALL HAVE 4 [ WEBFORGE “HSGOEB' or Equisst
CEE WIDTH, A CEPTH, B SPACING BETWEEN MAXIMUM SIZE NOT EXCEEDING 9.5mm,
SAND BEDDING: SANO BEDOWG NATERIAL MAY BE NATURAL SAND, ss .
Dien 10.5 xO ain) | MULTPLE CULVERTS | | ANUFACTURED AND, OR A MOXTURE OF NATURAL AND MANUFACTURED ouncil
300 0 SANDS COMPLYING WITH AS 2758,1 FOR FINE AGGREGATE. Sunshine Coast Regional Cc
OS 133, GOURSE AGGREGATE BEDONG MAY BE USED FOR ALL DEPTHS IN DRY . >
a mt uo a GR DEWATERED TRENCHES. PORTED BEDDING NATERIAL SHALL ional Works No: L008 COBY
COMPLY WITH AS 2758.1 FOR tomm NOMINAL SIZE COURSE AGGREGATE. 5U72 MESH (CENTRAL i . oo weenee se
$00 300 205, ENCLOSE THE BEOOING GEOTEXTRE SPECIFIEO WHERE FLEXIBLE 0 Development Permit Operational 01
a a oe PIPES ARE LAD IN SANDY TRENCH MATERIAL OR WHERE SAND (
BACKFILL IS USED, WHERE NO GEQTEXTILE HOS BEEN SPECIFIED THE
N50 458 360 GEOTEXTILE TO BE USED SHALL BE AS APPROVED BY THE RECOMMENDE! FOR APPROVAL
ue ae “te eee SUPERITENOENT.
CONCRET! IDDING/CRAOLE: MAY BE USEO WHERE THE PPE
ot a 505. REQUIRES PROTECTION FROM HIGHER LOAQINGS. PIPE UNDERLAY SHALL SEC T 1ON 4 Leet ee ete eeenepanee
BE N20 CONC. MECHANICALLY VIBRATED TO ENSURE THAT ALL CAVITIES seaosegenFosecesee
a st AROUND AND UNOER THE PIPE ARE COMPLETELY FILLED WiTH CONCRETE, Under no circumstances may the Plan & Specifications be departe
70 St {rom within the written approval of Council.
2 600 0
2700 600 E FOUNDATION BEDOIWG/HAUNCH MATERIAL
za i : PLANS APPROVED
fea arr MATERIAL,
NOTES:
| 1, SIDE SUPPORT COMPACTION OF WATURAL GROUND OR
CHEANKMENT MAUHUH 50%. STANDARD RELETIVE
ALTERNATE oe Sry ORY DENSITY FOR MIN, 2.9 Oho, EACH SIDE OF
TRENCH WALL AND 1@ A MIN. DEPTH OF 0.7 Dra. AN
7. WHERE CULVERTS ARE UNDER ROAD PAVEMENT, PL.
BACKFILL SHALL BE APPROVED ROAD BASE MATERIAL
PIPE INSTALLATION DETAILS FIELD INLET PIT DETAILS»:
NOTES: TITLE: PROJECT: ate, MARCH 2086 | swe. AS SHOWN
vias be popes a te egen, oc mot | BBN, BARLOW GREGG SEDEWA_| STORMWATER LONGITUDINAL — | PROPOSED OFFICE a am_ | wren
be used, copieg, af remrediced wily, pert 78 SECTIONS AND DETAILS DEVELOPMENT at DAVID LOW |= | Petr Barkow
aBe (S83 ACH TH S57 HS
DB] COUNT AXENMDPENTS: weve [aN snthoet the express parmcssion of the mgneer. Bs SUNSHINE COAST, FRASER CAST: WAY. P Ceuen pen, #4930
T]_COUNCL_APERORENTS WAG | itinenant ony oy wey ces legal ecto] | 1S wlan ret. Pa HI . PEREGIAN BEACH PROJECT -SUBSET -SHEET REVISION
©] COURCL AMERDPERTS: w7e/ea | 1. Figured Gesnsions teke precedence over sceted. C7 neta eet opal coast ASSOCIATED Costa TanTE for MORGAN & BEIERS ATF
| ISSUE_FOR OPERATIONAL WORKS APPROVAL Braves | 4. Verify all damensians on site, { ee vecisumat (0151, CORE ARCHITECTS M3087 - C06 D
No. Amendment Octe |BylNo. Amendment Oate [By' casetmatoegegpaet Pome BD thd 6477 Ph: {07} 5666 4511 Fox: (07) 5446 4969

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 12

 

 

 

 

 

 

 

              
          

 

ARMERSELE GROUNOWATER PUMPS,

THE DUAL GROUNDWATER PUMPS
SHALL EACH BE CAPABLE OF
DELIVERING 10L/s (MAXIMUM
GROUNDWATER (NFLOW AS PER
GOLDER AND ASSOCATES ADVICE AT
10m

FALL

 

 

 

 

 

 

FALL

 

 

     

FOX apreoe Gross
POLLUTANT TRAP.

