Minor Change - Planning Report
e) minimising structures e) the boat lifting device is not metres.
above the water located on the jetty head;
e) The Sea Pen is not located at
level; and
the head of the existing jetty.
f) ensure the structural f) the outermost projection of
f) The Sea Pen is setback 1.9
integrity of the works any boatlifting device is
metres from the closest
is maintained and setback a minimum of 1
property boundary.
not compromised; metre from the prolongation
and of the boundaries.
g) avoid a secondary
AO21.2 Complies
boat lifting device
(floating dock) that Only one primary boat lifting The proposal consists of one
exceeds 8m². device and one secondary small primary boat lifting device.
device (floating dock) per jetty.
The small secondary floating
dock is no greater than 8m² and
purpose designed for personal
watercraft such as jet skis,
kayaks, paddleboards etc.
AO21.3 Not Applicable
A shared jetty contains only one The existing jetty is for the sole
boat lifting device on either side use of 18 Topsails Place and is not
of the jetty. shared.
AO21.4 Complies
The structure may be securely The Sea Pen will be securely
attached, excluding roped, attached to the existing Jetty in a
chains and straps, to an existing similar method to the approved
jetty where a structural Pneumatic Boat Storage Device
engineer's report for the design (OPW16/0011). The design of the
is provided certifying that the Sea Pen is comparable to Figure
jetty is structurally capable of 9.4.9.3L - Floating Pontoon as it is
supporting the boat lifting a low-profile boat storage device
device. which provides dry mooring of
marine craft at water level.
(Refer to Figures 9.4.9.3H –
9.4.9.3J for examples of boat
lifting devices).
AO21.5 Not Applicable
For twin jetty structures with The existing jetty is a single jetty.
central boat lifting devices-
a) are only permitted in the
absence of any jetties;
b) the structure does not
exceed 10 metres in length;
c) the structure does not
exceed 7 metres in width;
and
d) each jetty is a maximum of
1.5 metre wide.
The proposed boat lifting device complies with the relevant Performance and Acceptable Outcomes
prescribed within the Waterways Works Code. The proposed Sea Pen does not adversely impact upon
the function of the existing jetty, nor the use of the jetties located adjacent to the subject site.
RG Strategic Town Planning Report – OPW Application 9