Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published] · 142008.383.02
2008/383 Page 17 of 19 [OCR of page images] 2008/383 a iw 7. You, Or your agent, must remove Arty absleuclions and debris cncountered during construction, and dispose of them, a3 the Harbour Master requires. & Any ships and equipment you or your agent use must comply with the Zrurspor! Operations (Murine Safety) Act 1994, the Transport Gperarions (Mavine Safety) Kegutation 2004 and the Transport Operations (Marine Pollution} Act 1995, 9 ‘This facility is uot to be used for the mooring of vessels, 10. Any ships, plant or equipment that deploy anchors in open waters, and in and near shipping * channels must have une anchors marked with yellow buoys and fitted with F] Yellow fighls. 11, ‘The sentractor must complete construction within ovo years trom the date of approval, If sonstruction is net completed, you will need additional or amended comments [rom the Regional Ilarbour Master. , Maritime Safely Queensland dogs not noed to be further consulted if all of the above conditions ane met, The above conditions must he inelucler! in your application to the assessment cunmayer, 1 Yours sincerely COLL Captain Richard C Johnson Lt Regioual Hurbour Master (Brisbane) Mortirns Safty Quoenatond Page 2 uF2 Page 17 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 562 KB (small file)
- File type
No other editions are linked here.