 

PIPE DIAMETER TO SUIT PUMP
REQUIREMENTS 3

Ty ae co ee

 

FALL

 

‘
|
i
i
|
w
8
8
==

V hy
REFER CIVIL ORAWING =
M3007/C05 FOR j
STORMWATER PIT OETAILS. {
PIT TO INCORPORATE
NON-RETURN VALVE TO
ENSURE STORMWATER

DOES NOT FLOW BACK TO
PUMP.

 

 

 

 

 

 

 

  

 

   

 

 

 

 

 

 

 

 

fate FALL | | 500 | | FA, FAL 90 | VeAuL
t ot ot ; tt Net
| Lpesares SPGON ona | | | | { |
e FALL DIRECTIONS. , 1 ‘ : . “| \
| i | ij Sunshine Fogst Regional Council
: : Dt Ct : 3. O2 Sf @
Lo ee ee fe td bd Development Permit Opera Ws NE 2008 do
| i | | | RECOMMENDED FOR APPROVA
SUB-SURFACE GROUNDWATER DRAI
REFER TO ARCHITECTURAL SPECIFICATION FOR ALL SET OUT OIMENS Ex SUPIT EAT SMATRLETE ESIGN: €Wuncil.
LEGEND
ea “saves. men _ ei ea”
AOU Re merges i CAEL nc VOL a i 8
@ - FOX BPT680 GROSS POLLUTANT TRAP
SECTION ‘ X10 ot At 500 - SPOON DRAIN OUTLET

 

 

 

 

 

 

' FOR CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

eB copyncnt ap ne POUETY OF Ha OaAACG VOR PTY LIE. TITLE: proect: PROPOSED oat: JANUARY 08] sue AS SHOWN] sx AT
pee we near Semen BARLOWGREGG ::: BASEMENT SLAB RELIEF OFFICE DEVELOPMENT at cesene WBC | ern

+ | areata ws eats nanos | VP TA. DRAINAGE SYSTEM LAYOUT =| 247 DAVID LOW WAY oem a5 Pa Poco

«| deg mmete tien sao fon consimecion | rani [isa . . Cre NOw|rsze. FE

: fae “ane o Consulting Engineers TassusTta C@aA TINTS MORGAN BEACH fo ae PROECT SHEET NUMBER REVISION
fe a cr ACH: TH Me 957 363 CORE ARCHITECTURE & BEIERS A

- o AMENOMENT bare [ey www bartowgreggvdm.com.u Phe (07) Shbh 4511 Fox: 107) SUGt £969 MULRANY PROPERTY TRUST 2 BM003087 - 00-03-F

Q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 13

 

 

FS to

    
     

 

190
SS COVER
T 16 IN TOP

COURSE ONLY}

 

                     

 

 

 

id
‘ [email protected] CONCRETE N16 WITH M16 THREADED INSERTS ; VERTICAL:
‘ST p MEME!
CAST WALL PANEL Oe oy wate SI 200 N16 GALV. DOWELS M12 @ 400crs. TARO ATeCT: ree
= ey © A00crs. 150 HORIZONTAL: ARCHITECTS: SPECS. \
RAMP REINFORCEMENT 4NI6 CENTRAL | EMBED, 600 LAP. FREE DRAINING :

   

 

GRANULAR BACKFILL. 1
L-CLEAN-OUT BLOCKS. i

1 AG LINE OH CONTINUOUS
FILTER SOCK TO DISCHARGE {
CLEAR OF STRUCTURE. i

“X" [email protected] REINFORCEMENT AS DETAILED:

 

 

 

 

 

 

 

 

 

2, 2 LavEns SL82 MESH 600min, LAP.
0mm TOP £
is N16 @ 00ers. 190
i BOTTOM COVERS
= t—
p——DRAINAGE 2 SHEET PILING r—NI2 @ L0crs. 600 SS COVER
GE 2 SEALING BY OTHERS —~| LAP WITH MESH. ;

 

AS DETAILED

 

were

 

 

 

 

300
425 100

 

HEIGHT - “H- [BASE WIDTH - “B"[BASE DEPTH - “O~[ “Xx” BARS

@ $00 LAP. 500_LAP }+-—STRIP FOOTING SFI AS DETAILED 400 1000 00 Wie

 

 

 

 

 

 

 

1600 1100 $00 N16
1800 1300 600 NI
2000 3400 600 N20

 

 

 

VERTICAL

NIZ @ &00crs.
HORIZONTAL -

 

      

 

O ta ata RETAINING WALL RW2 wiz @ socers.
\eay

 

WATERPROOF MEMBRANE
TO ARCHITECTS SPECS.

