Response to RFI - Council
Attached to the e-mail MCU17/0563 - Response to Information Request.
Attached to the e-mail Complete - Response to Info Request MCU17 0563.msg.
Our ref: 170612/170901 Response to RFI 030418 abs
Council Ref: MCU17/0563
6 April 2018
Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
Attention: Development Assessment – Lisa Pienaar
Via Email: [email protected]
Dear Lisa,
Re: Response to Information Request
Proposed Material Change of Use (Multiple Housing – Type 2 Duplex)
and Operational Works
30 The Cockleshell, Noosaville
Lot 11 on RP138550
Council ref: MCU17/0563
I refer to Council’s Information Request, dated 10 January 2018 in relation to the
abovementioned development.
On behalf of the applicant, MJ Hussain & LH Randall & SM Johnson Cole & DA
Johnson, and in accordance with Part 3(13) of the DA Rules 2017, we provide a
response to all the issues raised. A response to the items raised in Councils
Information Request is outlined below:
1. A plan (to scale) that clearly details proposed R.L.s of the top of all roof
lines.
RESPONSE
Please refer to Attachment 1 - Amended Architectural Plans prepared by Icon
Building Design, specifically Sheet 05, which demonstrates the RL of the roof line of
9.904 metres. Please see Figure 1 below, which details that the height of the building
does not exceed 8 metres from Natural Ground Level.
Figure 1 Building Height (Source: ICON Building Design)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 23 (of 34)
Page 2
2. A plan (to scale) that clearly demonstrates natural and finished ground surface levels. Include
details of proposed fill levels.
RESPONSE
Please refer to the Amended Operational Works Plans prepared by 360 Civil Consulting Pty Ltd (Attachment
2), specifically Sheets 04 and 05 of 12, which demonstrates the earthworks plan and sections and
demonstrate the natural ground level, as well as the finished surface levels.
In addition to this, Sheet 05 of the Amended Architectural Plans (Attachment 1) also demonstrates the
natural and finished ground surface levels.
3. Provide amended plans that clearly demonstrate compliance with the required setbacks.
RESPONSE
Please refer to the Amended Architectural Plans (Attachment 1), specifically Sheet 03 (Section A), which
demonstrates compliant side setbacks to the ground and first levels (demonstrated in Figure 2 below). It is
noted that the unit design and setbacks are consistent for all units within the development and the identified
section below is sufficient to demonstrate compliance with the side boundary setback requirements.
Building Setback Diagram
Figure 2 Building Setback Diagram (Source: ICON Building Design)
Although the development complies with the side and front boundary setbacks, the development remains non-
compliant with Probable Solution S9.1 of the Noosaville Locality Code, as the development contains a rear
boundary setback of 4.9 metres.
Despite this non-compliance, both adjoining sites are utilised for business purposes and will not be impacted,
nor will impact upon the proposed development within the setback variation, with 31 Thomas Street
containing a carpark to the rear of the site, and 33 Thomas Street containing a single storey building, which
does not include any outdoor functions between the built form and the boundary.
In consideration of the information provided above, the proposed development is compliant with Specific
Outcome O9, as:
Page 3
• The amenity of the residents is protected through the inclusion of screening and landscaping features;
• The development will not impact upon the amenity of adjoining development, given that the
proposed development adjoins business uses within the Business Centre Zone;
• The development contains sufficient space for on-site car parking;
• The development includes setbacks, which are compliant with that of existing developments to the
north and south of the subject site, which include setbacks of approximately 4.18 metres from the rear
boundary; and,
• The setback variations do not result in any impacts to any mapped ecological features.
Accordingly, the development satisfies the setback Assessment Benchmarks outlined within the Noosaville
Locality Code.
4. Provide amended plans that have considered this and demonstrate compliance with the
Noosaville Locality Code with respect to building design (particularly bulk), mix of materials,
and considers the character of Noosaville and the local and surrounding streetscape.
RESPONSE
As demonstrated in the Amended Architectural Plans prepared by ICON Building Design (Attachment 1), the
development has been redesigned such that it presents a lightweight building design, which includes hip and
gable roof lines, timber cladding and variations in design. The revised design is reflective contemporary coastal
character of the surrounding area, will suitably integrate with the existing streetscape, and presents as a
considerable improvement where compared to the original design.
In addition to the variation to the architectural style, the redesign of the development has included design
variations between the two (2) building blocks, such that 30 and 32 The Cockleshell are not a mirror design.
As a result of the architectural re-design, the development complies with all assessment benchmarks of the
Noosaville Locality Code, specifically:
Probable Solution S21.1
Through the development utilising lightweight and textured external building materials.
Probable Solution S49.1
Through the development:
• Not exceeding a maximum wall length of 15 metres, and each wall pane contains an element which
includes visual interest, specifically windows;
• Containing varied roof forms, with the use of hip and gable forms, which provide a point of difference
between each building, it is noted that the units are stacked and do not present as individual units
when viewed from the Cockleshell;
• Does not include upper level balconies, with ground level private open space provided for each unit;
• Visually breaks up the design through the application of different window and roof treatements, which
visually reduces the bulk of the building; and,
• Utilises appropriate landscaping which is reflective of the proposed development and integrates with
the streetscape.
Page 4
5. Provide amended plans that reduce the dominance and bulk of the fencing through innovative
design and include a step-in design (maximum 5 metre intervals). Refer Item 4 of this
information request.
RESPONSE
Please refer to the Amended Architectural Plans prepared by ICON Building Design (Attachment 1), which
demonstrates a varied fence design, such that no fence element contains a continuous section of more than 10
metres.
6. Provide information that provides details on practicalities of how the development will be
accessed, whether it be an access easement, or other arrangement.
RESPONSE
Upon Approval of this Development Application, a subsequent Reconfiguring a Lot application will be lodged to
establish an Access Easement over the driveway and central vehicle manoeuvring areas.
7. Provide a stormwater strategy/layout that caters for the stormwater runoffs from adjoining
properties and ensures no additional stormwater ponding or worsening of existing drainage
conditions to occur on these properties for all storm events up and including 1% AEP (1 in 100
year). This may require providing stormwater pipeline and/or defined overland secondary
flowpath within the development site to convey natural stormwater runoff from other
properties into an existing stormwater system.
RESPONSE
Please refer to the Engineering Response to Council’s Information Request (Attachment 3), as well as the
Amended Operational Works Plans prepared by 360 Civil Consulting Pty Ltd (Attachment 2), which responds to
Information Request Items 7 – 9. The specific response to Information Request Item 7 is detailed below:
‘Skyline Surveyors were able to provide additional survey, spot level information, on some areas of the
neighbouring sites. This information is attached for Council’s record. Please note that in some locations
access was not possible and Skyline obtained as best survey level information as possible. The survey
information indicates the following: -
• Lot CP BUP7701 appears to have a ridge through the middle of the site with the western portion of
the lot falling to the street and the eastern portion of the lot falling to the rear of the site. Possible
pond may occur in the north-eastern corner of the proposed development site. In order to alleviate
this possible ponding a side grated pit is proposed in the base level of the retaining wall which will be
connected to the development site’s internal drainage. This stormwater system is shown on amended
360 Civil Consulting Drawing No. 03 (Rev A).
• Lot 6 RP124554 has an internal stormwater pit and overland flow discharges to Thomas St via the
existing driveway.
