Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Shire Planning Scheme
Part 5 Tables of Assessment
5.5 Categories of development and assessment—Material change of use
The following tables identify the categories of development and assessment for development in a zone or a precinct for making a
material change of use.
Table 5.5.15 Environmental Management and Conservation
Use Categories of development and assessment Assessment benchmarks for assessable
development and requirements for accepted
development
Accommodation activities
Caretaker's Code assessment
accommodation If on land owned by the State or Local Government Applicable Local Plan Code
Environmental Management and Conservation
Zone Code
Caretaker's Accommodation, Dwelling Unit and
Rural Workers' Accommodation Code
Works codes
Naturebased tourism Impact assessment
If located on a site owned by the State or Local The planning scheme.
Government.
Business activities
Food and drink outlet Code assessment
If: Applicable Local Plan Code
(a) located on public open space owned by the Environmental Management and Conservation
State or Local Government; Zone Code
(b) having a use area of no more than 10m2; Business Activities Code
incorporating seating for no more than 10 Works codes
(c)
people;
(d) selling only nonalcoholic drinks and light
refreshments;
(e) not including a kitchen or provision for
making or serving meals; and
(f) not involving the removal of existing
vegetation.
Community activities
Emergency services Impact assessment
The planning scheme
Infrastructure activities
Landing Code assessment
Applicable Local Plan Code
Editor’s Note—In addition, an operational works Environmental Management and Conservation
application is required for prescribed tidal works. Zone Code
Waterways Works Code
Telecommunication Impact assessment
**FINAL DRAFT Post Consultation 2019** Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.