Skip to the record
Every meeting, every word.

Original source · versioned page text

Response to RFI - Council

Attached to the e-mail MCU17/0563 - Response to Information Request.

Attached to the e-mail Complete - Response to Info Request MCU17 0563.msg.

of 34

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                         LEGEND
                                                                                                                                                                                                             PROPOSED BUILDINGS
                                                                                                                                                                                                                                                                             SEWER RETICULATION NOTES
                                                                                                                                                                                                                                                                             GENERAL NOTES
                                                                                                                                                                                                             PROPOSED DRIVEWAY                                               G1     ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH
                                                                                                                                                                                                                                                                                    EAST QUEENSLAND SEWERAGE CODE SPECIFICATIONS AND STANDARDS.
                                                                                                                                                                            D     D         D    D    D
                                                                                                                                                                                                             EXISTING STORMWATER                                             G2     UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH
                                                                                                                                                                                                             EXISTING SEWER MAIN                                                    THE RELEVANT AUSTRALIAN STANDARDS.
                                                                                                                                                                                                                                                                             G3     THE CONSTRUCTION OF THE SEWERAGE WORK SHOWN ON THIS DRAWING SHALL
                                                                                                                                                                                                             EXISTING WATERMAIN
                                                                                                                                                                                                                                                                                    BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. SEWERAGE
                                                                                                                                                                                                             EXISTING ENERGEX - OVERHEAD                                            WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL NOT BE PERMITTED TO
                                                                                                                                                                                                             EXISTING TELSTRA                                                       CONNECT INTO THE SEQ SERVICE PROVIDER SEWERAGE SYSTEM.
                                                                                                                                                                                                                                                                             G4     ALL WORK ASSOCIATED WITH LIVE SEWERS OR MAINTENANCE HOLES SHALL BE
                                                                                                                                                                                      wat                    PROPOSED WATER METERS
                                                                                                                                                                                                                                                                                    CARRIED OUT BY UNITYWATER AT THE DEVELOPER'S COST.
                               THE COCKLESHELL                                                                                                                                                               EXISTING HCB                                                    G5     ALL PIPES AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE
                                                                                                                                                                                                                                                                                    "ACCEPTED PRODUCTS AND MATERIALS" LIST.
                                                                                                                                                                                                                                                                             G6     EACH NEW ALLOTMENT SHALL BE SERVED BY A DN150 PVC PROPERTY
                                                                                                                                                                                                                                                                                    CONNECTION.
                                                                                                                                                                                                                                                                             G7     PROPERTY CONNECTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN
                                                                                                                                                                                                                                                                                    IN THE DRAWING.
                                                                                                                                                                                                                                                                             G8     PROPERTY CONNECTION BRANCHES SHALL EXTEND INTO THE PROPERTY A
                                                                                                                                                                                                                                                                                    MINIMUM OF 750MM. UNITY WATER REQUIRES MINIMUM EXTENSION OF 500MM
                                                                                                                                                                                                                                                                                    INTO PROPERTY.
                                                                                                                                                                                                                                                                             G9     WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS
                                                                                                                                                                                                                                                                                    NOT EXCEEDING 300MM (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE
                                                                                                                                                                                                                                                                                    COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION
                                                                                                                                                                                                                                                                                    WHEN TESTED IN ACCORDANCE WITH A.S/ 1289 (MODIFIED COMPACTION). TESTING
                                                                                                                                                                                                                                                                                    SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER, IN ALL SUCH CASES
                                                                                                                                                                                                                                                                                    APPROVAL OF CONSTRUCTED SEWERS WILL NOT BE ISSUED BY THE SEQ SERVICE
      4x DN20 WATER METERS AS PER STD                                                                                                                                                                                                                                               PROVIDER UNLESS CERTIFICATES ARE PRODUCED CERTIFYING THAT THE
      DWGS SEQ-WAT 1108-2 & SEQ-WAT 1108-3
                                                                                                                                                                                                                                                                                    REQUIRED COMPACTION HAS BEEN ACHIEVED.
      BY UNITYWATER AT DEVELOPERS                                                                                                                               REMAIN.                                                                                                      G10    WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR STEEPER, BULKHEADS SHALL BE
      EXPENSE. EXISTING WATER METERS TO BE                                                                                                                      SL: 1.90                                                                                                            CONSTRUCTED IN ACCORDANCE WITH THE SEQ SEWER CODE.
      RELOCATED AND EXISITNG ROAD                                                                                                                               IL: -0.39                                                                                                    G11    THE CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING
      CONDUITS TO BE UTILISED FOR NEW
                                                                                                                                                                                                                                                                                    SERVICES WITH RELEVANT AUTHORITIES BEFORE COMMENCING WORKS.
      WATER METERS.
                                                                                                                                                                                                                                                                             G12    SEWERS SHALL BE DISUSED/ABANDONED IN ACCORDANCE WITH PROCEDURES




