Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version

of 347

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
      Performance outcomes                                                 Acceptable Outcomes
      (a)    is directly associated with and subordinate to the industry
             activity on site;
      (b)    demonstrates a demand for 24 hour care of buildings,
             operations, plant or equipment;
      (c)    is not separately let for other accommodation activities;
      (d)    includes no more than one caretaker’s accommodation
             per site;
      (e)    i s andon a site with an area of at least 2,000m2;
      (f)    has a maximum gross floor area of 65m2; and
      (g)    is occupied by at least one person who is employed by
             the primary non­residential use on­site.

      Hofmann Drive Business and Industry Precinct
      PO8                                                                  No acceptable outcome provided
      The nature, design and operation of development and uses is
      compatible with industry activities of the adjoining Medium
      Impact Industry zone, the nearby residential uses and the
      business activities within the Noosa Business Centre.

     Table 6.5.1.3 Criteria for assessment (part)
      Performance outcomes                                                 Acceptable Outcomes

      All activities
      Built form
      Height
      PO9                                                                  AO9.1
      Buildings and other structures—                                      Buildings and structures are no more than 10 metres in
      (a)    are low rise and have a visual bulk and architectural         building height.
             scale consistent with structures on adjoining and nearby
             land;                                                    Factory Street Business and Industry Precinct
                                                                      AO9.2
      (b)    have a maximum building height of 2 storeys and appear
                                                                      Buildings and structures are no more than 8 metres in building
             no more than two storeys from any elevation;
                                                                      height.
      (c)    do not visually dominate the street or surrounding
             spaces;                                                  AO9.3
      (d)    preserve the amenity of surrounding residential          Where development involves excavation ofi s a siterequired,
             development including privacy, views and access to       anythe maximum portion of anthe exposed external wallfaçade
             sunlight; and                                            i sof backfilledthe tobuilding groundcannot level.exceed the
                                                                      respective building heights in AO9.1 and AO9.2
      (e)    respond to the topography of the site; and
      (f)    are well articulated with strong horizontal and vertical      Editor's note—refer to figure AP3­13A
             elements to provide interest to the street.

      Site cover and Gross floor area
      PO10
      Buildings and other roofed structures—                               No acceptable outcome provided
      (a)    are of a scale that is compatible with surrounding
             development;
      (b)    do not present an appearance of bulk to roads or other
             areas in the vicinity of the site;
      (c)    maximise the retention of existing vegetation;
      (d)    allow for soft landscaping between buildings and within
             frontages;
      (e)    allow for adequate area at ground level for staff amenity;
      (f)    facilitates onsite stormwater management and vehicular


**FINAL DRAFT ­ Post Consultation 2019**                                                                                            Page 4 of 12
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.