• Lot CP BUP7283 is lower than the development site and the survey levels indicate it falls towards
Thomas St.
• Lot CP BUP6949 appears to be slightly lower than the development site and falls towards the street.
The north-eastern corner of Lot CP BUP6949 appears to be approximately at a similar level to the
development site and to address any possible ponding that may occur in this corner a side grated pit
is proposed in the base level of the retaining wall which will be connected to the development site’s
Page 5
internal drainage. This stormwater system is shown on amended 360 Civil Consulting Drawing No. 03
(Rev A)’.
8. Provide further information, details and/or amendments to address the following:
a. The proposed development requires filling, increases load on the existing drainage
pipeline on the site and will limit future opportunities for repair and/or upgrade.
Also, there will be an increase in the flows in the pipeline due to the proposed
development. As such, it is considered necessary that CCTV investigation of the
existing pipeline (from The Cockleshell Street to Thomas Street) be carried out by
the applicant determine the condition of the pipeline and report of investigation
submitted to Council prior to issuing the OPW approval.
b. A drainage easement must be created by the applicant over the subject stormwater
pipeline at a width in compliance with Council’s standards and guidelines. Show the
required easement on the amended plans.
RESPONSE
Please refer to the Engineering Response to Council’s Information Request (Attachment 3), as well as the
Amended Operational Works Plans prepared by 360 Civil Consulting Pty Ltd (Attachment 2), which responds to
Information Request Items 7 – 9. The specific response to Information Request Item 8 is detailed below:
a) ‘Please find attached to this response a preliminary stormwater CCTV report for the existing 375mm
stormwater pipe that runs through 32 The Cockleshell, Noosaville. The CCTV commenced at The
Cockleshell inlet pit and DrainsKleen have advised that "the survey was abandoned - camera travelled
downstream about 7m, before reaching, root mass which camera could not pass. Attempted reverse
survey from other end but unable to access pit."
The report and photos from DrainsKleen of the root mass is attached for council's information. Further
clarification from DrainsKleen regarding the reverse survey was sought and the DrainsKleen operator
who was on site has advised that: -
"I was unable to locate the downstream pit (unsure if downstream pit exists or is just cut into another
pipe). I am also unable to go from one of the neighbour pits on Thomas Street as I can't go around
corners with robot camera due to risk of damaging equipment."
Since this survey, Council have advised that, in due course, they will unblock the stormwater pipe and
that no further work by this development is required in order to address this information request item.
Reviewing the photographs provided in the DrainsKleen report the pipe that is visible appears to be in a
reasonable condition.
b) Please refer to the amended 360 Civil Consulting Drawing No. 03 (Rev 3) which details the 4m wide
drainage easement over the existing council stormwater infrastructure’.
9. Provide an engineering plan and longitudinal cross section for the access driveway/s and
crossovers that include 2.0m wide pathway and demonstrates compliance with IPWEA
Page 6
Standard Drawings RS-049 and RS-050 and have grades ensure a standard vehicle (B99),
entering or leaving the site will not scrape or bottom down.
RESPONSE
Please refer to the Engineering Response to Council’s Information Request (Attachment 3), as well as the
Amended Operational Works Plans prepared by 360 Civil Consulting Pty Ltd (Attachment 2), which responds to
Information Request Items 7 – 9. The specific response to Information Request Item 9 is detailed below:
‘Please refer to the amended 360 Civil Consulting Drawing No. 11 and 12 which detail a driveway long
section and relevant cross section drawings incorporating the 2m wide footpath and compliance with
IPWEA Drawings RS-049 and RS-050’.
10. Provide amended landscaping plans that demonstrate compliance with the minimum
landscaping requirements.
RESPONSE
Please refer to the Amended Architectural Plans (Attachment 1), specifically Sheet 2, which provides detail on
the soft and hard landscaping for each unit, as outlined below:
30 the Cockleshell
• Soft Landscaping = 115.0m2 (45.18%)
• Hard Landscaping = 139.5m2 (54.81%)
• Total = 254.5m2
32 the Cockleshell
• Soft Landscaping = 114.9m2 (45.21%)
• Hard Landscaping = 139.2m2 (54.78%)
• Total = 254.1m2
Overall, each unit block results in a minor shortfall in landscaping, with a shortfall of 9.5m2 for 30 The
Cockleshell and 9.9m2 for 32 The Cockleshell. Overall the development provides a total of 508m2 of
landscaped area, which equates to 42.2% of the consolidate site.
The development has mitigated the landscaping shortfall through providing the soft landscaping elements
to the frontage and rear of the site, as well as the adjoining northern and southern boundaries. Shortfalls to
the required landscaping are considered appropriate given the development is not able to provide
landscaping strips to the internal common boundary, given its required access arrangements. It is noted
that if the common internal boundary was capable of being landscaped, the development would comply
with the landscaping requirements. Thus, the provided landscaping strips on all other boundaries are of an
appropriate width to mitigate amenity impacts and integrate into the existing streetscape.
Despite the proposed non-compliance with Probable Solution S1.1 of the Landscaping Code, the
development satisfies Specific Outcomes O1, with the development providing sufficient landscaped area,
such that:
• The proposed landscaping enhances the visual amentiy and natural landscape character of the
area, through the development containing a significantly improved streetscape, and through the
inclusion of a mix of trees, shrubs and ground covers;
Page 7
• The existing Poinciana is required to be removed due to the central location of the tree and the
required location of the driveway and maneuvering areas, all other vegetation is required to be
removed, in place of new landscaping elements;
• The proposed landscaping assists in reducing the visual impact of the development and assists in
concealing the carparking areas associated with the development, which are integrated into the
design, such that they do not dominate the streetscape; and,
• The development contains sufficient separation and screening to adjoining development to the
north and south, as well as appropriately screening the existing office development to the east.
Accordingly, the development satisfies the intent of Specific Outcome S1.1 of the Landscaping Code.
11. Provide an amended landscape plan which uses a local native species as a feature tree at the
frontage.
12. Provide an amended landscape plan with local native species in accordance with the landscape
and Planning Scheme Policy 3 landscaping Plants and Guidelines of the Noosa Plan.
13. Provide an amended landscape plan demonstrating sufficient volumes of planting media,
above ground volume and drainage for the proposed species.
RESPONSE
Please refer to the Amended Landscaping Plans provided by Element Design (Attachment 4). The Landscaping
Plans identify the use of a Banksia Integrifolia as the feature tree at the frontage of the site and incorporates a
native landscaping palette.
This response represents our complete response to the Information Request issued by the Noosa Council, and
we look forward to the decision notice being issued by Council in accordance with the relevant provisions of the
Planning Act 2016.
