Original source · versioned page text
Approved Plans OPW20-0108
Original PDF page 3, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBE
BE
BE
BE
BE
BE
1.8
1.90
X EXISTING SERVICE TO BE MADE REDUNDANT AND REMOVED
90
0
1.80
0
1.80 1.8
1.
6
48
NOTES
BE
N11 86
8
1.
50 1.
39
28
BE
1.
EX
.5 X
1.
48
4
1 E
1.
1.
BE
4
BE
BE
6
96
1. EXISTING EXTERNAL STRUCTURES AND TREES SHOWN ON THESE DRAWINGS ARE
BE
0
46
59
1.
1.
FEATURES EXISTING PRIOR TO ANY SEDIMENT AND DEMOLITION WORKS.
1.
4
BE
84
BE
86 2. BULK EARTHWORKS SLOPE TO BE MAXIMUM 1V:2H. CONTRACTOR TO ALLOW FOR ANY
1.
22 58 X REQUIRED SHORING OR PROTECTION TO EXISTING SERVICES AND/OR ADJACENT
0
0
BE
7
55
53
.4 5 .5 E
40
68
EX
1.70 .7 .7 PROPERTIES DURING EXCAVATION FOR PROPOSED BULK EARTHWORKS AND ANY
1.
1 1
1.
1.
1.
1.
1
EX
E BE 1
1.
35
BE
BE
B
EX EX EX
BE
62
REQUIRED RETAINING WALLS. CONTRACTOR TO ALLOW TO REINSTATE OR RECTIFY ANY
1.
7
1.60
58
SERVICES AND/OR ADJACENT PROPERTIES DAMAGED DURING EXCAVATION FOR
5
1
5
.8
36
PROPOSED BULK EARTHWORKS AND ANY REQUIRED RETAINING WALLS.
31
EX
EX
1
EX
1.
1.
3. 'LEVEL 1' SUPERVISION IS REQUIRED FOR ALL EARTHWORKS OPERATIONS AND
1
1.
BE
BE
.7
75
1.50
2
CERTIFICATION IS TO BE PROVIDED BY THE NOMINATED GEOTECHNICAL TESTING
8 1.40 AUTHORITY FOR THE FOLLOWING ITEMS:
1.4
- CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS (ie. STRIPPING PROOF
EX
EX
EX
47 ROLLING OF SUBGRADE, etc.) HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE
3 1.
1.
1.
1.
43
EX
45
X DRAWINGS AND EARTHWORKS SPECIFICATION.
E - CERTIFICATION THAT THE CONTROLLED FILL IS SUITABLE FOR SUPPORT OF
CONVENTIONAL HIGH LEVEL FOOTINGS AND HAS A MINIMUM BEARING CAPACITY OF
100kPa.
- CERTIFICATION THAT FILL HAS BEEN PLACED AND COMPACTED TO THE REQUIRED
MINIMUM DENSITY IN ACCORDANCE WITH THE DRAWINGS AND EARTHWORKS
SPECIFICATION.
- CERTIFICATION THAT THE QUALITY OF ANY IMPORTED FILL COMPLIES WITH DRAWINGS
AND THE EARTHWORKS SPECIFICATION REQUIREMENTS.
4. CONTRACTOR TO PROVIDE AN EARTHWORKS METHODOLOGY STATEMENT FOR APPROVAL
BY ACOR PRIOR TO COMMENCING WORK ON SITE. THE METHODOLOGY STATEMENT SHALL
DEMONSTRATE THE TREATMENT OF EXISTING FILL, SITE TRAFFICABILITY AND
INCORPORATION OF REQUIRED SEDIMENT AND EROSION WORKS. CONTRACTOR TO
ALLOW TO ATTEND AN ON SITE PRE-START MEETING AND TO EXCAVATE TEST PITS AS
REQUIRED TO DEMONSTRATE THE APPROPRIATENESS OF THE METHODOLOGY
STATEMENT.
5. CONTRACTOR TO ENSURE PRESERVATION AND AVOID DISTURBANCE OF EXISTING
SURVEY MARKS.
6. UNLESS NOTED AS AN EXISTING TREE TO BE RETAINED ON ARCHITECTURAL DRAWINGS
REMOVE OFF SITE ALL EXISTING TREES AND ALLOW TO DEEP RIP TO REMOVE ANY TREE
ROOTS.
7. UNLESS NOTED AS AN EXISTING TREE TO BE RETAINED ON ARCHITECTURAL DRAWINGS
CONTRACTOR TO ENGAGE A QUALIFIED ARBORIST TO CUTBACK ALL FOLIAGE
OVERHANGING THE BOUNDARY LINE.
8. THE CONTRACTOR TO ENSURE ALL FIRE ANT CONTROLS OR RESTRICTIONS ON THIS SITE
ASSOCIATED REQUIREMENTS HAVE BEEN COMPLIED WITH.
9. REMOVE ALL EXISTING SERVICES AND PIPES AND CAP AT THE SITE BOUNDARY PRIOR TO
UNDERTAKING EARTHWORKS.
10. REFER TO ARCHITECTURAL DRAWINGS FOR EXISTING BUILDING DEMOLITION DETAILS.
11. PROPOSED FUEL TANKS - REFER ARCHITECTS PLANS FOR DETAILS.
12. PROPOSED ENVIROTANK REFER ENVIROTANK DWG 1119/90/P01
NOOSA COUNCIL
NOTE: ENGINEER'S CERTIFICATION
APPROVED PLAN 1. ALL BATTERS TO BE 1 IN 4 U.N.O.
This drawing has been assigned an electronic code that
signifies the drawing has been checked and approved by:
OPW20/0108 13 OCT 2020 2. ALL BATTER STEEPTER THAN 1:4 TO BE STABILIZED
AS PER GEOTECHNICAL ENGINEERS SPECIFICATIONS
NAME: SHANE SUFFOLK
0 4 8 12m
RPEQ No: 9330 SCALE 1:200 @ A1
SIGNED:
C COPYRIGHT of this design and plan is the property of ACOR Consultants (Qld) Pty Ltd, ACN 126 011 087 ABN 18 126 011 087, all rights reserved. It must not be used, modified, reproduced or
FOR APPROVAL
copied wholly or in part without written permission from ACOR Consultants (Qld) Pty Ltd. ACOR Consultants is a trademark licensed to ACOR Consultants (Qld) Pty Ltd by ACOR Consultants Pty Ltd.
Client ARCHITECT Project Drawing Title
D RFI RE-ISSUE 01/09/20 BVZ SS ACOR Consultants (Qld) Pty Ltd BULK EARTHWORKS LAYOUT PLAN
C RFI ISSUE 26/08/20 BVZ SS North WESSEL PETROLEUM LEVEL 4, 43 PEEL STR
PROPOSED BP SERVICE CENTRE
B FOR APPROVAL 30/06/20 BVZ SS South Brisbane QLD 4101
A FOR INFORMATION 12/06/20 BVZ SS T +61 7 3844 5900 NOOSAVILLE Drawn Date Scale A1 Q.A. Check Date
P1 FOR INFORMATION 27/03/20 BVZ SS BVZ MAR 2020 1:200 SS -
Issue Description Date Drawn Approved MARY STR & WEYBA ROAD Designed Project No. Dwg. No. Issue
PHONE : PHONE : ENGINEERS MANAGERS INFRASTRUCTURE PLANNERS DEVELOPMENT CONSULTANTS NOOSAVILLE, QLD 4566 BVZ BR190571 C2.01 D
Document Set ID: 21249393
Version: 1, Version Date: 29/09/2020 Print Date: 13 October 2020, 1:39 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.