Performance outcomes Acceptable Outcomes
The use includes onsite amenities for employees in an An onsite recreation area protected from the weather is
attractive setting protected from the weather. provided in a private location, removed from any noisy or
odorous activities, that incorporates:
(a) protection from the weather;
(b) safe access for all staff; and
(c) seating, tables and rubbish bins.
Security fencing
PO35 AO35
All property boundaries are clearly identifiable and suitable day Security fencing no less than 1.8 metres in height encloses the
and night safety and security measures are provided to protect rear and side boundaries of the site and prevents unauthorised
people and property. access to all outdoor parts of the site.
PO36 AO36
Security fencing is in keeping with the surrounding area and Fencing on any frontage is set back an average of 2 metres
does not have an adverse impact upon the appearance of the provided that no part of the fencing is within 1 metre of the
streetscape. property boundary.
Table 6.5.1.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
All activities
Earthworks and Drainage
PO37 AO37
Filling, excavation and retaining structures do not directly, Filling and excavation works are designed and constructed to
indirectly or cumulatively cause adverse impacts external to the ensure overland flow and/or flooding is not worsened,
development site by: impeded, or otherwise diverted to adversely affect other
(a) causing ponding of water on the site or nearby land; properties or downstream environments.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream and downstream; or adversely
affecting the flow of water in any overland flow path.
Table 6.5.1.3 Criteria for assessment (part)
Benchmarks for assessable development including benchmarks for all Industry Precincts (part)
Performance outcomes Acceptable Outcomes
All activities
Environment and Heritage
PO38 AO38.1
Development: Cut or fill is less than 1.5 metres in depth relative to the
(a) has minimal impact on the natural landform of the site; ground level.
(b) does not lead to erosion or the transport of sediments off
AO38.2
site; and
Development does not result in sediment or other material
(c) does not lead to the disturbance of natural features, including building materials or waste products being
buildings or structures of cultural heritage significance. deposited or released into the road reserve, stormwater
drain or adjacent properties.
AO38.3.2
Development on a site adjoining a local heritage place
respects the cultural heritage significance of the place by
mitigating any adverse impacts on the setting or integrity of
the heritage values.
Editor’s Note— Local heritage places are identified on the
**FINAL DRAFT Post Consultation 2019** Page 10 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.