Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version

of 347

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                                 Acceptable Outcomes
      (c)   does not lead to the disturbance of natural features,          AO57.2
            buildings or structures of cultural heritage significance;     Development on a site adjoining a local heritage place
            and                                                            respects the cultural heritage significance of the place by
      (d)   does not visually impact on the cultural heritage              mitigating any adverse impacts on the setting or integrity of the
            significance of the site .                                     heritage values.

                                                                           Editor’s Note— Local heritage places are identified on the
                                                                           Heritage and Character Areas overlay maps in schedule 2.
      PO58
      Uses are conducted in an environmentally responsible manner, No acceptable outcome provided
      operating without deleterious impacts on immediate,
      surrounding or downstream communities, environments or
      environmental processes.

     Table 6.4.2.3 Criteria for assessment (part)
      Performance outcomes                                                 Acceptable outcomes

      Infrastructure
      PO59
      Development is supported by adequate infrastructure and              No acceptable outcome provided
      urban services including reticulated water, sewerage,
      stormwater drainage, sealed roads, pathways and electricity
      and telecommunication infrastructure.
      PO60
      Development does not adversely impact on the continued               No acceptable outcome provided
      operation, viability and maintenance of existing infrastructure or
      compromise the future provision of planned infrastructure.

 Figure 6.4.2.4 ­ Pedestrian Environment ­ Street Awnings Cooroy




 Figure 6.4.2.5 ­ Pedestrian Environment ­ Street Awnings Cooroy & Tewantin



**FINAL DRAFT ­ Post Consultation 2019**                                                                                              Page 14 of 15
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.