SEDIMENT AND EROSION PLAN
Objective/target
Comply with alt statutory reguiations and
maintain them during construction and the
maintenance period. Comply with this erosion
and sediment controt plan, te control
erasian and sediment flows.
Management Strategy Site foreman to identify and check direction
of storm water land flows as shown on the
plan, Provide barriers and other measures
shown on the flan to prevent storm water
flows aver embankments and sediments into
catchpits.
Tasks/ Actions Erect sediment barriers at the tap of
embankments as shown on the drawing.
Strategically place check dams around gully
pits,
Site foreman to check erosion and sediment
flows at the base of embankments after
Performance Indicators
CONCRETE MASONRY BLOCKS
1980 SERIES) INLET WITH GRATE
CONCRETE MASONRY BLOCKS.
2mm WIRE NETTING {150 SERIES!
ALL SIDES
RUNOFF WATER
WITH SEOIMENT
OVERFLOW
NTS
required,
THESE DEVICES ARE DESIGNED TO MINIMISE EROSION AT A CONSTRUCTION
SITE AND CONSEQUENTLY DECREASE DOWNSTREAM SEDIMENT TRANSPORT,
THEY INCLUDE DIVERSION DRAINS, SLOPE DRAINS, ENERGY OISSIPATERS
AND LEVEL SPREADERS.
DIVERSION DRAINS MAY BE FORMED AS A CUT DRAIN, BANK OR BERM OR
A COMBINATION OF BOTH,
SLOPE DRAINS ARE GENERALLY STABILISEO QRAINS WHICH DISCHARGE
WATER FROM THE ENO OF A DIVERSION DRAIN DOWN AN EXPOQSEO SLOPE.
ENERGY DISSIPATERS (EG: HAY BALES} MAY BE NECESSARY AT THE
ENDS OF SLOPE ORAINS.
LEVEL SPREADERS ARE EXCAVATED OUTLETS CONSTRUCTED AT ZERO
GRADE AT THE END OF DIVERSION DRAINS TO CONVERT CONCENTRATED
FLOW TO SHEET FLOW.
ONTROL IE WIND C I D
TO ENSURE THAT ALL WORKS DO NOT DETRIMENTALLY AFFECT THE AMENITY OF
THE GENERAL NEIGHBOURHOOD AND THE ENVIRONMENT SURROUNDS THE FOLLOWING
MEASURES SHOULD BE ADOPTED:
PROVIDE A WATER TRUCK ON SITE FOR THE DURATION OF THE CONTRACT PERIOD.
ALL TOPSOILED AREAS TO BE TREATED BY SURFACE SPRAYING A MINIMUM OF
THREE (3) TIMES PER DAY AT MAXIMUM THREE {3} HOUR INTERVALS, UNTIL
SATISFACTORY GROUND COVER 1S ACHIEVED.
SEDIMENT MANAGEMENT DETAILS
rain. STEEL / TIMBER POST tong, TO BE SPACED
Check that check dams are working during AT 3.0m MAXIMUM crs. EXACT SPACING OF POSTS TO
rain periods. BE CONFIRMED ON SITE BY SUPERINTENDENT. POSTS
Frequency /Deadline Site foreman to monitor performance after 5 TO BE POSITIONED ON DOWNSTREAM SIDE OF FABRIC
fall.
every heavy downfa Z| "SILT LOK’ FILTER FABRIC (or approved equiv.)
Responsible Person/ Site foreman to be responsible for 3 COMPACTEO BACKFILL TO TRENCH
Organisation inspections * FLOW
WSL
Reporting/Re Site workers to advise foreman if they z wg POPS PREPS D SLOT
notice any barrier needing repair. Z| S
Z| LAY THE TOE-IN FLAP OF FABRIC IN THE
Corrective Ac Site foreman to report and order through o BOTTOM OF TRENCH AS SHOWN
supervisor, extra barrier or check dams os 3
DETAILS n4s
POST A END POCKET POST A
POST ol POST B END POCKET
JOINING SECTIONS FO
SILT FENCE ats
« OVERLAP POSTS AS SHOWN TO PREVENT FLOW THROUGH
+ ORIVE POSTS FIRMLY TOGETHER AND WIRE TIE AT TOP TO
PREVENT SEPARATION OF FENCE.