As always, please feel free to contact me direct should you require any additional information or clarification.
Yours faithfully,
ADAMS + SPARKES
TOWN PLANNING + DEVELOPMENT
Michael Lyell
SENIOR TOWN PLANNER
Encl: Attachment 1 - Amended Architectural Plans prepared by ICON Building Design
Attachment 2 - Operational Works Plans
Attachment 3 - 360 Civil Consulting Response to IR
Attachment 4 - Amended Landscape Plan
Attachment 5 – CCTV Stormwater Footage prepared by Drains Kleen
Attachment 6 – Additional Survey Data
Page 8
Operational Works (Engineering) for
Proposed Duplexes
at
30-32 Cockleshell, Noosaville
FOR
A R & S M Johnson Coles & Dr D A Johnson
(32 The Cockleshell)
Dr L H Randall & Dr M J Hussain
(30 The Cockleshell)
NOLAN
ST
Drawing Schedule
MARY
DWG DESCRIPTION
ST
2017115-01 Locality Plan and Schedule of Drawings
2017115-02 Existing Features Plan
2017115-03 Stormwater and Development Layout Plan
LL
2017115-04 Earthworks Plan
ESHE
2017115-05 Earthworks Sections
2017115-06 Driveway & Stormwater Setout Plan
OCKL
SYLVIA 2017115-07 Pavement & Jointing Details Plan
ST
SITE OF
THE C
2017115-08 Sewer & Water Connection Plan
WORKS 2017115-09 Erosion & Sediment Plan
2017115-10 Erosion & Sediment Control Details Plan
2017115-11 Driveway Longitudinal Sections
AS ST
2017115-12 Driveway Cross Sections
THOM
GIBSO
N RD
GIBSO
N RD
RP Description
Lot 11 RP138550 & Lot 0 BUP6971
30-32 Cockleshell, Noosaville
LOCALITY PLAN
N.T.S.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: LOCALITY PLAN AND DRAWING INDEX
01 of 12
Page 9
EXISTING TELSTRA LEGEND
D D D D D
EXISTING STORMWATER
EXISTING EXISTING SEWER MAIN
ELECTRICITY EXISTING WATERMAIN
EXISTING ENERGEX - UNDERGROUND
EXISTING SEWER EXISTING TELSTRA
EXISTING CONTOURS
EXISTING SURFACE LEVELS
EXISTING HCB'S
THE COCKLESHELL
EXISTING BUILDING
SEWER MAIN
EXISTING WATER
EXISTING STORMWATER
IL -0.21
SL 1.93
EXISTING WATER IL -0.07 SEWER MAIN
IL -0.20
EXISTING HCB
EXISTING HCB
EXISTING KERB AND CHANNEL EXISTING BUILDING
SEWER MAIN
EXISTING SEWER
CAUTION -
EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT
LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE
PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/011/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: EXISTING FEATURES PLAN
02 of 12
Page 10
EXISTING TELSTRA LEGEND
PROPOSED BUILDINGS
EXISTING
ELECTRICITY
RETAINING WALL BY OTHERS - PROPOSED DRIVEWAY
REFER STRUCTURAL
ENGINEERS DETAILS D D D D D
EXISTING STORMWATER
EXISTING DRIVEWAY TO BE EXISTING SEWER
MIN.FALL 1 IN 100 (TYP) EXISTING SEWER MAIN
REMOVED, KERB AND CHANNEL SWG
AND VERGE TO BE REINSTATED EXISTING WATERMAIN
IN ACCORDANCE WITH COUNCIL EXISTING ENERGEX - UNDERGROUND
REQUIREMENTS
EXISTING TELSTRA
THE COCKLESHELL PROPOSED RETAINING WALLS
GP1 GP1 GP1 (BY OTHERS)
FSL: 2.55 FSL: 2.55 FSL: 2.30 PROPOSED KERB ADAPTORS
IL:1.97
PROPOSED 450 SURFACE GULLY
GP1 PIT WITH PIPE JUNCTION BOX
PROPOSED SWG. SIDE ENTRY
90mm DIA uPVC STORMWATER SWG OVERLAND STORMWATER GRATE.
REFER TO DETAIL
CONNECTION. GRATED DRAIN TO
CONNECT TO KERB ADAPTORS
'ENTRY ONLY' SIGN
NEW KERB ADAPTER IN
ACCORDANCE WITH IPWEA STD
DWG RS-081 GP1
FSL: 2.55
0.000
2.948
IL:1.90
CONCRETE SLEEPER
LINEMARKING MIN.FALL 1 IN 100 (TYP) RETAINING WALL
PROPOSED DRIVEWAYS AS PER
RP BOUNDARY
IPWEA STD DRG RS-049
(TYPE 5) & RS-050
FILLED ALLOTMENT
10.000
20.000
28.311
EXISTING WATER FSL
GP1
METER TO BE STORMWATER EASEMENT
FSL: 2.30
RELOCATED
IL:1.86 NEIGHBOURING ALLOTMENT
DRIVEWAY 1 NSL NSL
'NO ENTRY' SIGN
4.00m
EXISTING STORMWATER BOTTOM WALER
EXISTING SW PIT REPLACED WITH TRENCH STORMWATER PIPE SET BELOW
10
SL:1.68 2 GRATE LAID ON SIDE N.S. TO ACHIEVE 1:100 FALLS
.
