25 MPa concrete, pressure washed to expose aggregate.
AO.5m2 finished sample must be provided to the site
superintendent prior to commencement for approval, The
sample may form part of the final product. Amendments to the
aggregate mix ratios, depth of aggregate exposure or CCS.
saturation, may be made at this stage.

 

 

F62 Reinforcement located

PAVEMENT SCHEDULE

 

 

 

SEATING AREA IN FRONT GARDENS

 

JOINTS

 

+ Expansion joints to be at minimum 12m centres. To be located at edges of tile bands
where possible. 10mm thick closed ceil cross linked polyethylene foam or approved

equivatent.

 

 

  

1 erases
$34 me

 

Th

FOOTPATH PAVEMENT - DETAIL

 

central to the concrete width.

~_ Compacted sub-base and
SJ sub-grade Supply proof of
-——} compaction to site
superintendant,
+ Contraction joints to be at minimum 2.0m centres. Joints to be 25mm depth saw cut or

PAVING TYPE EXPOSED AGGREGATE
CONCRETE AS DETAILED

COLOUR CCS PAPERBARK

FINISH

10MM MARY RIVER
STONEAGGREGATE

 

FOOTPATH ALONG SHOP FRONT.
PAVING TYPE POUREO 125MM DEPTH

 

25MPA CONCRETE WITH
F62 LOCATED CENTRALLY
COLOUR NATURAL GREY
FINISH BROOM FINISH

 

 

 

 

 

 

 

PROVIDE IMPERVIOUS
MEMBRANE COATING TO
INSIDE OF PLANTER TO
MANUFACT. SPECIFICATIONS

PROVIDE GEOTEXTILE SURROUND
TO DRAINAGE CELL & AGGREGATE

LAYER
PROVIDE TOPPING LAYER

TO OBTAIN FALLS TO DRAINAGE

POINTS

PROVIDE AGGREGATE LAYER
TO TOP OF ORAINAGE CELL WITH

GEOTEXTILE SURROUND.

100mm MULCH
LAYER

      

SLOTTED PIPE
Smm BELOW PROVIDE 90 DIA SLOTTED

PIPE WITH GEOTEXTILE
SURROUND AND CAPPED TO.
TOP FOR MAINTENACE ACCESS

SELECT RENDER TO
MATCH BUILDING

 

 

ea ae”

  

 

Radius curve to!
corner of planters

PODIUM PLANTER DETAIL

 

      
        

PROVIDE IMPORTED
PODIUM MIX

PROVIDE DRAINAGE CELL
TO BOTTOM & SIDES.
CUT TO FIT (5mm TOLERANCE)

ORAINAGE LINE TO.
CONNECT TO STORMWATER
DRAINAGE SYSTEM

 

 

 

 

| 0 f

 

0)

50

 

ae

Spit Preventing Bracing,
Mi2 rod/bolt & fixings galvinised
all edges blunt,

 

 

Vertica! face to building
300mm Bollard spacings

to prevent vehicular access.
200x75 CCA treated Fi4
H'Wood posts.

All edges arrissed

finish with Koppers CN oil
or similar

CSC approved.

 

 

 

500

 

[ ‘Concrete footpath

  

{Concrete footing to Engineers detail
(300x400x600mm deep nominal)

 

 

100

 

—}-—Nominal size drainage aggregate.

 

 

400

 

 

FIXED TIMBER BOLLARD DETAIL NTS

 

 

 

 

PROPOSED PLANT SCHEDULE

 

"
K

  

 

 

 

 

 

 

 

y.

Code Botanical Name Common Name | ae read Size Oty.
x

TREES f
ALL equ Allocasuarina equisefitolia She-oak 7™m 2.5m 45 litre 8
BAC cil Backhousea citiodora Lemon Scented Myrtle | Gmto 15m) 2m 45 litre 5
BAN int Banksia integniolia Coastal Banksia 10m 3m 45 titre 7
DIP cam Diplogtottis campbell Small Leaved Tamarind) 6m “2m 45 lite 3
ELA ret Elasocarpus reticulatus Blueberry Ash 6m pm 45 live 10
PAN ped Pandanus pedunculatus * ‘Screw Pine 6m. en 200 litre 3
SHRUBS AND TUFTING PLANTS !
AUS dul Austromyrtus dulcis Midgon Berry 0.7m 4-2m 440 pot | 85
BAN rab | Banksia robur Swamp Banksia 1.5m 1.5m 200 pot 38
CALCap | Callistemon Captain Cook Bottlebrush 2m 1.5m 200 pot 4
CAL Eur | Catistemon Eureka Bottlebrush 4m 4.5m 200 pot 10
CAL LJ Caliistemon ‘Lite John’ im am 200 pot 33
CAR gla Carpobrotus giaucescens Little John Bottlebrush | 9.3m 0.5m 200 pot 50
OIA cae Dianewa caerulee Flax Lily O.Sm-1m | 9.5m 140 po, | 40
DIAton Dianetia longifolia Flax Lily 0.6m 0.5m 440 pot 2
GRERG | Greviles ‘Robyn Gordon’ Robyn Gordon 1m ‘1.2m 200 pot 40
MEL Cla | Melaleuca ‘Claret Tops' ‘A Owadl Paperbath 1.5in 1m 200p1 | 7
LOMcon | Lomandra confertifolia Little Con 0.3m 0.7m 440 83
LOM Ion Lomandra longifolia Mat Rush m \am 140 87
PAN jas Pandarea jasminoldes Pink Bower of Beauty | Climber Climber | 140por | 3
SYZAB Syzygium aus. "Aussie Boomer’ ly Ply 1.5m 1m soo po: | 4
SYzCas | Syzygiumcy. Cascade’ Lilly Pilly 3m 1.5m 300 pot | 9
TEC hit Tecomanthe hii Fraser Island Cimber | — climber gimber | 140p0t | 1

