Performance outcomes Acceptable Outcomes
Public or semipublic spaces are integrated into the centre's Public and semipublic spaces are located to ensure
pedestrian and cycle networks. pedestrian movement flows through the site and connects to
the pedestrian and cycle networks.
AO25.2
Pedestrian arcades, laneways or enclosed thoroughfares are a
minimum of 6 metres wide, provide a direct line of sight to a
major pedestrian destination (major tenancy, car park, public
place, etc.), and are not dead ends, narrow or circuitous.
Table 6.8.2.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Environment, heritage and scenic amenity
PO26 AO26.1
Development: For landscape amenity reasons, cut or fill is less than 1.5
(a) retains natural vegetation wherever possible; metres in depth relative to the ground level.
(b) has minimal impact on the natural landform of the site;
AO26.2
(c) does not lead to erosion or the transport of sediments off Development does not result in sediment or other material
site; including building materials or waste products being deposited
(d) does not lead to the disturbance of natural features, or released into the road reserve, stormwater drain or adjacent
buildings or structures of cultural heritage significance. properties.
AO26.3
Where there is a nominated building envelope on the lot,
clearing of native vegetation and building works do not extend
beyond the building envelope, except for the purposes of a
driveway access.
AO26.4
Development on a site adjoining a heritage site respects the
cultural heritage significance of the site by mitigating any
adverse impacts on the setting or integrity of the heritage.
Editor’s Note— Heritage sites are identified on the Heritage
and Character Areas overlay maps in schedule 2.
PO27
Uses are conducted in an environmentally responsible manner, No acceptable outcome provided
operating without deleterious impacts on immediate,
surrounding or downstream communities, environments or
environmental processes.
Table 6.8.2.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Infrastructure
PO28
Development is provided with urban services to support the No acceptable outcome provided
needs of the community, including parks, reticulated water,
sewerage, stormwater drainage, sealed roads, pathways,
electricity and telecommunication infrastructure.
PO29
Development does not adversely impact on the continued No acceptable outcome provided
operation, viability and maintenance of existing infrastructure or
compromise the future provision of planned infrastructure.
**FINAL DRAFT Post Consultation 2019** Page 7 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.