Dear Colleen, , Uy
Re: Application for a Development Permit for 04/5059 Change a @ T ae *
Development Approval (Landscaping) situated at 2 Tingira i 2 eh ®
Crescent Sunrise Beach described as LOT 146 on RP130983
INFORMATION REQUEST
Thank you for your Information Request, and | hereby submit information as itemized in your
letter of 12” June 2007:
1. Attached are four copies of Landscape Plan 730/ 1 AMENDED 22.6.07 which achieves “a greater
increase in the native vegetation screen amenity to the southem boundary garden areas. .....”-
Large shrubs have been replaced by tree species to grow up in this narrow gap, planted at 1.0
metre centres so that they wili grow up close together partly protecting each other from the
prevailing south-easterlies and form a screen.
2. Attached are four copies of Landscape Plan 739/ 1 AMENDED 22.6,07 which “demonstrates no
more than 30% of the landscaped area around a pool to be a mixture of piants of local origin and
exotic plant species. .....- The 50 number exotic plants in this area have been repiaced by
native species so that at the front door garden, which is not at ail visible from the street, we may
be allowed 66 plants comprising two exotic species, amongst native plants.
3. Attached are four copies of a “MAINTENANCE SCHEDULE with performance indicators over a
3 year period ... to ensure a successful rehabilitation of coastal plant colonies ...”
4. Attached are four copies of Landscape Plan 739/ 1 AMENDED 22.6.07 “that details the inclusion of
large endemic coastal planting to compensate for the intitial removal of healthy large native
vegetation in the road reserve ...” - Along the Tingira Crescent frontage, amongst existing and
smaller planted trees are: 6 number Pandanus tectorius at 200 litre bag size, 10 number
Allocasuarina equisetifolia planted at 45 litre bag size and 4 number Banksia integrifolia planted
at 45iitre bag size.
5. Attached are four copies of Landscape Pian 739/ 1 AMENDED 22.6.07 which “achieves the equal
amount of lawn areas east of the building fine as detailed in the previous operational works
approved drawing.”See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 sections
Section 2
Kindly note that throughout the planting areas shown on the plan, plants are planted closer than one metre apart, so that they will grow up close together helping to protect each other from the prevailing salt-laden south-easterlies. | raise again the issue of David Low Way/Tingira Crescent stormwater runoff probiems. As the stormwater disposal system currently operates, all plantings on the road reserve and in the public foreshore park north of the property boundary, would in a storm most likely be washed, with the sand, down the slope. If Council’s Engineer could be present at the site meeting you proposed with Council's Horticulturist and Council’s Ecologist, then this problem may be able to be solved. | look forward to meeting with you and hope | can work in with your times, although | will be away some of the time in the first half of July. Kindly call with any queries. “Fag Glen Gloster
Section 3
Maintenance schedule for beachfront dune plantings in the Council Reserve immediately north of 2 Tingira Crescent Sunrise Beach. PLANT ESTABLISHMENT PLANT STOCK is growtube size at planting as this size has proven to be more successful, being more adaptable to the dune conditions, growing deeper roots to help stabilize the sand Slope more quickly than larger piant stock. Salt-hardened plant stock is difficult to procure so the proposal is to harden up the stock, in the ground. PLANT SPACINGS - plants are planted close together, approximately 800mm apart, so they jointly modify the microclimate by meshing their canopies together to help protect each other. PLANTING METHOD to be used : - Dig a hole as wide as the plant container and deeper than the container - Mix some humus (on site rotting teaves, small tom wet newspaper, etc) with the sand in the base of the hole (for some moisture retention) - Tip a full bucket of water into the hole and let soak away - Plant the plant, backfilling with sand mixed with some humus, so that the surface leve! of the piant is about 50mm below the surrounding surface level (this watering saucer is so that any rain or water will gather in this area) - Push a slow-release fertilizer tablet in beside the plant - Spread 4-6 layers of soaked newspaper over the sand around the plant for about half a metre radius - Lay and peg erosion-control matting over any areas of possible wash. - Spread mulch to a depth of 100mm over the newspaper around the plant - Dribble a slow hose over the area so that the plant and soil are soaked, not just the mulch layer. WATERING: Design and construct an automatic watering system to cover the entire planting area, run from and paid for by the owners of the Norris Residence. PROTECTION: Protect the new plantings from salt-taden winds and from vandals by constructing temporary protective fencing. MAINTENANCE SCHEDULE FREQUENCY OF MAINTENANCE WORK DAYS In Year 1 — monthly plus at any robust storm event In Years 2 and 3 — each three months plus at any robust storm event MAINTENANCE TASKS to include: WATERING Hand hose down the plants from above to dilute salt accumulation on canopies Check that automatic system is ideaily adapted to the plants and amend as required WEEDING Eradicate weeds from the area as they creep in of appear. tf removal by hand is liable to destabilize the sand slope, spray with a herbicide. Any herbicide is to be a broad spectrum, non-residual, glyphosate based herbicide that has been specifically manufactured for iow
Section 4
aquatic toxicity. Application is to be carried out strictly in accordance the manufacturer's
instructions. Several applications will be required at intervals.
All weeds are to be eradicated including, but not limited to Broad jeaf Pepper Trees,
Umbrella Trees, Asparagus Fern, Lantana, Ageratum, Groundsel, Wedelia, Corky Passion
Vine, Gloriosa, Bryophylium.
TENDING TO PLANTS
Replace dead or dying specimens
Prune if diseased or to help encourage the plant to become more bushy rather than tall
Each year every plant is to be given a new fertilizer tablet
Pull creepers off plants
RESPONDING TO SITE CONDITIONS
Check for erosion gullying, repair the damage, and deal with the reason for the erosion
Construct where required, shade cloth fencing around plantings if plants are being burnt off
by salt-laden winds
Replace depieted or washed muich layer so that there is always a minimum depth of 100mm
over the entire area.
EXPECTATIONS OF GROWTH of the plants. Note that piant height will necessarily be
stunted due to wind shearing of the constant south-easterlies and plants may be bumed off
because of the salt-laden winds.
BY END OF BY END OF
YEAR ONE YEAR THREE
Species Canopy spread mm Canopy spread mm
—— Oe eee
Altocasuarina equisetifolia 1000 2000
Acacia flavescens 1000 2000
Alectryon coriaceus 1000 2000
Clerodendrum floribundum 1000 2000
Banksia integrifolia 200 x height 400 1000 x height 1206
Acronychia imperforata 200 x height 400 1000 x height 1200
Petalostigma pubescens 200 x height 400 1000 x height 1200
Dodonea viscosa 200 x height 400 1000 x height 1200
Macaranga tanarius 200 x height 400 1000 x height 1200
Persoonia comifolia 200 x height 400 1000 x height 4200
Canthium coprosmoides 200 x height 400 1000 x height 1200
Myoporum acuminatum 500 1500
Hibbertia scandens 400 1000
Note that the above figures are expectations of growth only. The expectations can not be
met in the event of storms causing severe salt bum and killing of vegetation, nor of plant loss
due to sand dune slippage caused by council-controlled stormwater management.Section 5
PLEASE NOTE
Attached is a large
document that has NOT
- been scanned.
This document will be sent
over as a hardcopy to the :
relevant Action Officer
once registered into
Dataworks.Used in these records
00153C50.001.pdfRelated documentPublic source context ↗
04/5059 - Response to Info Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.