Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Reference Document - RAL26 0015 - Rehabilitation Management Plan (As Published) · RAL26/0015

of 49

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                     4.3 Timing
                     The following timing of works will ensure that the above objectives are achieved:

                          1. Ensure all visitors to/contractors working on the subject site are made aware of the
                             rehabilitation area boundaries and prohibited activities therein;

                          2. Implement initial rehabilitation works prior to commencement of the landuse on the site.

                          3. Report any unapproved environmental damage immediately to Noosa Shire Council/
                             Department of Natural Resources and Mines, Manufacturing, and Regional and Rural
                             Development/Department of Environment, Tourism, Science and Innovation.

                          4. Implement ongoing maintenance/monitoring of the nominated areas to ensure
                             designated performance criteria are achieved.

                     4.4 Responsibility
                     The following prescribes the necessary responsibilities/accountabilities to ensure satisfactory
                     implementation of all rehabilitation objectives/actions:

                              The current/future landowner(s) is/are required to ensure that all provisions of this
                               document are complied with.

                              Suitably qualified contractors/consultants must be appointed by the landowner(s) to
                               implement relevant works.

                              NSC/DNRMMRRD/DETSI will regulate compliance as deemed reasonable and
                               necessary.

                              Should an incident/activity resulting in negative impacts to the ecological values of the
                               designated areas occur as a result of either accident or negligence, the landowner has
                               a ‘duty to notify environmental harm’ to NSC/DNRMMRRD/DETSI under s320 of the
                               Environmental Protection Act 1994.

                     Such provides a framework for achieving environmental protection/enhancement objectives
                     throughout the designated rehabilitation areas on the site.




                                                                                            Rehabilitation Management Plan
                                                                   Page 10                434 Lake Cooroibah Rd, Cooroibah
                                                                                                   Franz Enterprises Pty Ltd

Document Set ID: 24816703
Version: 1, Version Date: 25/05/2026

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - RAL26 0015 - Rehabilitation Management Plan (As Published).pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.