Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published] · 142008.383.02

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                             Officer:          Denis Wallace
                                             Direct Telephone: (07) 5449 5179
                                             Response Address: Locked Bag 72
                                                               Sunshine Coast Mail Centre QLD 4560
                                             Email:            [email protected]
                                             Our Reference:    2008/383
                                             Your Reference:
8 January 2010

Sunshine Coast Regional Council
Denis Shaw
Locked Bag 72
SUNSHINE COAST MAIL CENTRE QLD 4560



Dear Madam

                          Change to an Existing Approval
                                  Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 5 January 2010 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:              2008/383
    Street address:              Claude Batten Drive & Haul Road Noosa Heads
    Real property description:   Lot 114 MCH 839107 & Lot 115 MCH 839107
    Planning Scheme:             The Noosa Plan

2        DECISION DETAILS

Council on 8 January 2009 decided to issue the following type of approval:-
        Development Permit for Operational Works - Prescribed Tidal Works - Access Jetty; Coastal
         Development Pumping facility
In relation to the request to make a change to the existing approval, Council on 5 January 2010
decided to:
A.       Approve a change to the development approval with changes to condition 1
B.       Include amended Concurrence Agency conditions
C.       Issue a Change to Development Approval

3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.




                                                                                        Page 1 of 19
Full text of the other 18 pages

Page 2

                                                                                        2008/383



4    ASSESSMENT MANAGER CONDITIONS

1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table and as
     may be amended by these conditions and annotations made to the plans: -
       Plan         /      Rev.   Plan / Document Name                        Date
       Document No.
       33030-0-01          2      Noosa Beach Nourishment Sands               7 July 2009
                                  Recycle Automated System Pump
                                  Station G.A. Sh 1 of 2
       33030-0-02          2      Noosa Beach Nourishment Sands               12 July 2009
                                  Recycle Automated System Pump
                                  Station Elevations. Sh 2 of 2
       33030-0-03          2      Noosa Beach Nourishment Sands               11 July 2009
                                  Recycle Automated System Pump
                                  Station Site Plan
       33030-0-04          2      Noosa Beach Nourishment Sands               13 July 2009
                                  Recycle Automated System Sea Water
                                  Supply Pump Station G.A.
       33030-0-05          2      Noosa Beach Nourishment Sands               13 July 2009
                                  Recycle Automated System Sea Water
                                  System Site Plan
       33030-8-01          2      Noosa Beach Nourishment Sands               13 July 2009
                                  Recycle Automated System Transfer
                                  Pipeline Alignment
       11456-1B            B      Proposed Sand Recycling Trial –             August 2004
                                  Noosa Spit Beach to Noosa Main
                                  Beach Noosa Heads – Site Plan and
                                  Details
       -                   -      Noosa Beach Nourishment Sands               -
                                  Recycle Automated System Land
                                  Development Contours

     and as may be amended by these conditions.
2.   Suitable signage shall be placed at the perimeter of the work areas advising that the area is
     not accessible for members of the public. The signs shall be placed prior to construction works
     commencing and permanently affixed to the inlet jetty and pump station upon completion of
     the works. The design of the signs shall be approved by Council’s Manager – Works Planning
     prior to the erection of the signs.
3.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use.
4.   The clearing or disturbance of existing vegetation shall be limited to the proposed works area
     and any necessary access ways extending from the existing road formation to the works area.
5.   Any areas of removed or disturbed vegetation remaining after the works shall be replaced with
     suitable local native vegetation approved by Council. The revegetation shall be carried out in
     accordance with Council’s Planning Scheme Policy No 3 Landscaping Plants & Guidelines.
6.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
     site. Site control measures such as silt fencing, controlled gravel access to the site and
     controlled disposal of waste, will be necessary.


                                                                                     Page 2 of 19

Page 3

                                                                                        2008/383

7.    Certification by a Registered Professional Engineer of Queensland shall be submitted to
      Council stating that the works have been constructed in accordance with best practice
      methods, is in accordance with Coastal Protection and Management Act 1995 (specifically the
      engineering previsions of the Coastal Protection and Other Legislation Amendment Regulation
      (No.1) 2005, Schedule 4A – IDAS Code for development applications for prescribed tidal
      work) and is structurally sound.
8.    This approval or its conditions do not constitute a ruling on structural safety and the applicant
      must make their own arrangements to ensure adequacy of design and work. Furthermore, the
      approval does not warrant that associated plans and specifications have been checked in
      detail, nor does it absolve the owner of the land from complying with all the conditions of this
      approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
      statutory regulations in the execution and/or performance of the works. The Council does not
      accept any responsibility for the accuracy of any plans and specifications as approved.
9.    The Development Permit for a Operational Works lapses if the use has not happened by 9
      January 2011, unless an application to extend the currency is approved by Council.