 

 

 

450 LAP.

FREE ORAINING
GRANULAR BACKFILL.

ADDIT. N12 @ SO0crs,
HORIZONTAL TO EXTENT
OF 300 SERIES BLOCK.

CLEAN-OUT BLOCKS.
AG UNE @ CONTINUOUS

WIS GALV. DOWELS
@ 400crs. 50 K BARS

EMBED, 600 LAP. J.
—— a

SL72 MESH, 46: FILTER SOCK TO OISCHARGE

Sunshine Coast Regional Council ' FSA SAN SAYNTOP COVER: CLEAR OF STRUCTURE.
WE] | [nn a X STARTER BARS
* im Cf .

| ——~—[email protected] @ 200crs. 400
LAP WITH MESH.

 

 

 

1000.
300 SERIES BLOCK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Development Permit Operational Works No: ZOE

@. o|

Under no circumstances may the Pian & Specifications be departed
from within the written approval of Council.

PLANS APPROVED :
Dates ee PLE LOOSE. oc ccccccccsssscsseenssssssessenn

 

 

 

S5_COVER

 

 

 

[-w .

t 8 :
N. ' -
£ TEIGT > oH" BASE WDTH - “B"]MEEL WIDTH - “W"JSASE DEPTH — -0-[ 300 SERIES BLOCK | “x” BARS | “K" BARS |

‘ 2200 500 450 ~ 100 800 Wis @ 400| Ni © 400]

‘ 2400 1700 450 700 800 wis @ SODjNS @ coo];

: 2600 3700 450 800 3009 M20 @ 600|/N20 @ 400)

‘ 2800 2100 600 7800 1000 wis @ 200/ Nis © 200

3000 2300 600 900 1000 Wis @ 200[ NS © 200

 

 

 

 

 

 

i ee mm,
eae ot

 

 

 

 

 

 

 

 

 

 

 

 

 

_— s

Delegated Authorising Officer

 

 

RETAINING WALL RW1 DETAIL ua «

a

 

 

 

 

 

 

 

 

 

 

 

4
| ' FOR CONSTRUCTION
OG. car aes sae en Tm, pox. PROPOSED ma DARIAN ca at AS SHON] A
cms” | BARLOWGREGG 22 2="<.-|easenent rootinc OFTALS | oFFice DEVELOPMENT at wes 3
Sense eee ees, VP PA. factopooyrecne (SHEET 2 247 DAVID LOW WAY = rt Foiled
COMSEQUEMES ARGO: PRM Tat US OF Tet DLAWEE POR OEY Teas CS . Freser Cons! a ‘OETEtD. Iw | eFzn:
[[ Ere Tee | HEE IS See SAR TR Fa SN Consulting Engineers P25 eee POE eS AT aE ST aR
ul TOR. Dae [ae FS a Ne Taare eSoe ACR: TH Te 957 363 Cor! Geos! CORE ARCHITECTURE
be APERINENT oaTe_[ey fn] anenDint Gare [ov] Se ces ee Sema ee wee 7 raress CORE ARCHITECTURE su | MULRANY PROPERTY TRusT 2) BM003087 - B-04-C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

{

 

i

 

Page 14

 

 

 

Existing sewer connection to be terminated.
New newer conection fom existing marhote

  

 

   

   

 

 

6 Ws
2 Existing Sewer manhoie tobe

‘aibed fo RL 11,30 es per chi)
eng details

(00 x 100.0

 

 

 

z
&
s

|Provide Signage for parking|at grade
“One Hour Parking Only’

 

 

 

 

 

------8---5--_

13.635

 

Refer Civil eng. drawings.

200,

6

--..___E]

Line of Basement Carpark below

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Or “Urt

A

TOW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

[

Laresapiry to Bp G1 bec wo,
cniadisiypo een

 

 

 

 

 

 

 

       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 existing overhead powerines
_Joserground tom bis pot.

 

 

EXISTING.

 

 

 

 

 

pin Gasast F

 

 

prt Permit Operation Wart

Circumstances may the Plan & Specitications be departed
from within the written approval of Council.

