Council archive · source document
00153C50.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Maintenance schedule for beachfront dune plantings in the Council Reserve immediately north of 2 Tingira Crescent Sunrise Beach. PLANT ESTABLISHMENT PLANT STOCK is growtube size at planting as this size has proven to be more successful, being more adaptable to the dune conditions, growing deeper roots to help stabilize the sand Slope more quickly than larger piant stock. Salt-hardened plant stock is difficult to procure so the proposal is to harden up the stock, in the ground. PLANT SPACINGS - plants are planted close together, approximately 800mm apart, so they jointly modify the microclimate by meshing their canopies together to help protect each other. PLANTING METHOD to be used : - Dig a hole as wide as the plant container and deeper than the container - Mix some humus (on site rotting teaves, small tom wet newspaper, etc) with the sand in the base of the hole (for some moisture retention) - Tip a full bucket of water into the hole and let soak away - Plant the plant, backfilling with sand mixed with some humus, so that the surface leve! of the piant is about 50mm below the surrounding surface level (this watering saucer is so that any rain or water will gather in this area) - Push a slow-release fertilizer tablet in beside the plant - Spread 4-6 layers of soaked newspaper over the sand around the plant for about half a metre radius - Lay and peg erosion-control matting over any areas of possible wash. - Spread mulch to a depth of 100mm over the newspaper around the plant - Dribble a slow hose over the area so that the plant and soil are soaked, not just the mulch layer. WATERING: Design and construct an automatic watering system to cover the entire planting area, run from and paid for by the owners of the Norris Residence. PROTECTION: Protect the new plantings from salt-taden winds and from vandals by constructing temporary protective fencing. MAINTENANCE SCHEDULE FREQUENCY OF MAINTENANCE WORK DAYS In Year 1 — monthly plus at any robust storm event In Years 2 and 3 — each three months plus at any robust storm event MAINTENANCE TASKS to include: WATERING Hand hose down the plants from above to dilute salt accumulation on canopies Check that automatic system is ideaily adapted to the plants and amend as required WEEDING Eradicate weeds from the area as they creep in of appear. tf removal by hand is liable to destabilize the sand slope, spray with a herbicide. Any herbicide is to be a broad spectrum, non-residual, glyphosate based herbicide that has been specifically manufactured for iow
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00153C50.001.pdfRelated documentPublic source context ↗
04/5059 - Response to Info Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.