LINE OF POST: f
LEGEND |
Sa
FIELO INLET SEDIMENT TRAP,
EFER DETAIL.
SILT FENCE (SEE DETAIL)
4
FILTER TUBE SECIMENT
TRAP {SEE DETAILI
FIELD INLET SEDIMENT TRAP
NOTE: ALL SERVICES
TO BE LOCATED
ON SITE BY CONTRACTOR
PRIOR TO ANY CONSTRUCTION
| oy
SILT' FENCE FIXED IN ACCORDANCE
WITH MANUFACTURERS SPEC, TO
TEMPORARY SITE FENCING.
y ! i FIELD INLET SEOIMENT
FILTER TUBE SEOIMENT
TRAP, REFER DETAIL.
TF Undr no circumstances may the Plan & Specifications be depar'
from within the written approval of Council.
DAVID LOW WAY
TEMPORARY CONSTRUCTION ENTRY/EXIT. REFER TO QETAIL. ALL
CONSTRUCTION VEHICLES TO USE THIS ENTRY. THE CONTRACTOR
SHALL CONTINUOUSLY MONITOR THE ROAO AOJACENT TO THE SITE
FOR ANY SOIL OR OTHER MATERIAL CARRIEO OFF THE SITE AND
IMMEQIATELY REMOVE SUCH MATERIAL.
LINE OF KERB
AND CHANNEL
7 a
—
a.
GEOTEXTILE FILTER TUBE —
EXTENT OF EARTHWORKS
Dis”
Ve ne Goas gional Couriell
—\= a] Davetapn sit Pernt Ofer al Work to: ZV. od Te
a i)
BERM {300mm
SS HEIGHT}
GEOTEXTILE FABRIC,
BIDUM U34 OR SIMILAR..
a
RUNOFF FROM PAD
DIRECTED TO SEDIMENT TRAP.
LINE OF BELT. SAND FILLED
4. PROVIDE SILT FENCES AT THE TOE OF ALL FL BATTERS. 71 BELT LOOP TO BE TWISTED
2.PROVIDE CHECK DAMS AT TABLE DRAIN OUTLETS AND WHERE DIRECTED. AROUND TOP OF POST
3,PROVIDE TEMPORARY SILT TRAPS AS DIRECTED. REINFORCED BELT AT FILTER TUBE ENTR EDIMENT
%.THE ABOVE SILT MANAGEMENT MEASURES ARE TO BE MAINTAINED UNTIL TOP OF FABRIC ATS NTS
ACCEPTANCE ‘OFF MAINTENANCE’. “
5. THE ABOVE SILT MANAGEMENT MEASURES ARE DESIGNED IN ACCORDANCE WITH
‘SOL EROSION AND SEDIMENT CONTROL’ BY THE IEA AND MAY BE VARIEO BY THE
COUNCIL'S REPRESENTATIVE TO SUIT SITE CONDITIONS.
6.TURFING AND SEEOING ARE TO BE CARRIED OUT AS SOON AS PRACTICABLE. REFER FENCE TO POST
TO THE SPECIFICATION FOR SEED MIXES AND APPLICATION METHODS. CONNECTION x.1.8
NOTES: TITLE: PROJECT: pase, MARCH 2088 | scat ‘AS SHOWN
1 This & the propery ofthe ener, cat ocy ot | AN BARLOW GREGG WHA. | SEDIMENT & EROSION CONTROL] PROPOSED OFFICE ese Jn | arene
mel cp vereasd ly es) | 7 ih 04 a7 30 Acs 16 BY mS PLAN DEVELOPMENT at DAVID LOW [== « f ne
bieagert en 0) may ocd wet cin] || SS PDP sucine cous oie WAY, PEREGIAN BEACH ont ee HS
8 [ CROSSOVER AMENDED 2175/08 | 2. Fagred dasensions teke precedence evet scaled, C7 Sense amy CORAL Const. CORE RRCHITECTS for MORGAN & BEIERS ATF PROJECT-SUBSET-SHEET -REViSI
A} CSSUE FOR OPERATIONAL WORKS APPROVAL wives | 1, Verity cll dimensions of site. n StLk .
No. Amendment Octe [ByjNo Amendment Date |By Cirennegenae oe Ct Ph: (07) 5Gh4 4511 Fox: (07h Shs 6969 M3087 - C02 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.