   2008/383




Page 8 of 19


[OCR of page images]
2008/383

 

Amended Concurrence Agency Response - IPCC01117608

 

Conditions of the Development Approval

Agency Interest: General

1 The works must be undertaken generally in accordance wath the approved plans listed under part four
(4) of thes notice

2 If thes development approval lapses and the permanent sand shifting facility has not been constructed,
Sunshine Coast Regional Council must ensure that the temporary facility and all associated pipes are
removed within 20 days of the permit lapsing

3. The sand shifting activity and/or associated activities must not cause any disturbance to any items of
cultural hentage in the area If any items of cultural heritage are discovered during construcbon or
operation, works must cease immediately and the appropnate authoribes must be noted

4 The Sunshine Coast Regional Council must ensure that all appropriate measures are taken to prevent
polluton as a result of silt runoff, of and grease spills from machinery, concrete truck washout and
alike Concrete agitator wash out shall only be conducted in a specified area to facilitate the removal
of waste concrete from the area to landfill Wastewater from cleaning equipment shall not be
discharged directly or indirectly to any waters

5 Your attenton 1s drawn to the provisions of the Environmental Protection Act 1994 and the general
environmental duty of care not to pollute the environment or create a contaminated ste when undertaking
works

Agency Interest: Coastal
Sand Shifting Activity

6 The sand shifting actvity and/or associated actrvibes must not cause adverse impacts on the natural coastal
processes of the region

7 Amaximum volume of 60,000m3 of sand may be removed from the borrowed areas within any twelve (12)
month penod, provided it is consistent with the net natural littoral drift rates and does not affect the other
approval conditions

8 Sands to be only extracted from area labelled ‘Area of Sand Extraction’ and only deposited in area labelled
“Area of Sand deposition’ as shown in Figure 1 (Drawing 33020-8-01 E)

9 While the sand shifter can be operated anywhere within the 200m x 55m area depicted east of the nver
mouth traning wall, its locaton shall always be sufficiently seaward to provide sufficient beach width
50 @$ not to have detrimental impacts on the dune and vegetabon system The sand shifter is not to
cause any long term recession of the beach profile

10 No sand ss to be ramoved from the coastal dune system
11 No sand shall be permanently removed from the active beach system

Page 4 of 8+ AFORD100 Department of Enveronment and Resource Management

Page 8 of 19

Used in these records

About this file

File size
562 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published].pdf · 562 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.