AY
00
IL:0.68 W GP1
VE
0
I FSL: 2.30
EXISTING WATER DR PROPOSED FIELD INLET PIT SIDE ELEVATION
CONCRETE SLEEPER
METER TO BE LINEMARKING (TYPE 2B) TO CONNECT TO COUNCIL'S IL:1.86 RETAINING WALL
RELOCATED STORMWATER PIPE. AS PER IPWEA STD DRG DS-050 1000 MIN
'EXIT ONLY' SIGN SL:2.40
PROPOSED DRIVEWAYS AS PER
MIN.FALL 1 IN 100 (TYP)
IPWEA STD DRG RS-049 GP1
(TYPE 5) & RS-050 FSL: 2.30
IL:1.90
NEW KERB ADAPTER IN
ACCORDANCE WITH IPWEA STD
DWG RS-081 200 (H) TRENCH GRATE
90mm DIA uPVC STORMWATER LAID ON SIDE IN PLACE OF
BOTTOM WALL EXTEND
CONNECTION. GRATED DRAIN TO FRONT ELEVATION 100mm PAST POSTS
CONNECT TO KERB ADAPTORS
EXISTING DRIVEWAY TO BE EXISTING SEWER
REMOVED, KERB AND CHANNEL
AND VERGE TO BE REINSTATED
IN ACCORDANCE WITH COUNCIL GP1 GP1 SCALE 1:60 (A3)
UP UP GP1
REQUIREMENTS FSL: 2.55 FSL: 2.55 FSL: 2.30
SWG'S TO BE LOCATED ADJACENT TO LOW POINT IN
IL:1.97 NEIGHBOURING ALLOTMENT TO CAPTURE PONDING CAUSED BY
RETAINING WALL CONSTRUCTION REFER DETAIL
PROPOSED 2.0m FOOTPATH AS
PER IPWEA STD DRG RS-065
SWG
2.00m
EXISTING KERB AND CHANNEL
MIN.FALL 1 IN 100
(TYP) CAUTION -
EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT
LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE
PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11//17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: STORMWATER AND DEVELOPMENT LAYOUT PLAN
03 of 12
Page 11
LEGEND
PROPOSED CUT
CONCRIB/BLOCK RETAINING PROPOSED FILL
WALL (OR EQUIVALENT) BY
OTHERS - REFER STRUCTURAL D D D D D
EXISTING STORMWATER
ENGINEERS DETAILS
A
EXISTING SEWER MAIN
TW 2.40 TW 2.55 TW 2.55 EXISTING WATERMAIN
NSL 1.85 NSL 1.93 NSL 1.97 EXISTING ENERGEX - UNDERGROUND
EXISTING TELSTRA
PROPOSED RETAINING WALL
FSL 2.55 (BY OTHERS)
4.00 PROPOSED CONTOURS
FFL 2.70
PAD 2.40 TW 2.55
FSL 2.55 FSL 2.40 NSL 1.80
FSL 2.40 FSL 2.55
C EARTHWORKS QUANTITIES
05 TW 2.40
NSL 1.79
FSL 2.65 FSL 2.65 TOPSOIL STRIP:
8.3%
EARTHWORKS CUT:
FILL REQUIRED:
FSL 2.48 FSL 2.48 DEFICIT:
FSL 2.55 FSL 2.55
TW 2.40 NOTES:
NSL 1.90
1.4%
1. ALL VOLUMES INDICATED ARE SOLID VOLUMES.
2. ASSUMED TOPSOIL STRIP AT 150mm THICK.
3. EARTHWORKS QUANTITIES BASED ON COMPARISON BETWEEN
EARTHWORKS/ BOXING LEVELS AND NATURAL SURFACE.
TW 2.55
NSL 2.30
FSL 2.30 FSL 2.45
SL 2.40
TW 2.40 EARTHWORKS NOTES
NSL 2.11
2.4%
1. CONTROL TESTING OF EARTHWORKS TO BE IN
FSL 2.55 FSL 2.55 ACCORDANCE WITH AS3798-1996, WITH LEVEL 1 GEOTECHNICAL
CERTIFICATION.
FSL 2.48 FSL 2.48
TW 2.40 2 ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE
8.3%
NSL 1.94 INSTALLED AND FULLY OPERATIONAL BEFORE COMMENCING
FSL 2.65 FSL 2.65 UP-SLOPE EARTHWORKS.
TW 2.55 3 ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND
NSL 3.30 MARKED PRIOR TO COMMENCING EARTHWORKS.
FSL 2.40 FSL 2.55 FSL 2.55 FSL 2.40
FFL 2.70 4. FILL DENSITY TESTING SHALL CONFORM TO THE
PAD 2.40 FOLLOWING:
B a. 1 TEST PER 500 cu.m - GENERALLY
05
b. 1 TEST PER 2 LAYERS PER 40m - TRENCH
BACKFILL
5 PLACEMENT OF FILL SHALL CONFORM TO THE FOLLOWING
UP UP
MINIMUM DRY DENSITY RATIO (M.D.D.R.) COMPACTION
STANDARDS:
c. ALLOTMENTS = 98% STD
d. ROAD VERGES/EMBANKMENTS = 98% STD
FSL 2.55 e. PAVEMENT SUBGRADE = 100% STD FOR
NON-COHESIVE MATERIALS, M.D.D.R. = 80%
TW 2.40 TW 2.55 TW 2.55 5. ALL ALLOTMENTS OR AREAS SUBJECT TO EARTHWORKS
NSL 1.92 NSL 2.11 NSL 2.00 ARE TO BE FREE DRAINING WITH A MINIMUM SLOPE OF 1:100.
6. ALL TEMPORARY STOCKPILES (IF APPLICABLE) TO HAVE 1:6
MAXIMUM SIDE BATTERS (GRASS SEEDED).
7. ALL WORK TO BE STRICTLY IN ACCORDANCE WITH
STANDARD EARTHWORKS SPECIFICATION.
CAUTION -
05
EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT
LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE
PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: EARTHWORKS PLAN
04 of 12
Page 12
RP BDY
DUPLEX DRIVEWAY DUPLEX
RP BDY
FFL 2.70 FFL 2.70
DESIGN SURFACE
SECTION A EXISTING SURFACE
04 SCALE 1:200
RP BDY
RP BDY
DUPLEX
RETAINING WALL BY OTHERS -
REFER STRUCTURAL
ENGINEERS DETAILS
FFL 2.70
COCKELSHELL
DESIGN SURFACE
RETAINING WALL BY OTHERS -
REFER STRUCTURAL
SECTION B EXISTING SURFACE
ENGINEERS DETAILS
04 SCALE 1:200
RP BDY
RP BDY
DUPLEX
RETAINING WALL BY OTHERS -
REFER STRUCTURAL
ENGINEERS DETAILS
FFL 2.70
COCKELSHELL
DESIGN SURFACE
RETAINING WALL BY OTHERS -
REFER STRUCTURAL
SECTION C EXISTING SURFACE
ENGINEERS DETAILS
04 SCALE 1:200
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: EARTHWORKS SECTIONS
05 of 12
Page 13
LEGEND
PROPOSED DRIVEWAY
150 THICK N32 CONCRETE
D D D D D
EXISTING STORMWATER
EXISTING SEWER MAIN
EXISTING WATERMAIN
EXISTING ENERGEX - UNDERGROUND
EXISTING TELSTRA
PROPOSED KERB ADAPTORS
THE COCKLESHELL
AND ROOF WATER CONNECTION
1.50m 1.50m 0.59m
SAW CUT JOINT
(REFER DWG 07 FOR DETAILS)
EXPANSION JOINT
(REFER DWG 07 FOR DETAILS)
4 FSL 2.65 FSL 2.65
1 2 3
SETOUT POINTS
4.00m
12.5% 2.5% 5.0%
4.95m
No, LEVEL *
1 1.566
PROPOSED DRIVEWAYS 5 2 1.753
AS PER IPWEA STD DRG
RS-049 (TYPE 5) & RS-050 7 5.5%
3 1.791
4 1.821
8 5 2.175
6 1.533
1.73m
9 7 1.721
8 1.758
19 FSL 2.30 FSL 2.50
9 1.788
10 1.535
11 1.722
SL 2.40
12 1.760
13 1.790
0.70m
18 14 1.564
5.3% 15 1.751
16 1.789
10 11 17 1.819
18 2.182
19 2.132
4.95m
* REPRESENTS FINISHED CONCRETE LEVEL
4.00m
12.5% 2.5% 5.0%
PROPOSED DRIVEWAYS
AS PER IPWEA STD DRG 125mm THICK N32 CONCRETE
RS-049 (TYPE 5) & RS-050 14 15 FSL 2.65 FSL 2.65 WITH SL72 MESH
16 17
NOTES
1. DRIVEWAY AND CROSSOVER TO BE CONSTRUCTED IN
ACCORDANCE WITH IPWEAQ STD DRG RS-049 & RS-050
2. ALL ROOFWATER AND STORMWATER TO DISCHARGE
CAUTION - TO NEW KERB ADAPTORS AND DRIVEWAY STORMWATER PIT
EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT 3. DRIVEWAY SET OUR TO BE INSPECTED BY AN RPEQ
LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE PRIOR TO POUR.
PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION. NOTE: 4. ALL VERGE AREAS TO TIE BACK INTO EXISTING
THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO FOR BUILDING SETOUT REFER TO ARCHITECTS DRAWINGS
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: DRIVEWAY AND STORMWATER SETOUT PLAN
06 of 12
Page 14
SUGGESTED EXPANSION JOINT METHOD FOR CONTINUOUS POURING
CONSTRUCTION NOTES AND METHODS
SAW CUT JOINT ISOLATION JOINT
(CONTROL JOINT)
(Maximum spacing; 4m)
FORMED JOINT (WITH SHEAR KEY)
EXPANSION JOINT (CONTROL JOINT)
(Maximum spacing; 100mm thick 2m / 150mm thick 4m)
(Maximum spacing 12m)
MESH COVER
DOWEL BAR SCHEDULE
TYPICAL PROFILE DRIVEWAY ACCESS
(EXTRACT FROM IPWEAQ STD DRAWING RS-050)
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: PAVEMENT AND JOINTING DETAILS PLAN
07 of 12
Page 15
LEGEND
PROPOSED BUILDINGS
SEWER RETICULATION NOTES
GENERAL NOTES
PROPOSED DRIVEWAY G1 ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH
EAST QUEENSLAND SEWERAGE CODE SPECIFICATIONS AND STANDARDS.
D D D D D
EXISTING STORMWATER G2 UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH
EXISTING SEWER MAIN THE RELEVANT AUSTRALIAN STANDARDS.
G3 THE CONSTRUCTION OF THE SEWERAGE WORK SHOWN ON THIS DRAWING SHALL
EXISTING WATERMAIN
BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. SEWERAGE
EXISTING ENERGEX - OVERHEAD WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL NOT BE PERMITTED TO
EXISTING TELSTRA CONNECT INTO THE SEQ SERVICE PROVIDER SEWERAGE SYSTEM.
G4 ALL WORK ASSOCIATED WITH LIVE SEWERS OR MAINTENANCE HOLES SHALL BE
wat PROPOSED WATER METERS
CARRIED OUT BY UNITYWATER AT THE DEVELOPER'S COST.
THE COCKLESHELL EXISTING HCB G5 ALL PIPES AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE
"ACCEPTED PRODUCTS AND MATERIALS" LIST.
G6 EACH NEW ALLOTMENT SHALL BE SERVED BY A DN150 PVC PROPERTY
CONNECTION.
G7 PROPERTY CONNECTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN
IN THE DRAWING.
G8 PROPERTY CONNECTION BRANCHES SHALL EXTEND INTO THE PROPERTY A
MINIMUM OF 750MM. UNITY WATER REQUIRES MINIMUM EXTENSION OF 500MM
INTO PROPERTY.
G9 WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS
NOT EXCEEDING 300MM (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE
COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION
WHEN TESTED IN ACCORDANCE WITH A.S/ 1289 (MODIFIED COMPACTION). TESTING
SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER, IN ALL SUCH CASES
APPROVAL OF CONSTRUCTED SEWERS WILL NOT BE ISSUED BY THE SEQ SERVICE
4x DN20 WATER METERS AS PER STD PROVIDER UNLESS CERTIFICATES ARE PRODUCED CERTIFYING THAT THE
DWGS SEQ-WAT 1108-2 & SEQ-WAT 1108-3
REQUIRED COMPACTION HAS BEEN ACHIEVED.
BY UNITYWATER AT DEVELOPERS REMAIN. G10 WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR STEEPER, BULKHEADS SHALL BE
EXPENSE. EXISTING WATER METERS TO BE SL: 1.90 CONSTRUCTED IN ACCORDANCE WITH THE SEQ SEWER CODE.
RELOCATED AND EXISITNG ROAD IL: -0.39 G11 THE CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING
CONDUITS TO BE UTILISED FOR NEW
SERVICES WITH RELEVANT AUTHORITIES BEFORE COMMENCING WORKS.
WATER METERS.
G12 SEWERS SHALL BE DISUSED/ABANDONED IN ACCORDANCE WITH PROCEDURES
SEWER MAIN
SET OUT IN THE SEQ SEWER CODE.
G13 BENCH MARK AND LEVELS TO AHD.
wat wat wat wat
t
wa
t
wa
WATER RETICULATION NOTES
IL -0.21
VEGETATION PROTECTION
wat
SL 1.93 A. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIOR TO CONSTRUCTION,
EXISTING WATER METERS TO BE OR REPLACE IF DESTROYED.
wa
IL -0.07 SEWER MAIN
t
RELOCATED B. WHEN WORKING WITHIN 4M OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE
wat
IL -0.20
wat wat wat wat
CONSTRUCTED WITH 1.8M BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM
GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND
REMAIN UNTIL COMPLETION.
C. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS ARE SEVERED
THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT RELEVANT
ARBORIST FOR FURTHER ADVICE.
D. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.
SOIL
REMAIN. A. TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.
SL: 1.93 B. CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER SYSTEM.
IL: -0.20 THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT CONTROLS AROUND STOCKPILES.
SEWER MAIN
REHABILITATION
A. PREDISTURBANCE SOIL PROFILES AND COMPACTION LEVELS SHALL BE REINSTATED.
B. PREDISTURBANCE VEGETATION PATTERNS SHALL BE RESTORED.
GENERAL NOTES
G1 ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH EAST
QUEENSLAND WATER SUPPLY CODE SPECIFICATIONS AND STANDARDS
G2 UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH THE
UP UP RELEVANT AUSTRALIAN STANDARDS.
G3 ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.
G4 COVER ON MAINS FROM PERMANENT LEVEL TO BE AS SHOWN IN SEQ-WAT-1200-2
G5 CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE STANDARD DRAWINGS.
G6 A WATER METER SUPPLIED AT THE DEVELOPERS COST, IS TO BE INSTALLED AT THE SERVICE
POINT OF EACH LOT IN ACCORDANCE WITH THE SEQ CODE.
G7 ALL MATERIALS USED IN THE WORKS SHALL COMPLY WITH THE SEQ-SP'S ACCEPTED PRODUCTS
AND MATERIALS LIST OR BE APPROPRIATELY SHOWN, LISTED AND DEFINED IN THE
ENGINEERING SUBMISSION SO THAT THE ALTERNATIVE PRODUCT OR MATERIAL CAN BE
ASSESSED AND IF APPROPRIATE SEQ-SP.