5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency        Referral Address

 Tidal work that is          Concurrence         Department of          Ecoaccess Customer
 prescribed tidal work                           Environment &          Service Unit,
 other than in a canal                           Resource               PO Box 15155,
                                                 Management             CITY EAST QLD 4002

 Tidal work that is          Concurrence         Queensland             MacArthur Avenue East
 prescribed tidal work                           Transport –            PINKENBA Qld 4008
                                                 Maritime Services
                                                 Qld

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.         Rev.    Plan / Document Name                      Date
 33030-0-01                  2       Noosa Beach Nourishment Sands             7 July 2009
                                     Recycle Automated System Pump
                                     Station G.A. Sh 1 of 2
 33030-0-02                  2       Noosa Beach Nourishment Sands             12 July 2009
                                     Recycle Automated System Pump
                                     Station Elevations. Sh 2 of 2
 33030-0-03                  2       Noosa Beach Nourishment Sands             11 July 2009
                                     Recycle Automated System Pump
                                     Station Site Plan
 33030-0-04                  2       Noosa Beach Nourishment Sands             13 July 2009
                                     Recycle Automated System Sea Water
                                     Supply Pump Station G.A.
 33030-0-05                  2       Noosa Beach Nourishment Sands             13 July 2009
                                     Recycle Automated System Sea Water
                                     System Site Plan

                                                                                     Page 3 of 19

Page 4

                                                                                          2008/383


 33030-8-01                  2       Noosa Beach Nourishment Sands               13 July 2009
                                     Recycle Automated System Transfer
                                     Pipeline Alignment
 11456-1B                    B       Proposed Sand Recycling Trial –             August 2004
                                     Noosa Spit Beach to Noosa Main
                                     Beach Noosa Heads – Site Plan and
                                     Details
 -                           -       Noosa Beach Nourishment Sands               -
                                     Recycle Automated System Land
                                     Development Contours

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a Change to an Existing Approval Application under the Integrated
      Planning Act must be made. Amended plans clearly indicating the changes must be lodged
      with this application along with the appropriate fees
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Not applicable

11    SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable

12    SUBMISSIONS
Not applicable.
                                                                                      Page 4 of 19

Page 5

                                                                                     2008/383


13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.


Decision Notice History
8 January 2009 -               Original Decision Notice.
5 January 2010 -               Approve a change to the
                               development approval with
                               changes to condition 1 and
                               amend Concurrence
                               Agency conditions


Yours faithfully,



Denis Wallace
Senior Development Planner

Cc:

Department of Environment & Resource Management
Ecoaccess Customer Service Unit,
PO Box 15155,
CITY EAST QLD 4002

Queensland Transport – Maritime Services Qld
MacArthur Avenue East
PINKENBA Qld 4008




                                                                                  Page 5 of 19

Page 6

                                         2008/383


Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                      Page 6 of 19

Page 7

   2008/383




Page 7 of 19


[OCR of page images]
2008/383

 

Amended Concurrence Agency Response - |IPCC01117608

 

DERM Ref Number
- IPCC01117608

3. Currency period

This approval will lapse unless substantially started within the currency penod/s set by the

Assessment Manager OR the standard currency penods stated in section 3 5 21 of the Integrated
Planning Act 1997 applying to each aspect of development in this approval AND/OR the following
currency periods applying to aspects of development in this approval

This approval will lapse unless substantially started within two years

4. The approved plans

The approved plans and/or documents for this approval are

 

 

 

 

 

 

 

 

 

 

 