PLANS APPROVED
Date: cee OLE LOE

 

Sagat. eT ccssssssscecssserseesesenstussunestentanssonssscoce
Delegated Authorising Officer

 

 

DAVID LOW WAY

FLOOR PLAN LEGEND

8

150 dia down pipe es specited wih stand off

SHS in wal ine to stuck ong detatb.
‘Stone facing tb Bick work wal 23 specified.
Tact ground sutiace indiczba as scheduled To

{J Hee Cone. Path to Landscape architects detal 2 ecstng Over bead powertines
nr Eating Ove bead powertnes:
i

2

Biectical Hub: Location od fl pwitches, Security
key pat, Rises for Power supply @ x 50mm Dia core
‘bdea} and Distibuen Board ts Ela. eng deta.

‘Cacia Hofow secton framing «9 per membrane root
@) Sem Water mm bate

A Exising Fire Hytrant
PPO) Existing power pote

[TP] cae ntecapt

Reif. cone. cotamn. wih ings down pipe to

5

Fhing Paiot for mernbcane mof es per Mant spec. ee ooh Dans
jes lndacates sippy of Metered nnd Remote
Rezt.conc. sotarnn. tract eng deta. bane

Double: bent te | detake
‘Trin Sate’ mesh sexeening te nomad whdows 0s Seta ome

Handead as per detad, PWD compiant

‘Water Moers in cabinet Hy ong dstaas.
Trafic Mirra a: spectied. To Vac org. Catt. vs eng

{Diaganaly) Finished f bor Sartace Spol tevel.
‘Finished Floor Level ( Max. where ffs 672 appccb le)

NOTE a services plotted am Survey's

 

EQRSRaY

Bectical Ditbertos board
‘Drainage octet as per sttuctand Hyd. eng. detads.

 

Phinting Hab: zone fer mnie: bbe pewiced.

150 dia dome pipe a3 epoctod wits stand off Celd wats pipe, ESmen Wasia pipe and Ramote water 7 > Eating Tea ine

ae sag “2g
CORE

Exiting tues bbe retained.

 

SESSSSS25253 23] |

  

    

                      
     

‘Cempark extauat intake with
all weather louvre to Mech eng datas

Gator natural ground to 350 below
US of slab nbove,

i, “Street guy, exact oan

tobacontemed on sit,

(©) CORE

werncoruarcicoma miltPeorearchcomau.

Wedbene ml 7811 eed ar 079892 2667
Snanavine Cane te! G7 HANADTT fax OP 5446 1969
Heerey May tet PAINS Gx G7 AIRE TISS
Whetnwetips oe! OF ENS 1a] bas 07 4948 143

CORE Ancryctre yd
AEN P0088 721.254 OA Cont 2850

PROPOSED OFFICE DEVELOPMENT
@

247 DAVID LOW WAY

i

MORGAN ANDBEIERS ATF

 

‘GROUND FLOOR PLAN

 

2BNT2008 14008 1:200@ Aa

 

BvG 5H
aR O71314_Pereglen Commercialpp

Te os
Or1314 = W42.02 [9]

 

Page 15

 

 

 

      

          

   

  

eee %
1 ag naman oan ae
eran ee
GENERAL NOTES: . LORE RM ae es 8
(Read ln Conjunction With All Drawings) OT TELE BAUER os
Bis scyggios mr ws atrmce {
BLOT ox ta mitnds nal dmpie LCULATIONS:
Riese Rare arise, RP DESCRIPTION AREA CALCULATIONS:
genstmucrion
a an |carroly with the jrementa of .
Bepaseaaay Sua and 70 Los: 1and 20n RP 903222 and SITE AREA; 2021?
EFERENGE DOCU) LOT 26 on P3156
FE oe A on oun parst; —Weyoa BUILDING 1:
sccesa atactic wontons COUNTY: — March GROUND FLOOR, 121.662
Seacrest ooh 4 FIRST FLOOR: 200.46m'
beats seman ara { DEVELOPMENT SUMMARY TOTAL BUILOING 1 3e24em?

 
  

ct

I vecatore
CAR PARKING

   
 

    

fon AS 7000.1 ac

fa TS EY Eon eal el ead

crea ft Commercial Office Development - Class §
US TLATION i | Basement Car park + Class 7a
Sothanee anion srmean tee, :

Bi eit mauemegty up be boo persia

Enh Conmuthg Sauces Py Te Paser ag 8

FLOOR LeveL,

pei suc arf oe
Cees a ead ah Re
Goncrerecaumis

eoney ohget tal be midreed crerata

BUILDING 2:
GROUND FLOOR: 185.38m?
FIRST FLOOR: 200.46m?