G8 ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS.
G9 TEST/CHLORINATION POINTS TO BE INSTALLED IN ACCORDANCE WITH STANDARD DRAWING
ALL ENVIRONMENTAL PROTECTION MEASURES SHOULD NO.SEQ-WAT-1410-1
BE IMPLEMENTED PRIOR TO ANY CONSTRUCTION WORK, G10 THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN ON THIS DRAWING MUST BE
INCLUDING CLEARING COMMENCING. SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. WORKS NOT COMPLYING WITH
RP Description G11
THIS REQUIREMENT WILL NOT BE PERMITTED TO CONNECT TO THE RETICULATION SYSTEM.
ALL WATERMIAINS SHALL HAVE APPROVED DETECTABLE MARKER TAPE LAID ON TOP OF THE
CAUTION - BEDDING.
EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT Lot 11 RP138550 & Lot 0 BUP6971
LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE 30-32 Cockleshell, Noosaville
PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 15/07/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 15/07/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: SEWER AND WATER CONNECTION PLAN
08 of 12
Page 16
LEGEND
PROPOSED CUT
PROPOSED FILL
D D D D D
EXISTING STORMWATER
EXISTING SEWER MAIN
EXISTING WATERMAIN
EXISTING ENERGEX - UNDERGROUND
X X X X X X X X X X EXISTING TELSTRA
SEDIMENT FENCE
X
X
TURF STRIPS BEHIND KERB AND
EFFECTIVELY STABILISE SITE AS
X
CHANNEL
X
SOON AS PRACTICABLE AFTER
COMPLETION OF CIVIL AND BUILDING
WORKS
X
TEMPORARY STABILISED SITE
ACCESS SEDIMENT FENCE
X
X
X
X
X
X
UP UP
X
X X X X X X X X X
CAUTION -
EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT
LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE
PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: EROSION AND SEDIMENT PLAN
09 of 12
Page 17
1. GENERAL
(A) TEMPORARY DRAINAGE CONTROL. FLOW SHOULD BE DIVERTED AROUND
THE WORK SITE WHERE POSSIBLE.
ETRES (B) ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED IN
AT MAX. 2.5 M CENTRES
SELF-SUPPORTING
ID TH 3 M
GEOTEXTILE MIN. W ACCODANCE WITH I E AUST. SOIL EROSION AND SEDIMENT CONTROL
MANUAL, AS DETAILED ON THIS PLAN, OR AS REQUIRED FOR COMPLIANCE
WITH THE REQUIREMENTS OF THE ENVIRONMENTALMANAGEMENT PLAN /
EROSION & SEDIMENT CONTROL PLAN.
(C) ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE OPERATIONAL
500 MM TO 600 MM DIRECTION OF CONSTRUCTION SITE MIN.
LENG BEFORE COMMENCING UP-SLOPE EARTHWORKS AND SHALL REMAIN IN
FLOW TH 15 PLACE UNTIL PERMANENT WORKS ARE COMPLETE AND CATCHMENT
METR VEGETATION IS ESTABLISHED (60% GRASS COVER MINIMUM)
ES
(D) THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT AND EROSION
CONTROL DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS
200 MM MIN. (1) DURING CONSTRUCTION & DEFECT LIABILITY PERIOD
600 MM MIN. (i) WEEKLY DURING DRY WEATHER
ON SOIL, 150 MM X 100 MM
DARY (ii) PRIOR TO PREDICTED STORM EVENTS
TRENCH WITH COMPACTED BOUN
ERTY (iii) TWICE DAILY DURING PROLONGEDE RAIN
BACKFILL AND ON ROCK, SET 300 MM MIN. PROP
INTO SURFACE CONCRETE (iv) DURING AND AFTER MAJOR STORM EVENTS
(E) ALL DISTURBED LAND MUST BE TREATED TO PREVENT RAIN DROP IMPACT
EROSION BY THE ESTABLISHMENT OF 60% EFFECTIVE GROUND COVER
SECTION DETAIL WITHIN 28 DAYS OF FINAL EARTHWORKS TRIM.
(F) IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED
DISTURBED AREA SURFACES TO BE EITHER MULCHED, COVERED WITH EROSION CONTROL
RUNOFF DIRECTED TO BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED
SEDIMENT TRAP/FENCE FOR MORE THAN 14 DAYS.
DIRECTION OF (G) STRAW BALE SEDIMENT TRAPS ARE A SECONDARY OPTION WHICH
FLOW GENERALLY SHOULD NOT BE USED IF OTHER OPTIONS ARE AVAILABLE.
DGB 20 ROADBASE OR
1.5 M STAR PICKETS
30 MM AGGREGATE 2. SEDIMENT CONTROL FENCE
AT MAX. 2.5 M CENTRES
(A) NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
(B) NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM
EXISTING ROADWAY CATCHMENT AREA 0.6 HA PER 100M LENGTH OF FENCE.
GEOTEXTILE FABRIC DESIGNED TO (C) WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED
PREVENT INTERMIXING OF SUBGRADE ON SMALL WORK SITES, I.E. OPERATIONAL PERIOD LESS THAN 6
AND BASE MATERIALS AND TO MAINTAIN
MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS NOT
GOOD PROPERTIES OF THE SUB-BASE LAYERS.
EXPECTED.
GEOFABRIC MAY BE A WOVEN OR NEEDLE-PUNCHED
(D) WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR -
REFER IPEAWQ STANDARD DRAWING D-0040 FOR DETAILS.
PRODUCT WITH A MINIMUM CBR
(E) FENCES ARE REQUIRED 2m MIN FROM TOE OF CUT OR FILL BATTERS,
BURST STRENGTH (AS3706.4-90) OF 2500 N
UNDISTURBED AREA WHERE NOT PRACTICAL ONE FENCE CAN BE AT THE TOE WITH A SECOND
FENCE 1M MIN AWAY. FENCE SHOULD NOT BE LOCATED PARALLEL WITH
TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
3. TEMP CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP.
(A) ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.
(B) WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.
N.T.S. 4. SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES, INCORPORATE
CONSTRUCTION NOTES TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE
20 M MAX.
SWMP/ESCP) 1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE. SUPERINTENDENT.
OTHERWISE ON
(UNLESS STATED 2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE. 5.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL SEDIMENT
3. CONSTRUCT A 200 MM THICK PAD OVER THE GEOTEXTILE USING ROAD BASE AND EROSION CONTROL MEASURES HAVE BEEN ADDRESSED AS STIPULATED
FLOW OR 30 MM AGGREGATE. IN THE ENVIRONMENTAL MANAGEMENT PLAN / EROSION & SEDIMENT CONTROL
4. ENSURE THE STRUCTURE IS AT LEAST 15 METRES LONG OR TO BUILDING PLAN. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION
ALIGNMENT AND AT LEAST 3 METRES WIDE. PHASE, AS DIRECTED ON SITE BY THE SUPERINTENDANT.
