Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version

of 347

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                               Acceptable Outcomes
                                                                         AO18AO20.4
                                                                         Waste storage areas, clothes drying areas and external storage
                                                                         areas are screened from the street.

                                                                         AO18AO20.5
                                                                         Letterboxes and detached carports complement the
                                                                         architecture and landscaping of the site.

     Table 6.3.2.3 ­ Criteria for assessment (part)
      Performance Outcomes                                               Acceptable Outcomes
      Environment, heritage and scenic amenity
      PO19PO21                                                           AO19AO21.1
      Development:                                                       For landscape amenity reasons, cut or fill is less than 1.5
      (a)   has minimal impact on the natural landform of the site;      metres in depth relative to the ground level.

      (b)   does not lead to erosion or the transport of sediments off
                                                                       AO19AO21.2
            site; and
                                                                       Development does not result in sediment or other material
      (c)   does not lead to the disturbance of natural features,      including building materials or waste products being deposited
            buildings or structures of cultural heritage significance. or released into the road reserve, stormwater drain or adjacent
                                                                       properties.

                                                                         AO19AO21.3
                                                                         Development on a site adjoining a local heritage place
                                                                         respects the cultural heritage significance of the place by
                                                                         mitigating any adverse impacts on the setting or integrity of the
                                                                         heritage values.

                                                                         Editor’s Note— Local heritage places are identified on the
                                                                         Heritage and Character Areas Overlay maps in Schedule 2.
      PO20PO22                                                           AO20AO22.1
      Development on sloping sites:                                      Buildings and structures are not constructed on land with a
      (a)   is visually responsive to the natural topography and sits    slope greater than 25%.
            within the landscape rather than dominating it; and
                                                                       AO20AO22.2
      (b)   steps down slopes or uses suspended floor
                                                                       WhereOn slopesloping gradients exceed 15%sites, split­level
            construction, minimising cut or fill and avoiding benching
                                                                       buildings, with small floorplates, that step down the slope are
            of the site.
                                                                       used as an alternative to standard single or double storey
                                                                       construction to minimise building bulk and benching of the
                                                                       sites.

                                                                         Editor's note­ refer to Figure 6.9.1A and Figure 6.9.1B

                                                                         AO20AO22.3
                                                                         The distance between the ground level and the lowest part of
                                                                         the floor of the building does not exceed 3 metres.

     Table 6.3.1.3 Criteria for assessment (part)
      Performance Outcomes                                               Acceptable Outcomes
      Earthworks and drainage
      PO21PO23                                                           AO21AO23
      Filling and excavation for operational works do not directly,      Filling and excavation for operational works i s designed and
      indirectly or cumulatively cause adverse impacts external to the   constructed to ensure overland flow and/or flooding is not
      development site by:                                               worsened, impeded, or otherwise diverted to adversely affect
      (a)   causing ponding of water on the site or nearby land;         other properties or downstream environments.

      (b)   increasing flooding, which adversely affects the safety or


**FINAL DRAFT ­ Post Consultation 2019**                                                                                               Page 10 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.