Skip to the record
Accept no substitutions.

Council archive · source document

Proposal Plans · MCU19/0008.02

of 21

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
   22 A R A K O O N C R E S C E NT S U N S H I N E BE A C H - NO T E S
   GENERAL NOTES                                                                                                                                                      LEGEND                                                                                           DRAWING LIST

   COPYRIGHT: Drawings remain the Copyright of the                               CONCEALMENT OF SERVICES: All services shall be concealed in                          AC         AC unit                                                                               001    NOTES
   Architect: Robinson Architects                                                walls or ducts. Where services are exposed they must be confirmed by                 B          Basin                                                                                 002    MATERIALS
                                                                                 the Architect on site prior to installation unless noted otherwise.
                                                                                                                                                                      CONC       Concrete
   ALL WORKS shall be carried out in accordance with the Building Code
                                                                                                                                                                      CT         Cooktop                                                                               003    PERSPECTIVES
   of Australia, Australian Standards, Local Council requirements, QDC           LICENSED TRADESPERSONS: All services to be installed by licensed
   guidelines and all other relevant by laws and authorities. In particular      tradespersons in accordance with local authority and with current                    DP         Downpipe                                                                              004    PERSPECTIVES
   refer Australian standards:                                                   manufacturers specifications.                                                        DR         Dryer                                                                                 005    PERSPECTIVES
   · site preparation A.S. 3798                                                                                                                                       F          Fridge
   · concrete construction A.S. 2870                                             ROOF DRAINAGE: All downpipes to be located as noted on the
                                                                                                                                                                      FG         Fixed Glass                                                                           006    BUILDING HEIGHT COMPLIANCE
   · timber construction and details A.S. 1684.2                                 drawings and sizes as scheduled. Allow to connect to in-ground storm
                                                                                                                                                                      FP         Fireplace
   · steelwork AS 4100, AS 1111 and A.S. 1112                                    water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for
   . termite protection BCA and A.S. 3660.1                                      I.O.'s at each change of direction and at 6000mm centres.                            FT#        Floor Tile, Refer Schedule                                                            100    SITE PLAN
   . artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680                                                                                            GU#        Gutter Type, Refer Schedule                                                           105    LOWER GROUND PLAN
   . fire safety BCA part 3.7                                                    SITE DISCHARGE: All stormwater and sanitary plumbing to be                           HR#        Handrail Balustrade, Refer Schedule                                                   106    GROUND FLOOR PLAN
   . smoke alarms BCA part 3.7.2 and A.S. 3786                                   connected to existing council system in accordance with the
                                                                                                                                                                      HWD        Hardwood                                                                              107    FIRST FLOOR PLAN
   . glazing BCA part 3.6 and A.S. 1288 and A.S. 2047                            requirements of the relevant local authority.
                                                                                                                                                                      HWS        Hot Water System
   APPROVAL: No building work shall be undertaken prior to Building              WATER LINES: All hot water lines shall be fully insulated. All domestic              PWD        Powder Room                                                                           205    NORTH ELEVATION
   Approval by a registered Certifier.                                           hot water to basins, showers and baths to have maximum temperature                   SC         Structural Column                                                                     206    EAST ELEVATION
                                                                                 of 50°C. Allow to supply and install tempering valves where required,                S          Sink                                                                                  207    SOUTH ELEVATION
   CONSULTANTS: Drawings shall be read in conjunction with engineers             as nominated in the BCA and relevant standards.
                                                                                                                                                                      SH         Shower                                                                                208    WEST ELEVATION
   drawings and computations. All structure to Engineers design.
                                                                                                                                                                      TD         Tumble Dryer
   Hydraulic sizing and design to hydraulic engineers requirements. All          STAIR AND BALUSTRADES: All stair and balustrades shall comply
   drawings to be co-ordinated with consultant documentation prior to            with part 3.9 of the BCA. Steps to be provided where fall from dwelling              WC         Water Closet                                                                          305    SECTION S01
   construction.                                                                 exceeds 190mm.                                                                       WF         Wine Fridge                                                                           306    SECTION S02
                                                                                                                                                                      WM         Washing Machine                                                                       307    SECTION S03
   DIMENSIONS: Do not scale off drawings - use figured dimensions only.          ALL PRODUCTS: To be installed to manufacturers requirements and
   Contractor shall verify all dimensions on site prior to construction. Any     to be in accordance with manufacturers requirements for suitable
                                                                                                                                                                                                                                                                       1200   3D VIEW
   discrepancies or errors shall be referred to architect and client prior to    exposure levels.
   installation / manufacture of any works. Confirm levels & RL's on site                                                                                                                                                                                              1201   3D VIEW
   prior to commencement of work.                                                PROPRIETARY ITEMS: Identification of a proprietary item does not
                                                                                 necessarily imply exclusive preference for the item so identified, but
   SETOUT: Contractor to confirm exact siting and orientation prior to           indicates the necessary properties of the item. If alternatives are
   construction setout. All building setout and confirmation of setbacks         proposed, submit proposed alternatives and include samples, available
   and height to be carried out by a Licensed Surveyor. No footing, or wall      technical information, reasons for proposed substitutions and cost.
   to encroach the title boundary.
                                                                                 JOINERY ITEMS SHALL INCLUDE: Manufactured casework items,
   TERMITE PROTECTION: Termite protection by means of termimesh                  including: kitchen cabinets and cupboards; bathroom cabinets; robes.
   s.s. mesh hysical barrier in accordance with A.S. 3660.1/2000 and
   installed in strict accordance with current manufacturers specifications.     SANITARY COMPARTMENTS: Provide removable hinges to doors of
                                                                                 sanitary compartments to comply with BCA 3.8.3.3 and be readily
   STRUCTURAL STEEL: Unless noted otherwise all exposed                          removable from outside unless there is a clear space of at least
   structural steel, anchor bolts and other attachments shall be hot dip         1200mm b/w closet pan within the sanitary compartment and the
   galvanised. A cold gal painted finish shall be applied to any field           nearest part of the doorway.
   welding to existing or new steelwork. All steel work cast in concrete
   footings or slab shall have a bitumen finish applied to full extent of cast   APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and
   in concrete steel. Check all dimensions on site prior to fabrication of       equipment locations on site and with joiner. installation and final
   steelwork.                                                                    connection by the contractor.