5. WHERE A SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, TEMPORARY 6. STOCKPILES TO HAVE 1:6 SIDE BATTERS (MAXIMUM) AND BE
CONSTRUCT A HUMP IN THE STABILISED ACCESS TO DIVERT WATER TO THE SHAPED TO ENSURE RUN-OFF IS TREATED AND MANAGED TO THE
SEDIMENT FENCE SATISFACTION OF THE SUPERINTENDANT. ALL EXPOSED STOCKPILE
SURFACES TO BE GRASS SEEDED. SEDIMENT FENCES AND CUT-OFF
DRAINS MAY BE REQUIRED, AT THE DISCRETION OF THE SUPERINTENDANT.
MIN. 1.5 M
7. SEDIMENT AND EROSION CONTROL DEVICES (OTHER THAN THOSE ALREADY
STAR PICKETS AT MAXIMUM PLAN SHOWN) ARE TO BE INSTALLED WHERE NECESSARY AND AS DIRECTED BY
2.5 M SPACINGS SUPERINTENDENT
8. SEDIMENT AND EROSION CONTROL DEVICES ON THIS PLAN ARE INDICATIVE
ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT THE
N.T.S.
INTENTS OF THIS PLAN AND ENVIRONMENTAL MANAGEMENT PLAN ARE COMPLIED
CONSTRUCTION NOTES WITH.
1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE RET
SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE 5 ME URN T
SECTION. THE CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF CONCENTRATED AT TRE URF CONSTRUCTION NOTES
ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN STORM EVENT, USUALLY THE 10-YEAR EVENT. S TO STR
PRE IPS E 1. INSTALL A 2 x 400mm MINIMUM WIDE ROLL OF TURF ON THE
2. CUT A 150-MM DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC VEN VER
TO BE ENTRENCHED. T SC Y VERGE NEXT TO THE KERB AND AT THE SAME LEVEL AS THE TOP
OUR OF THE KERB.
3. DRIVE 1.5 METRE LONG STAR PICKETS INTO GROUND AT 2.5 METRE INTERVALS (MAX) AT THE DOWNSLOPE
2. LAY 1.4 METRE LONG TURF STRIPS NORMAL TO THE KERB EVERY
EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE FITTED WITH SAFETY CAPS. E TR E
1 M 5 METRES.
4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS ENSURING IT GOES TO THE
BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH WIRE TIES OR AS RECOMMENDED BY THE
MANUFACTURER. ONLY USE GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
5. JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150-MM OVERLAP.
6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT THOROUGHLY OVER THE
M MIN.
GEOTEXTILE. TUR
F 800 M
KER
B
GUT
T ER
ROA
DW
AY
N.T.S.
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
A 08-03-18 CHANGES AS PER COUNCIL RFI
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11/17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL. NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: EROSION & SEDIMENT CONTROL DETAILS PLAN
10 of 12
Page 18
I.P.17.073, 2.544
I.P.9.848, 2.111
PROPERTY BDY
I.P.5.692, 1.909
I.P.3.014, 1.775
I.P.1.500, 1.737
GRADE 12.500% 2.500% 5.000% 4.860% 6.000% 0.500%
DATUM R.L.0.0
CUT(-)/FILL(+)
DESIGN SURFACE
LEVELS
NATURAL SURFACE
LEVELS
CHAINAGE
LONG SECTION-DRIVEWAY 1
SCALE 1:100
I.P.3.866, 1.800
I.P.1.493, 1.741
12.500% 2.500% 4.846%
GRADE
DATUM R.L.0.0
CUT(-)/FILL(+)
DESIGN SURFACE
LEVELS
NATURAL SURFACE
LEVELS
CHAINAGE
LONG SECTION-DRIVEWAY 2
SCALE 1:100
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11//17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: DRIVEWAY LONGITUDINAL SECTIONS
11 of 12
Page 19
Centreline Data Centreline Data
X = 371.544 X = 352.879
Centreline Data Y = 366.340
Y = 366.510
X = 349.810 Z = 2.097
Z = 2.600
Y = 369.085
Z = 1.909 DATUM RL 1.000 DATUM RL 1.000
2.097
2.097
2.097
2.600
2.600
2.600
DATUM RL 1.000 DESIGN DESIGN
1.909
1.909
1.909
DESIGN
2.032
2.266
2.213
1.916
1.946
SURVEY SURVEY
1.798
1.874
1.909
SURVEY
-2.000
0.000
2.000
-2.000
0.000
2.000
OFFSET OFFSET
-2.109
0.000
0.927
OFFSET
CHAINAGE 28.311 CHAINAGE 10
Centreline Data
CHAINAGE 5.692
X = 347.481
Centreline Data
Centreline Data Y = 361.549
X = 360.233
X = 347.692 Z = 1.773
Y = 366.516
Y = 370.746
Z = 2.540 DATUM RL 1.000
Z = 1.774
1.773
1.773
1.773
DATUM RL 1.000 DESIGN
DATUM RL 1.000
2.540
2.540
2.540
DESIGN
1.774
1.774
1.774
DESIGN
1.869
1.841
1.852
SURVEY
1.977
2.016
SURVEY
1.782
1.830
1.759
SURVEY OFFSET
-1.852
0.000
2.158
OFFSET
-2.000
0.000
2.608
-2.003
0.000
2.501
OFFSET
CHAINAGE 2.782
CHAINAGE 17
CHAINAGE 3 Centreline Data Centreline Data
Centreline Data
X = 353.233 X = 346.192
X = 346.203
Y = 366.519 Y = 361.549
Y = 370.778
Z = 2.120 Z = 1.741
Z = 1.737
DATUM RL 1.000 DATUM RL 1.000
DATUM RL 1.000
1.741
1.741
1.741
2.120
2.120
2.120
DESIGN DESIGN
1.737
1.737
1.737
DESIGN
1.767
1.768
1.776
1.912
2.298
2.107
SURVEY SURVEY
1.778
1.763
1.762
SURVEY
-1.875
-2.693
0.000
2.154
0.000
2.739
OFFSET OFFSET
-2.000
0.000
2.000
OFFSET
CHAINAGE 1.493
Centreline Data CHAINAGE 1.5 CHAINAGE 10
Centreline Data Centreline Data
X = 344.703 X = 353.081 X = 344.699
Y = 370.778 Y = 366.519 Y = 361.549
Z = 1.549 Z = 2.111 Z = 1.554 0% 0%
DATUM RL 1.000 DATUM RL 1.000 DATUM RL 1.000
1.549
1.549
1.549
1.554
1.554
1.554
2.111
2.111
2.111
DESIGN DESIGN DESIGN
1.569
1.549
1.533
1.546
1.554
1.564
1.904
2.290
2.096
SURVEY SURVEY SURVEY
-2.000
-1.901
0.000
2.000
-2.802
0.000
2.150
OFFSET
0.000
2.874
OFFSET OFFSET
CHAINAGE 0
CHAINAGE 9.848 CHAINAGE 0
CROSS SECTION-DRIVEWAY 1 CROSS SECTION-DRIVEWAY 2
SCALE 1:100 SCALE 1:100
360 CIVIL CONSULTING PTY LTD No Date Amendment
Design: J.A.G FOR APPROVAL CLIENT: JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN JOB NUMBER
ABN: 13 609 593 339 Drawn: J.A.G PROJECT: PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
2017115
23 OOGAR STREET, MAROOCHYDORE. QLD 4558 Date: 04/11//17
BEATRICE GIBBERD RPEQ 14557 AT: 30-32 COCKLESHELL, NOOSAVILLE
DRAWING No:
Mobile: 0403 862 009 Email: [email protected] Checked: B.G. DATE: 04/11/2017 LOT 11 ON RP138550 & 0 BUP6971
THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
Datum: A.H.D. Size: A3 TITLE: DRIVEWAY CROSS SECTIONS
12 of 12
Page 20
