Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version

of 347

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
            (k)   Infrastructure activities such as transport depots, utility installations, telecommunications, substations, major
                  electricity infrastructure and parking stations develop where there is a community need and at a level of
                  provision commensurate with the service demands generated by the use.
            (l)   Limited small scale business uses such as food and drink outlets, shops and periodic markets are ancillary to,
                  and occur in conjunction with, a community use on the same site, and do not compromise the Noosa Shire
                  Centres Hierarchy.
            (m)   Entertainment uses are limited to a theatre and are conducted in conjunction with a community use.
            (n)   Development does not limit the ongoing operation and expansion of an existing community facility or prejudice
                  the establishment of a new facility.
            (o)   Development is supported by transport infrastructure designed to provide and promote safe and efficient public
                  transport use, walking and cycling.
            (p)   Development for infrastructure activities results in a clear demarcation between public and private spaces and
                  protects public safety.
            (q)   Community activities provide an attractive, safe, pedestrian friendly environment and integrate with surrounding
                  land uses.
            (r)   Where appropriate, compatible community and recreation related activities and facilities are co­located.
            (s)   Development is of a scale, appearance and intensity that is compatible with existing and intended development
                  in adjacent zones.
            (t)   Adverse impacts on ecologically important areas, including natural habitats, bushland, wetlands and waterways
                  are avoided or minimised.
            (u)   Development is designed to maximise energy efficiency, water conservation and public and active transport use.
     Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
     outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
     considered as one way to satisfy the corresponding performance outcome.

 Table 6.8.1.3 Criteria for assessment

     Table 6.8.1.3 Criteria for assessment (part)
      Performance outcomes                                             Acceptable outcomes

      Role and function
      PO1
      The Community facilities zone accommodates a range of                No acceptable outcome provided
      community activities, infrastructure activities, special residential
      uses, recreation activities and limited low scale ancillary
      business uses.
      PO2
      Development maintains the ongoing provision and use of           No acceptable outcome provided
      Community Facilities zoned land for community related
      purposes.
      PO3
      Development­                                                     No acceptable outcome provided
      (a)    is consistent with the specific purpose as annotated on
             the zone map; or
      (b)    where the annotated purpose is no longer meeting a
             community need, replaces it with another community
             related use; or
      (c)    where there is no specific purpose annotated on the
             zone map, provides a use consistent with the needs of
             the local community.

      PO4


**FINAL DRAFT ­ Post Consultation 2019**                                                                                       Page 2 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.