 

 

 

 

 

 

 

 

 

 

 

*Confirm all advanced stack selectians with LandGraphics prior

 

site delivery

X *Certification from the nursery is to be submitted to Councll, that the proposed Pandanus tec, var pedunculatus does not carry
the leaf hopper Jamelia australis, .

Plant No.s to be confirmad prior to
construction.

 

 

 

 

PLANTING DISTANCES
FROM SERVICES
min. DIST. _| SERVICE
3m. POWER POLE:
2m. UNDERGROUND SERVICES
am. STREETLIGHTS
2m, STORMWATER PIT

 

 

 

R

 

SUNSHINE GOA
EGIONAL COUNCIL

PLANS APPROVED

Signature:

    

appror, DIST, | DESCRIPTION

 

 

im, STRE!
FROM BACK OF KERB

0.5m, LANDSCAPING SETBACK WHERE.
VEHICLES FARK PARALLEL TO
KERB

 

 

STREET TREES MUST BE ABLE TO ATTAIN A
CLEAR TRUNK HEIGHT OF 1.9m ON MATURITY,

 

 

LANDSCAPE CONTRACTOR TO VERIFY
LOCATION OF ALL SERVICES &
BOUNDARIES PHIOR TO CONSTRUCTION,

 

 

 

 

   

BS ~ 15000

1 charge to Sunshine Cost

 

Price $165 00 plus gst
Trevor Roy
(Queendand Salas

|

Iteot Future Austalia Pty Lid
Be? Leitchs Ra Brenca’e OLD 4500
T. 4617 3205 1533

F. #61 7 3205 1536

MM, + 422 265 949

www. stroatturniture.com

supports powdercoated. Colour TBA

tens $470.00 each plus gst
wes $410.00 each plus pst

EXAMPLES: BENCH SEATING IN FRONT GARDENS

 

 

(

 

 

   

Planting Area

Turf

EXTRUDED CONCRETE EDGE DETAIL

 

Select Garden Sed Mulch

 

 

 

 

‘SPADE EDGE.
Ensure neal spade
edge is maintalned
to all street ees.

 

 

 

 

 

 

900min
sanerally Ox
depih of rootbatl

Ensure pit
edges are

 

tosmnny wh obey

porous “Generally ax width of roctbal)

PLANTING DETAILS - ADVANCED STOCK

 

 

 

NOTE:

Advanced tree stock planting
selection to council approval.
All street trees to have min.
1.2m clear trunk

 

 

 

£|

 

 

 

 

 

 

 

 

 

1800 x 50 x 50 Hwd slakes.

stakes to be chamfered, centrally
pointed & driven vertically Into
the ground outside the rootball

Approved securing material
such as Rubber tree ties or
50mm julemat/hessian tes

in figure 8 loops secured
loosely to tree & fixed to stake
with fathead galv. nails

100mm nom. compasied organic
mulch or counci approved. Form
shallow dish drain to base of tee.

Mound at pit edge

100mm deep friable imparted

topsof with 20% organic content,

light compaction only,

Tree pit to be excavated to min.

900 depth and backfilled witn

friable soll wilh max. 2% organic

content, light compaction only.

Slow release fertliser 10
manutacturers specifications

Backfill original subgrade

   

Rootball to sit on top of backfil

Cultivate subgrade
to 150mm depth

1:25@A1

 

 

LaNDGRAPHICS

(ANDEGAPE ARCHITECTS

 

Sa atten eso eiwre rang ray se
SS ren ake

 

Faw
Proposed Office Development
Davis Low Way, Peregian Beach

 

chon
Mr Erik Hipwood of MORGAN & BEIERS

 

Ate
‘Core Architects - John Roberson

 

ight compaction only.

ooh To
Operational Works Landscape Details

 

 

 

 

 

 

 

 

 

 

 

 

nos as
me 7]
ome | Me

Cae iho

sess teow
ome — = ane
uckHie] taca | coro c

 

 

 

 

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0831 - Approved Plans [As Published].pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.