Dr David Johnson & Suzanne & Adam Johnson c/- Mr Michael Lyell Adams & Sparkes Town Planning and Development Brightwater Corporate Centre Level 1, 69 Attenuata Drive MOUNTAIN CREEK QLD 4557 Via email: - [email protected] 11 March 2018 Dear Michael, RE: 30 – 32 The Cockleshell, Noosaville Engineering Response to Information Request Please find below responses to the Noosa Council’s Information Request dated 10 January 2018 for the MCU at 30 – 32 The Cockleshell, Noosaville. Please be advised that the below responses and attachments are a response to information request items 7, 8 and 9 only. Application No: MCU17/0563 Proposal: Development Permit for Material Change of Use Street Address: 30 – 32 The Cockleshell, Noosaville Real Property Description: Lot 11 RP138550 and Lot 0 BUP6971 Planning Scheme: The Noosa Plan (3 July 2017) Issue The submitted stormwater drainage plans do not adequately address the impact of the development and the filling of the site on the drainage conditions on other properties. Information Required Item 7 Provide a stormwater strategy/layout that caters for the stormwater runoffs from adjoining properties and ensures no additional stormwater ponding or worsening of existing drainage conditions to occur on these properties for all storm events up and including 1% AEP (1 in 100 year). This may require providing stormwater pipeline and/or defined overland secondary flow path within the development site to convey natural stormwater runoff from other properties into an existing stormwater system.
Page 21
Response to Item 7
Skyline Surveyors were able to provide additional survey, spot level information, on some
areas of the neighbouring sites. This information is attached for Council’s record. Please
note that in some locations access was not possible and Skyline obtained as best survey
level information as possible. The survey information indicates the following: -
Lot CP BUP7701 appears to have a ridge through the middle of the site with the
western portion of the lot falling to the street and the eastern portion of the lot
falling to the rear of the site. Possible pond may occur in the north-eastern corner of
the proposed development site. In order to alleviate this possible ponding a side
grated pit is proposed in the base level of the retaining wall which will be connected
to the development site’s internal drainage. This stormwater system is shown on
amended 360 Civil Consulting Drawing No. 03 (Rev A).
Lot 6 RP124554 has an internal stormwater pit and overland flow discharges to
Thomas St via the existing driveway.
Lot CP BUP7283 is lower than the development site and the survey levels indicate it
falls towards Thomas St.
Lot CP BUP6949 appears to be slightly lower than the development site and falls
towards the street. The north-eastern corner of Lot CP BUP6949 appears to be
approximately at a similar level to the development site and to address any possible
ponding that may occur in this corner a side grated pit is proposed in the base level
of the retaining wall which will be connected to the development site’s internal
drainage. This stormwater system is shown on amended 360 Civil Consulting
Drawing No. 03 (Rev A).
Issue
Further information and details are required regarding the existing Council’s stormwater
pipeline within Lot 0 BUP 6971 (No 32 The Cockleshell Street).
Information Required Item 8
Provide further information, details and/or amendments to address the following:
a) The proposed development requires filling, increases load on the existing drainage
pipeline on the site and will limit future opportunities for repair and/or upgrade.
Also, there will be an increase in the flows in the pipeline due to the proposed
development. As such, it is considered necessary that CCTV investigation of the
existing pipeline (from The Cockleshell Street to Thomas Street) be carried out by the
applicant determine the condition of the pipeline and report of investigation
submitted to Council prior to issuing the OPW approval.
b) A drainage easement must be created by the applicant over the subject stormwater
pipeline at a width in compliance with Council’s standards and guidelines. Show the
required easement on the amended plans.
Response to Item 8
a) Please find attached to this response a preliminary stormwater CCTV report for the
existing 375mm stormwater pipe that runs through 32 The Cockleshell, Noosaville.
The CCTV commenced at The Cockleshell inlet pit and DrainsKleen have advised that
Page 22
"the survey was abandoned - camera travelled downstream about 7m, before
reaching, root mass which camera could not pass. Attempted reverse survey from
other end but unable to access pit."
The report and photos from DrainsKleen of the root mass is attached for council's
information. Further clarification from DrainsKleen regarding the reverse survey was
sought and the DrainsKleen operator who was on site has advised that: -
"I was unable to locate the downstream pit (unsure if downstream pit exists or is just
cut into another pipe). I am also unable to go from one of the neighbour pits on
Thomas Street as I can't go around corners with robot camera due to risk of
damaging equipment."
Since this survey, Council have advised that, in due course, they will unblock the
stormwater pipe and that no further work by this development is required in order
to address this information request item.
Reviewing the photographs provided in the DrainsKleen report the pipe that is visible
appears to be in a reasonable condition.
b) Please refer to the amended 360 Civil Consulting Drawing No. 03 (Rev 3) which
details the 4m wide drainage easement over the existing council stormwater
infrastructure.
Issue
Engineering plan/s is/are required for the details of the driveway grades and levels and
including a 2.0m wide pathway to confirm compliance with the relevant standard drawings
and for operational works construction.
Information Required Item 9
Provide an engineering plan and longitudinal cross section for the access driveway/s and
crossovers that include 2.0m wide pathway and demonstrates compliance with IPWEA
Standard Drawings RS-049 and RS-050 and have grades ensure a standard vehicle (B99),
entering or leaving the site will not scrape or bottom down.
Response to Item 9
Please refer to the amended 360 Civil Consulting Drawing No. 11 and 12 which detail a
driveway long section and relevant cross section drawings incorporating the 2m wide
footpath and compliance with IPWEA Drawings RS-049 and RS-050.
End of Responses to Information Request Items 7, 8 and 9.
Page 23
I trust that this addresses the engineering issues raised in Council’s Information Request
items 13 and 16. Please do not hesitate to contact me on 0403 862 009 should you have
any queries regarding any of the above matters or the attached drawings.
Yours sincerely,
Beatrice Gibberd
Director and Principal Engineer
360 Civil Consulting Pty Ltd
Attachments:
Skyline Surveyors Contour and Detail Survey Plan No. 7534Det2
360 Civil Consulting Drawings 01 to 12 of 12 (Job No. 2017115)
DrainsKleen Stormwater Pipe Report dated 12/2/18