Pian/Document No, Plan/Document Name Date
33030-8-01 Noosa Beach Nounshment Sands Recycle Revision 2
Automated System - Transfer Pipeline Alignment dated 13/07/09
33030-0-05 Noosa Beach Nounshment Sands Recycle Revision 2
Automated System — Sea Water System Ste Plan | dated 13/07/09
Noosa Beach Nourishment Sands Recycle
33030-0-04 . Revision 2
pm System - Sea Water Supply Pump dated 13/07/09
33030-0-03 Noosa Beach Nounshment Sands Recycle Revision 2
Automated System = Purnp Sin Site Plan dated 11/07/09
33030-0-02 Noosa Beach Nounshment Sands Recycle Revision 2
Automated System — Pump Staton G A Sh 2 of 2 dated 12/07/09
Noosa Beach Nounshment Sands Recycle
4 : Revision 2
33030-0-0 a System Transfer - Pump Stabon GA Sh | 4.1 samziog
Proposed Sand Recycling Tnal — Noosa Sprt Beach
11456-18 to Noosa Mamn Beach Noosa Heads — Ste Plan and | Revision B
Details
NA Noosa Main Beach Nounshment Sand Recycle NA
Automated System Land Development Contours

 

 

 

 

Page 2 of 7 + AF060109

Department of Environment and Resource Management

Page 7 of 19

Page 8

   2008/383




Page 8 of 19


[OCR of page images]
2008/383

 

Amended Concurrence Agency Response - IPCC01117608

 

Conditions of the Development Approval

Agency Interest: General

1 The works must be undertaken generally in accordance wath the approved plans listed under part four
(4) of thes notice

2 If thes development approval lapses and the permanent sand shifting facility has not been constructed,
Sunshine Coast Regional Council must ensure that the temporary facility and all associated pipes are
removed within 20 days of the permit lapsing

3. The sand shifting activity and/or associated activities must not cause any disturbance to any items of
cultural hentage in the area If any items of cultural heritage are discovered during construcbon or
operation, works must cease immediately and the appropnate authoribes must be noted

4 The Sunshine Coast Regional Council must ensure that all appropriate measures are taken to prevent
polluton as a result of silt runoff, of and grease spills from machinery, concrete truck washout and
alike Concrete agitator wash out shall only be conducted in a specified area to facilitate the removal
of waste concrete from the area to landfill Wastewater from cleaning equipment shall not be
discharged directly or indirectly to any waters

5 Your attenton 1s drawn to the provisions of the Environmental Protection Act 1994 and the general
environmental duty of care not to pollute the environment or create a contaminated ste when undertaking
works

Agency Interest: Coastal
Sand Shifting Activity

6 The sand shifting actvity and/or associated actrvibes must not cause adverse impacts on the natural coastal
processes of the region

7 Amaximum volume of 60,000m3 of sand may be removed from the borrowed areas within any twelve (12)
month penod, provided it is consistent with the net natural littoral drift rates and does not affect the other
approval conditions

8 Sands to be only extracted from area labelled ‘Area of Sand Extraction’ and only deposited in area labelled
“Area of Sand deposition’ as shown in Figure 1 (Drawing 33020-8-01 E)

9 While the sand shifter can be operated anywhere within the 200m x 55m area depicted east of the nver
mouth traning wall, its locaton shall always be sufficiently seaward to provide sufficient beach width
50 @$ not to have detrimental impacts on the dune and vegetabon system The sand shifter is not to
cause any long term recession of the beach profile

10 No sand ss to be ramoved from the coastal dune system
11 No sand shall be permanently removed from the active beach system

Page 4 of 8+ AFORD100 Department of Enveronment and Resource Management

Page 8 of 19

Page 9

   2008/383




Page 9 of 19


[OCR of page images]
2008/383

 

 

Amended Concurrence Agency Response - |PCC01117608

 

5. Codes for self-assessable development

Any self-assessable development for an environmentally relevant actrvity conducted in conjunction
with thes approval, must comply with the relevant code of environmental compliance

6. Assessment Manager Responsibilities

Please note that it is a requrement under Sections 3 5 15 and 3 5 17 of the Integrated Planning Act 1997
that a copy of the final Decision Notice (which includes DERM's concurrence response) for this application
sssued by the Sunshine Coast Regional Counc, be forwarded to each referral agency Therefore could you
please send a signed hardcopy to DERM'’s Ecoaccess Customer Service Unit, PO Box 15155 CITY EAST
4002 and an electrome copy to eco access@derm gid gov au

In addition, the State's Native Title Work Procedures indicate that responsibility for assessment of natrve title
issues for an IDAS application rest with the Assessment Manager Therefore in this mstance, DERM has not
provided a notification to native title parties

If you require more information, please contact Jessica Johnson, the Project Manager, on the telephone
number listed below

