Original source · versioned page text
Revised architectural plans
Attached to the e-mail Response to Information Request - MCU18/0120, RAL18/0013, OPW18/0197.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 3, section 6. The text section number identifies this passage in the reader.
6
5
4
3
2
1
ARCHITECTS
SINK
DESIGN
UP
SHR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TENANCY 01G.F 110.25 TENANCY 01 MEZZ. 36.45 146.7
1
2
3
4
5
6
7
8
9
58
11
10
12
13
14
15
16
17
UP
TENANCY 02G.F 109.47 TENANCY 02 MEZZ. 36.45 145.92 12 SHR
SINK
12 0.
TENANCY 03G.F 152.87 TENANCY 03 MEZZ. 54.35 207.22 0. 39 5,500 92
92 59
TENANCY 04G.F 109.47 TENANCY 04 MEZZ. 36.45
C O U R T
145.92
2,500 2,500 2,500
PWD
TENANCY 05G.F 110.38 TENANCY 05 MEZZ. 36.45 146.83 SIGN
40
12
TENANCY 06G.F 98.39
1.
98.39
37
TENANCY 07G.F 97.14 97.14
19 TENANCY 38G.F
2,500 2,500 2,500
TENANCY 08G.F 66.37 66.37 G.F : 110.2 m2
12 12
FFL 121,400
0. 0.
TENANCY 09G.F 77.21 77.21
96 86
TENANCY 10G.F 76.79
C O O R O Y
76.79
TENANCY 11G.F 77.82 77.82
TENANCY 39G.F
TENANCY 12G.F 97.9 97.9 REF.CIVIL ENG. G.F : 111.1 m2
TENANCY 13G.F 97.14 97.14 FOR LEVELS FFL 121,400
ONE WAY
5,400 1,100
TENANCY 14G.F 97.14 97.14 1
SIGN
21
TENANCY 15G.F 97.14 97.14 .3 MEZZANINE
7
TENANCY 16G.F 149.63 60 PWD
149.63 DRIVEWAY
12
TENANCY 17G.F 149.64 149.64
1. 6095
SINK
60
UP
TENANCY 18G.F 97.14 SHR
38 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
97.14
2,500 2,500
12 21
TENANCY 19G.F 97.9 97.9
1.
60 . 35
TENANCY 20G.F 110.36 TENANCY 20 MEZZ. 36.45 146.81
Hass Holdings Pty Ltd ATF Quasar Trust
TENANCY 21G.F 109.45 TENANCY 21 MEZZ. 36.45 145.9
122
TENANCY 22G.F 109.45 TENANCY 22 MEZZ. 36.45 145.9 12
TENANCY 23G.F 109.95 TENANCY 23 MEZZ. 36.45 146.4
2.
00
TENANCY 24G.F 109.95 TENANCY 24 MEZZ. 36.45 146.4 DR
TENANCY 25G.F 109.45 TENANCY 25 MEZZ. 36.45 145.9 TO IVEW
122
CIV AY
121
TENANCY 26G.F 111.03 TENANCY 26 MEZZ. 36.45 147.48 IL CRO
.00
EN SS
.98
TENANCY 27G.F 111.14 TENANCY 27 MEZZ. 36.45 147.59
G. OV
12
E R
1.
TENANCY 28G.F 110.22 TENANCY 28 MEZZ. 36.45 146.67
75
PLOT DATE:
DRAWN- JRL
PROJECT NO
TENANCY 29G.F 110.22 TENANCY 29 MEZZ. 36.45 146.67
RL 18003
12
STATUS- D.A -RFI
TENANCY 30G.F 110.22 TENANCY 30 MEZZ. 36.45 146.67 GFA 1.
98
TENANCY 31G.F 110.22 TENANCY 31 MEZZ. 36.45 146.67 AREA GROUND FLOOR ENVELOPES 12
10/09/2018
TENANCY 32G.F 110.22 TENANCY 32 MEZZ. 36.45
1.
146.67 BUILDING A 1,086.08 95
TENANCY 33G.F 110.22 TENANCY 33 MEZZ. 36.45
SHEET SIZE
146.67 BUILDING B 1,653.27 SCALE
TENANCY 34G.F 110.22 TENANCY 34 MEZZ. 36.45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.