Response to RFI - Council
Attached to the e-mail MCU17/0563 - Response to Information Request.
Attached to the e-mail Complete - Response to Info Request MCU17 0563.msg.
Response to Item 7
Skyline Surveyors were able to provide additional survey, spot level information, on some
areas of the neighbouring sites. This information is attached for Council’s record. Please
note that in some locations access was not possible and Skyline obtained as best survey
level information as possible. The survey information indicates the following: -
Lot CP BUP7701 appears to have a ridge through the middle of the site with the
western portion of the lot falling to the street and the eastern portion of the lot
falling to the rear of the site. Possible pond may occur in the north-eastern corner of
the proposed development site. In order to alleviate this possible ponding a side
grated pit is proposed in the base level of the retaining wall which will be connected
to the development site’s internal drainage. This stormwater system is shown on
amended 360 Civil Consulting Drawing No. 03 (Rev A).
Lot 6 RP124554 has an internal stormwater pit and overland flow discharges to
Thomas St via the existing driveway.
Lot CP BUP7283 is lower than the development site and the survey levels indicate it
falls towards Thomas St.
Lot CP BUP6949 appears to be slightly lower than the development site and falls
towards the street. The north-eastern corner of Lot CP BUP6949 appears to be
approximately at a similar level to the development site and to address any possible
ponding that may occur in this corner a side grated pit is proposed in the base level
of the retaining wall which will be connected to the development site’s internal
drainage. This stormwater system is shown on amended 360 Civil Consulting
Drawing No. 03 (Rev A).
Issue
Further information and details are required regarding the existing Council’s stormwater
pipeline within Lot 0 BUP 6971 (No 32 The Cockleshell Street).
Information Required Item 8
Provide further information, details and/or amendments to address the following:
a) The proposed development requires filling, increases load on the existing drainage
pipeline on the site and will limit future opportunities for repair and/or upgrade.
Also, there will be an increase in the flows in the pipeline due to the proposed
development. As such, it is considered necessary that CCTV investigation of the
existing pipeline (from The Cockleshell Street to Thomas Street) be carried out by the
applicant determine the condition of the pipeline and report of investigation
submitted to Council prior to issuing the OPW approval.
b) A drainage easement must be created by the applicant over the subject stormwater
pipeline at a width in compliance with Council’s standards and guidelines. Show the
required easement on the amended plans.
Response to Item 8
a) Please find attached to this response a preliminary stormwater CCTV report for the
existing 375mm stormwater pipe that runs through 32 The Cockleshell, Noosaville.
The CCTV commenced at The Cockleshell inlet pit and DrainsKleen have advised that
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.