Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Davidson Peregian 28-11-24

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (15.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

                                                                                             8M HEIGHT BLANKET - NO EXCEEDANCE




CONCEPT & INTERIORS BY:   CONSTRUCTION DOCUMENTATION BY:
                                                                                                                                                                                                          CLIENT:   DAMIEN DAVIDSON BUILDERS           PROJECT:
                                                           CHRIS CLOUT DESIGN PTY LTD          QBCC: 1127508   GENERAL NOTES:
                                                           OFFICE 1/20 DUKE STREET,                                                                                                                   SITE ADDRESS: 66 PEREGIAN ESPLANADE, 1 MARTIN ST & 23 AVOCET PDE, PEREGIAN BEACH
                                                                                                               Use written dimensions only. DO NOT scale drawings. Contractors to verify all
                                                           SUNSHINE BEACH QLD 4567                             dimensions on site prior to commencing works. Site location in accordance
                                                           E: [email protected]                     with engineers details. These drawings are to be read in conjunction with           DRAWING TITLE: HEIGHT BLANKET
                                                                                                               engineers design and details, the accompanying building specification and
                                                           P: (07) 54748 107                                   schedule of finishes. If in doubt, please request clarification. DO NOT            DATE: 28-11-24     SCALE:          @ A0          DRAWN BY: C,CLOUT
                                                           www.chriscloutdesign.com.au                         ASSUME.                                                                                                                                                                   C8.0
                                                                                                                                                                                               ISSUE: PRELIMINARY CONCEPT
Log in to download the original file

DAVIDSON PEREGIAN 28-11-24.pdf · 15.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.