                                                                                                                                                                                                                                       SEWER MAIN
                                                                                                                                                                                                                                                                                    SET OUT IN THE SEQ SEWER CODE.
                                                                                                                                                                                                                                                                             G13    BENCH MARK AND LEVELS TO AHD.
                               wat               wat   wat   wat
                                                                            t
                                                                         wa
                                                                         t
                                                                         wa




                                                                                                                                                                                                                                                                             WATER RETICULATION NOTES




                                                                                                                                                                                                                            IL -0.21
                                                                                                                                                                                                                                                                             VEGETATION PROTECTION
                                                                                wat




                                                                                                                                                                                                                                                SL 1.93                      A.     TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIOR TO CONSTRUCTION,
                                                                                               EXISTING WATER METERS TO BE                                                                                                                                                          OR REPLACE IF DESTROYED.
                                                                         wa




                                                                                                                                                                                                                                                    IL -0.07    SEWER MAIN
                                                                            t




                                                                                               RELOCATED                                                                                                                                                                     B.     WHEN WORKING WITHIN 4M OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE
                                                                   wat




                                                                                                                                                                                                                            IL -0.20
                              wat                wat   wat   wat
                                                                                                                                                                                                                                                                                    CONSTRUCTED WITH 1.8M BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM
                                                                                                                                                                                                                                                                                    GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND
                                                                                                                                                                                                                                                                                    REMAIN UNTIL COMPLETION.
                                                                                                                                                                                                                                                                             C.     TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS ARE SEVERED
                                                                                                                                                                                                                                                                                    THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT RELEVANT
                                                                                                                                                                                                                                                                                    ARBORIST FOR FURTHER ADVICE.
                                                                                                                                                                                                                                                                             D.     ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.

                                                                                                                                                                                                                                                                             SOIL
                                                                                                                                                                REMAIN.                                                                                                      A.     TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.
                                                                                                                                                                SL: 1.93                                                                                                     B.     CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER SYSTEM.
                                                                                                                                                                IL: -0.20                                                                                                           THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT CONTROLS AROUND STOCKPILES.




