Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version
Plans and drawings: the text below has words only, no drawings.
Performance outcomes Acceptable Outcomes
the requirements of Australian Standard AS1158: Public
Lighting Code unless otherwise specified in this Code.
AO25.2
External lighting of a graduated intensity is provided which
starts at a lower level of brightness at the perimeter of the site
and rises to a higher level at the entrance to buildings or at the
centre of the site.
AO25.3
Lighting is directed onto the site and away from neighbouring
properties.
AO25.4
Vandal-resistant lighting is used in public and publicly
accessible areas.
Staff amenity
PO26 AO26
The use includes on-site amenities for employees in an An on-site recreation area is provided in a private location,
attractive setting protected from the weather. removed from any noisy or odorous activities, and incorporates
—
(a) protection from the weather;
(b) safe access for all staff eating; and
(c) tables and rubbish bins
Security fencing
PO27 AO27
All property boundaries are clearly identifiable and suitable day Security fencing no less than 1.8 metres in height encloses the
and night safety and security measures are provided to protect rear and side boundaries of the site and prevents unauthorised
people and property. access to all outdoor parts of the site involved in the use .
PO28 AO28
Security fencing is in keeping with the surrounding area and Fencing on any frontage is setback an average of 2 metres
does not have an adverse impact upon the appearance of the provided that no part of the fencing is within 1 metres of the
streetscape. property boundary.
Table 6.5.2.3 Benchmarks Criteria for assessable development including Venture Drive
Enterprise Precinct assessment. (part)
Performance outcomes Acceptable Outcomes
All activities
Earthworks and drainage
PO29 AO29
Filling, excavation and retaining structures do not directly, Filling and excavation works are designed and constructed to
indirectly or cumulatively cause adverse impacts external to the ensure overland flow and/or flooding is not worsened,
development site by: impeded, or otherwise diverted to adversely affect other
(a) causing ponding of water on the site or nearby land; properties or downstream environments.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream and downstream; or adversely
affecting the flow of water in any overland flow path.
Table 6.5.2.3 Benchmarks Criteria for assessable development including Venture Drive
Enterprise Precinct assessment. (part)
Performance outcomes Acceptable Outcomes
**FINAL DRAFT - Post Consultation 2019** Page 8 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.