 

 

 

 

 

Yours sincerely
[
(0/iz[o4.
Signature Date
Ben Sale Enquiries
Manager (Sunshine Coast) ES - Reg Serv - Bne North - Sunshine Coast -
Brisbane North Region DERM
Environmental Services South PO Box 168 COTTON TREE QLD 4558

Department of Environment and Resource Management Phone: (07) 5459 6141
Fax (07) 5443 9927

 

Page 3 of 8 - AF080109 Department of Environment and Resource Management

Page 9 of 19

 

Page 10

    2008/383




Page 10 of 19


[OCR of page images]
2008/383

 

12

13

14

16

Amended Concurrence Agency Response - |PCC01117608

The sand shifting activity and/or associated activites must not result in changes to hydrodynamics, tdal
pnsm and tdal regime of the Noosa River

All praccal and reasonable measures must be taken to prevent the occurrence of by-catch associated vath
the operation of the sand shifting activity and/or associated activites

The sand shifter is not to operate below a depth of 8 metres below the natural surface profile or the
depth required to maintain stabelity of the Noosa River Training wall (whichever is the lesser)

‘Sand shail be placed uniformly along the section of beach to be nounshed using the discharge outlets
available and in accordance with the specified plans

All deposited sand shail be clean and free of silt, clay, organic matenal or any other deleterious
substance and must be of a grain size compatible with the existing beach sand

Acid Sulfate Souls

17

18

19

For all works within the Noosa Estuary that may potentially expose acid sulphate soils, an acid sulfate
sod mvestigation must be performed in accordance with the QASSIT Guidelines (Ahern C R_, Ahern

MR and Powell B , 1998, Guxdelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in
Queensland 1998, Queensland Department of Natural Resources and Mines) or subsequent versions
thereof, prior to commencing the construction works

Construction and operation of the sand shefting facility must comply with the latest edition of the
Environmental Protection Agency's Instructions for the Treatment and Management of Acid Sulfate
Sars, 2001

Acid sulfate soils must be managed such that contaminants are not directly or ndwecily released, as a
result of the construction and operation of the sand shifting activity and/or associated activities, to any
waters or the bed and banks of any waters

Vegetation and Dune Stabudity

20
21

22

23
24

All works must be undertaken in a manner that minwmises damage to the vegetation adjacent to the site

The vadth of cleanng of the vegetation for access and construction works |s to be minimised and mature
trees are to be retained where possible by minor realignment of the works

All organically ennched sand removed from the top layer (topsoil) within the proposed development
areas must be stockpiled separately prior to excavabon, and respread over the development area after
re-profiling as part of the revegetation works

All areas of exposed sand are to be stabilised against wind erosion dunng the construcbon penod

All matenal excavated from a dunal system for construction works must be placed, levelled and
stabilised against wind erosion on the seaward side of the building or structure

Any erosion or loss of sand surrounding the works that occurs because of changes caused by the works
must be rectified

 

 

Page 5 of 8 » AFO@0109 Department of Environment and Resource Management

Page 10 of 19

Page 11

    2008/383




Page 11 of 19


[OCR of page images]
2008/383

 

Amended Concurrence Agency Response - IPCC01117608

 

26 Immediately following construction of the works
The dunal areas are to be re-profiled to achieve the natural profile of the system,

* Disturbed areas are to be stabilised agamst wind erosion and rainwater run-off erosion and
revegetated through the re-establishment of the endemic native plants common to the site,

« The revegetated area Is to be fenced off where necessary to prevent pedestrian access across
the area, and

* Riparian vegetation ts to be re-instated adjacent to the access jetty where exashng vegetation is
disturbed and where existing pump infrastructure is removed

27 The drainage of process overflow waters and stormwater assocated vith the sand shefter pumping
station must not cause erosion of the dune or beach system

Site Access

28 Access to the permanent pumping station site shall be along the designated vehicle access track, and
the surrounding dunal vegetation must be maintamed to the satisfaction of the Department of
Environment and Resource Management

Coastal Management

29 The sand shefting activity and/or associated activilies must not cause any long-term maintenance and
management implications

Erosion Prone Areas and Coastal Hazards

30 The Sunshine Coast Regional Council shall be responsible for the removal of the works, if in the opinion
of the Department of Environment and Resource Management, the works causes unacceptable adverse
effects or suffers the effects of erosion to the extent that t becomes a danger to the public