                                                                                                                                                                                                                                       SEWER MAIN
                                                                                                                                                                                                                                                                             REHABILITATION
                                                                                                                                                                                                                                                                             A.     PREDISTURBANCE SOIL PROFILES AND COMPACTION LEVELS SHALL BE REINSTATED.
                                                                                                                                                                                                                                                                             B.     PREDISTURBANCE VEGETATION PATTERNS SHALL BE RESTORED.
                                                                                                                                                                                                                                                                             GENERAL NOTES
                                                                                                                                                                                                                                                                             G1     ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH EAST
                                                                                                                                                                                                                                                                                    QUEENSLAND WATER SUPPLY CODE SPECIFICATIONS AND STANDARDS
                                                                                                                                                                                                                                                                             G2     UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH THE
                                                                                                                               UP                    UP                                                                                                                             RELEVANT AUSTRALIAN STANDARDS.
                                                                                                                                                                                                                                                                             G3     ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.
                                                                                                                                                                                                                                                                             G4     COVER ON MAINS FROM PERMANENT LEVEL TO BE AS SHOWN IN SEQ-WAT-1200-2
                                                                                                                                                                                                                                                                             G5     CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE STANDARD DRAWINGS.
                                                                                                                                                                                                                                                                             G6     A WATER METER SUPPLIED AT THE DEVELOPERS COST, IS TO BE INSTALLED AT THE SERVICE
                                                                                                                                                                                                                                                                                    POINT OF EACH LOT IN ACCORDANCE WITH THE SEQ CODE.
                                                                                                                                                                                                                                                                             G7     ALL MATERIALS USED IN THE WORKS SHALL COMPLY WITH THE SEQ-SP'S ACCEPTED PRODUCTS
                                                                                                                                                                                                                                                                                    AND MATERIALS LIST OR BE APPROPRIATELY SHOWN, LISTED AND DEFINED IN THE
                                                                                                                                                                                                                                                                                    ENGINEERING SUBMISSION SO THAT THE ALTERNATIVE PRODUCT OR MATERIAL CAN BE
                                                                                                                                                                                                                                                                                    ASSESSED AND IF APPROPRIATE SEQ-SP.
                                                                                                                                                                                                                                                                             G8     ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS.
                                                                                                                                                                                                                                                                             G9     TEST/CHLORINATION POINTS TO BE INSTALLED IN ACCORDANCE WITH STANDARD DRAWING
                                                                                      ALL ENVIRONMENTAL PROTECTION MEASURES SHOULD                                                                                                                                                  NO.SEQ-WAT-1410-1
                                                                                      BE IMPLEMENTED PRIOR TO ANY CONSTRUCTION WORK,                                                                                                                                         G10    THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN ON THIS DRAWING MUST BE
                                                                                      INCLUDING CLEARING COMMENCING.                                                                                                                                                                SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. WORKS NOT COMPLYING WITH
                                                                                                                                       RP Description                                                                                                                        G11
                                                                                                                                                                                                                                                                                    THIS REQUIREMENT WILL NOT BE PERMITTED TO CONNECT TO THE RETICULATION SYSTEM.
                                                                                                                                                                                                                                                                                    ALL WATERMIAINS SHALL HAVE APPROVED DETECTABLE MARKER TAPE LAID ON TOP OF THE
  CAUTION -                                                                                                                                                                                                                                                                           BEDDING.
  EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT                                                                           Lot 11 RP138550 & Lot 0 BUP6971
  LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE                                                                             30-32 Cockleshell, Noosaville
  PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
  THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
  EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.


    360 CIVIL CONSULTING PTY LTD                                                         No    Date                        Amendment
                                                                                                                                           Design:   J.A.G                       FOR APPROVAL                                CLIENT:                           JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN                                                      JOB NUMBER
                                                                                         A    08-03-18 CHANGES AS PER COUNCIL RFI
                        ABN: 13 609 593 339                                                                                                Drawn:    J.A.G                                                                   PROJECT:                          PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
                                                                                                                                                                                                                                                                                                                                                               2017115
           23 OOGAR STREET, MAROOCHYDORE. QLD 4558                                                                                         Date:     15/07/17
                                                                                                                                                                      BEATRICE GIBBERD RPEQ 14557                            AT:                      30-32 COCKLESHELL, NOOSAVILLE
                                                                                                                                                                                                                                                                                                                                                              DRAWING No:
   Mobile: 0403 862 009  Email: [email protected]                                                                         Checked: B.G.                    DATE:               15/07/2017                                            LOT 11 ON RP138550 & 0 BUP6971
 THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
                                                                                                                                            Datum:   A.H.D.                     Size:                A3                      TITLE: SEWER AND WATER CONNECTION PLAN
                                                                                                                                                                                                                                                                                                                                                               08 of 12
Log in to download the original file

Response to RFI - Council.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.