   RETAINING WALLS: All retaining walls to structural engineers details.         WEATHERSTRIPS: All external doors to contain weather stripping
   Provide rubble backfill and ag drainage to all retaining walls. Builder to    (type to be confirmed by Architect prior to manufacture)
   provide tanking where required.
                                                                                 DOCUMENTATION: The contractor shall carry out works in
   SLAB & FOOTINGS: All slabs and footings to structural engineers               accordance with the signed drawings and schedules and anything
   details. A polyethylene moisture barrier shall be lapped 200mm and            reasonable inferred, and with the Conditions of Contract, and in
   fully taped under any habitable concrete slab and shall extend 100mm          accordance with the directions and to the satisfaction of the Architect,
   onto the perimeter footing.                                                   whose interpretation of the contract documents shall be final. The
                                                                                 drawings and specifications/schedules shall be considered
   ARTICULATION JOINTS: Provide articulation joints to comply with               complementary, and any work and/or materials absent from one
   "Cement and Concrete Association Construction Note TN9".                      but present or implied in the other shall be furnished
   EROSION CONTROLS: All building works to comply with local                     as if they were present in both.
   authorities Erosion and sediment control standards.
   WATERPROOFING: All wet areas and walls to be waterproofed in                  FINAL CERTIFICATE: At completion of work, Builder to obtain and
   accordance with the BCA 3.8 & AS 3740. Builder to provide certificate         supply a Certificate of Classification from a Building Certifier.
   of installation and compliance.
                                                                                 POOL: Contractor to confirm heights/depths/steps and
                                                                                 plumbing/electrical requirements and locations prior to construction

                                                                                                                                                                                                                                                                                                           DA ISSUE
Use figured dimensions in preference to scale.
All dimensions to be verified and checked on
                                                                        ISSUE                 REV
                                                                                                                                                            ROBINSON               CLIENT                       PROJECT                 DRAWING TITLE                                        REVISION      DRAWING NUMBER

site. These designs, drawings, specifications
                                                                        SKETCH DESIGN         SD-1       06/10/2022 03/11/2022                              ARCHITECTS             KEITH & JEANNETTE            LOT 793RP48111          NOTES                                                DA-2          001
and the copyright thereof are the property of                           DA DESIGN APPROVAL    DA-2       09/12/2022 14/12/2022                              67 MEMORIAL DRIVE      INCE                         22 Arakoon Cres
Robinson Architects Pty Ltd and must not be
                                                                                                                                                            EUMUNDI Q 4562                                      Sunshine Beach Q 4567                                                        DATE          SCALE
used, retained or copied without the written
authority of Robinson Architects Pty Ltd.                                                                                                                   Ph. (07) 5442 8566                                                          DA ISSUE © ROBINSON ARCHITECTS 2022                  14/12/2022            (A3 Paper)

Used in these records

About this file

File size
10.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Proposal Plans.pdf · 10.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.