Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version
Plans and drawings: the text below has words only, no drawings.
Performance outcomes Acceptable Outcomes
screened.
Table 6.8.3.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Noosa Trail Network
PO16 AO16.1
A comprehensive network of bridle trails and pedestrian and Development includes linkages to or between existing or future
bicycle linkages is established, enhanced and protected components of the Noosa Trail Network, as indicated on the
incorporating road reserves, State forests, Council owned land Strategic Framework Infrastructure Map
and private lands consistent with the lifestyle and outdoor
recreation needs of Noosa Shire’s residents and visitors. AO16.2
Development does not have an adverse impact on the access
functions of the Noosa Trail Network.
**FINAL DRAFT Post Consultation 2019** Page 8 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.