TOTAL BUILDING 2 995.82?
BUILDING 3;

GROUND FLOOR: 161.51m*
FIRST FLOOR: 186.85m?

TOTAL BUILDING 3: 348.87?

 

Baier cokes clone CASE,

Soren de eects

Ae ee a neuen
Fee et oneal te erat
Re Res tna th tees ete
Gaolechviical nh angrier ty
Seen oe ae
Ent sine acuetliency ycirme

SROADERCC TG
TECREERa ALmS ,
oI CONTROL OTS oe un
ete pete anal acres
PRESS pepe poe a ro
roars

Jn ght neu ion ones

RAReei eee

fale Bitch Ss pectin’

 

 
     
 

Cais anutien otaM
wath aphsspraie titra. Ros Hes 2, deawinge ;
(annscapea mre ee eeel_.
\euamenty es ro ENSTING BOWLS TT ms wo wn
aE pageaied gut accordance wth wptcabia loca uot CLUB
ER rare condi Natasa a BER ee ty ‘09 [ LoT at on
MCH 3786

         

LEONA: yIXTLATION
See Seals near te pte

SOM RSE ele PATSes TN gry
ne seeora feaur cole spt bap talen © atone
SPE ee Ratna Aas RH ordre

 

 

senrentnreon
sensi

sytem

FE Seren
fea samy

shall by in accordance with the BCA,
earecey ee davon

GUE oPiw BOK AE HB POT a Bert ers rawr PROPOSED FUTURE

SIRMWATER, COMMERCIAL DEVELOPMENT
hnacsadanoe oth Hpaadce Reon Saegs ee
aa Lor 22
eset tinraae momen re PRsts
sae pat eaten i remem, oa ae

Seeagusye amaight uc, cordance wiht Bin Store,

Ibe pha oy or waprowed contactor

 

 

  

MEMBRANE ROOF
errupTURE \

ae

 

 

 

 

 

 

CONG. PARKING
AREA
To chil eng, details,

 

      
          

1
2
3

\
and bar ta AS 2890.1, c

  

 

 

PROPOSED FUTURE,
COMMUNITY CENTRE

 

 

 

 

 

 

 

 

 

  
   

i att ttt { PROPOSED
BUILDINGS

   

iiking im

TINS w ben accortanas wiv 8CA. Sundar Ausable
‘BL, 10.050

‘89 Teed tba Errore eae”
GROUND GER GES i
Me OS ag cous wich vay ate Exilirg 1m h Appr
works shea ey Rendered block fance,
Reece ates Aine
“Wi Bo ears oF ROSE

Ferny EIConerat ayehim ws netted on ota epeciied.

      
   

 

4%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.6m High Y FE
enclosure for Hydrant ' s
Booster assambly lore

 

 

 

 

 

 

SETOUT,

 

 

 

 

 

 

 

 

 

 

  

RELOCATED UNDERGROUND FROM THIS POLE.
FRANSFORMER TO BE MOUNTED TO THIS POLE

\ 0 5 40 2 xt 30Meves

Odiginal Seale 1:200

 

 

 
  

SITE PLAN
1:200

 

Development Permit Operational Works No: 2008 OB3/ “*

Sunshine Coast Regional Councilor w: sats!

ERVICES, 3.40 mt

TOTAL GFA: 140m?

RECOMMENDED FOR APPROVAL

PLAN LEGEND
© Sewer man hole
@) storm wator man hola

AA) esting Fre Hydrant
PPC) Evisting power pala tabe removed

tr] Exinting tebsira pit

+ SB - — Existing Telsra ino

-—— Exising Over haad powarinen
ml sa

 

DAH Coxe fre hydrant to Hyd emg detads

NOTE al senices platted bom Surveyors
‘ntormaton,

(©) CORE

wrwcoreacheomant mallgpcoreaichcom au

Bechet 07 1823 644s 07 3807 2667
Sambi Court tc} OAH MSIE as O7 S444 00
every Aap tet OY AIZN Aba By 074120 1455,
‘Whivwrda tw O7AMA NaI be 07 4908 1451

CORE Aechtectoy yd
ABN 79 G00 721 254 Ok Cort 2150

‘This tation the prcowty of tw wt and ey eu by
harp rerstend com, tl oe
a ree ned wo

mage

PROPOSED OFFICE DEVELOPMENT

@

247 DAVID LOW WAY
eat

MORGAN AND BEIERS ATF

 

‘SITE PLAN

 

280772008 AS NOTED

 

Se” 074344_Poregian Commercial plp

Ta re
071314 W01-04 [K ]

 

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0831 - Approved Plans [As Published].pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.