31 Should the sand shefting facility and associated infrastructure be damaged as a result of sea erosion the
Sunshine Coast Regional Council shall be responsible for the removal of all debris from the beach

32 In the event of damage or loss by of the works by sea erosion, the Sunshine Coast Regeonal Council
must submit another applicaton if reconstruction of the works is proposed

33 Awnritten undertaking from the Sunshine Coast Regional Council ts to be recerved by the Department of
Environment and Resource Management agreeing that the works will be considered to be an
expendable structure and that no protection works, other than beach nounshment will be carned out in
the event of an erosion threat

 

Page 6 of 8+ AFOSO109 Department of Environment and Resource Management

Page 11 of 19

 

Page 12

    2008/383




Page 12 of 19


[OCR of page images]
2008/383

 

; Amended Concurrence Agency Response - IPCC01117608

Monitoring

4 The Sunshine Coast Regional Council is to develop a Sand Shifting Management Plan which details the
operational and monitonng strategies consistent with the conditions of this approval The Plan shall
include a monitoring strategy for ensuring that the pumping regume is consistent with the natural net
Ittoral deft rates As a minemum, the plan should mclude monthly monitoring of the vegetation line

35 Details of the quantity of sand recycled are to be sent to the Department of Environment and Resource
Management on a monthly basis

36 Within 12 months of establishment and at 5 yearly mtervals or sooner f the Department of Enveonment
and Resource Management has reasonable concerns that the local or regional natural coastal
processes are being adversely affected, a program of research must be undertaken to determine the
long-term impacts of the sand shifting operation on the depositional! charactenstics of Noosa Estuary In
particular, the Department of Enveonment and Resource Management seeks to determine whether the
operation of the sand shifting facility vathin the active system undermines the supply of sediment to the
estuary The Department of Environment and Resource Management must be consulted in the
development of the research program

37 Recording of any faunal by-catch assocated with the sand shifting actrvrty must be undertaken on a
daily basis during days of operation Records of by-catch must be provided to the Department of
Environment and Resource Management bi-annually for the first year of operaton

38 Beach and dune profiling ts to be undertaken every 6 months for the first 5 years and annually thereafter
from the sand extracbon area at Noosa Spit Beach to the sand depossbon area at Noosa Main Beach
One profiling event must be a detated survey (survey intervals of <50m) and include profiling of the surf
zone (minsmum 5m water depth) The other profiling event must include 4 profiles of the beach zone
(two at Noosa Sprt Beach and two at Noosa Main Beach) Both surveys must be provided to the
Department of Environment and Resource Management upon completion

 

Page 7 of 6 « AF080109 . Department of Environment and Resource Management

Page 12 of 19

Page 13

    2008/383




Page 13 of 19


[OCR of page images]
2008/383

 

Amended Concurrence Agency Response - IPCC01117608

Figure 1: Drawing 33020-8-01 E (Areas of sand extraction and deposition).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

52a
me |e)
8
END OF CONDITIONS
Page 6 of 8 « AF080109 Department of Environment and Resource Management

Page 13 of 19

Page 14

    2008/383




Page 14 of 19


[OCR of page images]
2008/383

 

scr CORFESH Ea Queensland
Wenn ’. Government

30032864
19 November 2009 - Maritime Safety
ie. Queensland
slat
Denis Shaw Queensland Transport
Coastal & Canals Manager
Sunshine Coast Regional Council
Locked Bag 72

Sunshine Coast Mail Centre
Attn: Penny Houston

 

Dear Sir

Tidal Works — Request for comments — Change to an existing approval for a sand recycling
system at Noosa Spit.

Thank you for your letter of 12 November 2009 about your application to change the existing
approval for a sand recycling system at the location mentioned above.

As a concurrence agency under the Jntegrated Planning Act 1997 and Coastal Protection
Management Act 1995, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are addressed.

1. The construction must comply with Slurry Systems Marine Pty Ltd, Dws 33030-0-01 to 5 Rev 2
and 33030-8-0] Rev 2, attached to your letter dated 12 November 2009.

2. In respect to the seawater pump access jetty the conditions numbers 2-11 in our letter dated 06
March 2008 still apply.

3. In respect to the inclusion at the sand shutter within the development application, the conditions
continued in our letter dated 25 June 2003 still apply.

