Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published] · 142008.383.02
2008/383 Page 8 of 19 [OCR of page images] 2008/383 Amended Concurrence Agency Response - IPCC01117608 Conditions of the Development Approval Agency Interest: General 1 The works must be undertaken generally in accordance wath the approved plans listed under part four (4) of thes notice 2 If thes development approval lapses and the permanent sand shifting facility has not been constructed, Sunshine Coast Regional Council must ensure that the temporary facility and all associated pipes are removed within 20 days of the permit lapsing 3. The sand shifting activity and/or associated activities must not cause any disturbance to any items of cultural hentage in the area If any items of cultural heritage are discovered during construcbon or operation, works must cease immediately and the appropnate authoribes must be noted 4 The Sunshine Coast Regional Council must ensure that all appropriate measures are taken to prevent polluton as a result of silt runoff, of and grease spills from machinery, concrete truck washout and alike Concrete agitator wash out shall only be conducted in a specified area to facilitate the removal of waste concrete from the area to landfill Wastewater from cleaning equipment shall not be discharged directly or indirectly to any waters 5 Your attenton 1s drawn to the provisions of the Environmental Protection Act 1994 and the general environmental duty of care not to pollute the environment or create a contaminated ste when undertaking works Agency Interest: Coastal Sand Shifting Activity 6 The sand shifting actvity and/or associated actrvibes must not cause adverse impacts on the natural coastal processes of the region 7 Amaximum volume of 60,000m3 of sand may be removed from the borrowed areas within any twelve (12) month penod, provided it is consistent with the net natural littoral drift rates and does not affect the other approval conditions 8 Sands to be only extracted from area labelled ‘Area of Sand Extraction’ and only deposited in area labelled “Area of Sand deposition’ as shown in Figure 1 (Drawing 33020-8-01 E) 9 While the sand shifter can be operated anywhere within the 200m x 55m area depicted east of the nver mouth traning wall, its locaton shall always be sufficiently seaward to provide sufficient beach width 50 @$ not to have detrimental impacts on the dune and vegetabon system The sand shifter is not to cause any long term recession of the beach profile 10 No sand ss to be ramoved from the coastal dune system 11 No sand shall be permanently removed from the active beach system Page 4 of 8+ AFORD100 Department of Enveronment and Resource Management Page 8 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 562 KB (small file)
- File type
No other editions are linked here.