Council archive · source document
09/0943 - Op works - Jetty & Boatlift [As Published] · 142009.943
“INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
Building &/or operational works assessable
against a planning scheme’
1. Nature of work that requires assessment against a planning scheme:
[] Building work - Complete Table A Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
© [7] Roadworks [J Stormwater () Water infrastructure (L) Sewerage infrastructure
: [] Landscaping ([] Earthworks [[] Drainage Works (] Signage
{[] Clearing vegetation under the planning scheme {X] Other - Specify below
New timber jetty and aluminium trailer style boat storage device
(ii) What type of approval is being sought? (NOTE: /f you have indicated multiple operationat warks in question (i) above and your answers lo this
question would be different for different operational work, it may be more appropriate to provide these details in an atlachment to this form)
[X] Development Permit [_] Preliminary approval (J Both (Specity below)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
Ex] No —_[_] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
aot)
KX] No —_[[] Yes - Complete Table B(a)
© 2. What is the dollar value of this operational work? (i.e. the total value including GST, materials and labour! |$ 20,000
3. Confirm that the following mandatory information accompanies this application
*«-Confirmation:of
=
sFelodgement'
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fill)
i] Confirmed over the counter
OFFICE USE ONLY
Date Received Reference Numbers ‘|
Advice for completing Part E
General advice
je Part A must also be completed for all (DAS development applications.
je The applicant is responsible for answering ail questions fully and correctly, unless following a response there is a stalement to go directly to another question
Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0943 - Op works - Jetty & Boatlift [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.