4. The contractor must complete construction within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Mertime Safety Queensland Our ref 710V01645(3) P40662 E3464 F20
Marine Operations (Brisbane) Your ref
Macarthur Avenue East Enquines Glenn Hale
Pinkerbs Quaensiand 4008 Telephone +61 7 3860 3556
Fecsimie +61 7 38603671
ABN 13 200 330 520 Website www.msq.qld.gov.au

Email = gien.n.haingiensa gid ow. au

Page 14 of 19

Page 15

    2008/383




Page 15 of 19


[OCR of page images]
2008/383

 

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

Yours sincerely

 

Jt , Captain Richard C Johnson
Regional Harbour Master (Brisbane)

Maritime Safety Queensiand Page 2 of2

Page 15 of 19

Page 16

    2008/383




Page 16 of 19


[OCR of page images]
2008/383

 

\ Queensland .

  

' Government
’

6 March 2008 maine Safty ~

Kris Body: Qurensiand Transport
Noosa Council

PO Bex [41

Tewantin Qld 4565

n
Dear Kris
Tidal Works ~ Request for comments — Seawater Supply Pump Access Jetty — Noosa Split.

Thank you tor your letter of 25 February 2(H1% about your application to constenct a jetty at Lhe
lceation mentioned above.

AS a concurrence agency under the fnegraied Plunniny Aer 1997 and Cunstal Protection
Management Act /995, Maritime Safety Queensland has na objection w dre proposal provided the
following navigation and marine satety conditions are addressed,

1. The consoruction must comply with Noosa Council, Drswing No 33020 R, 33020-0044,
attached to your letter dated 25 February 2008,

2. You, or your agent, must advise the Harbour Master Ue commencement date, proposed
timetable, and contractor contact details at least oo weeks hélore commencing construction.

3. Yew, ur your agent, must issuc any notices the Elarbour Master requires,

4, You, or your agent, must advise (re Harbour Master when you have completed construction.

5. You or your agent must supply. install and inaintain any navigation lights, buoys, marks or signs
the Harbor Master considers necessary. Any lighls, buoys, marks and signs must accord with

Maritime Safety Queensland's requircments, The jetty shal] be fitted with warning signs for a
walter inluke — ny ywimming or mooring,

 

6. Yau must udequatyly light ihe stescturc, The contractor must position all lighting so it dacs not
cause a risk to the suft navigation of other vessels. Any freestanding piles must have retry
reflective Lape Gted.

 

Malate Salety Qleers awd - * . ‘ . “. Curret! 7901 E82 PSTH-4 B25218 F2
Mama Gperitons (Brebane) ‘Your red ;
WocArthur Avert: East Encunies Glenn Hale
Pingante Quasnsierd 4C08 Totophons +61 7 B58) 3558
. . Faesimils +61 7 60 571
ABN 13 200 320 20 Website Wwww.insg.qk.gav.au

Email Bkinatasgsg.cie.goe sn

Page 16 of 19

Page 17

    2008/383




Page 17 of 19


[OCR of page images]
2008/383

 

a

iw

 

7. You, Or your agent, must remove Arty absleuclions and debris cncountered during construction,
and dispose of them, a3 the Harbour Master requires.

& Any ships and equipment you or your agent use must comply with the Zrurspor! Operations
(Murine Safety) Act 1994, the Transport Gperarions (Mavine Safety) Kegutation 2004 and the
Transport Operations (Marine Pollution} Act 1995,

9 ‘This facility is uot to be used for the mooring of vessels,

10. Any ships, plant or equipment that deploy anchors in open waters, and in and near shipping
* channels must have une anchors marked with yellow buoys and fitted with F] Yellow fighls.

11, ‘The sentractor must complete construction within ovo years trom the date of approval, If
 sonstruction is net completed, you will need additional or amended comments [rom the Regional
Ilarbour Master. ,

Maritime Safely Queensland dogs not noed to be further consulted if all of the above conditions ane
met,

The above conditions must he inelucler! in your application to the assessment cunmayer, 1

Yours sincerely

COLL

Captain Richard C Johnson

Lt Regioual Hurbour Master (Brisbane)

Mortirns Safty Quoenatond Page 2 uF2

Page 17 of 19

Page 18

                                                                                                           2008/383


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                    Page 18 of 19

Page 19

                                                                                                  2008/383

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                             Page 19 of 19

Used in these records

About this file

File size
562 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published].pdf · 562 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