Original source · versioned page text
Operational Works Application OPW24/0021 - DA Form 1 & Pics - 45 Lawnville Rd, Cooroy
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m2)
Existing or Width (m) Length (m) Purpose of the easement? (e g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 - Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
□ Road work □ Stormwater □ Water infrastructure
□ Drainage work □ Earthworks □ Sewage infrastructure
□ Landscaping □ Signage □ Clearing vegetation
0 Other - please specify:
□ Yes - specify number of new lots:
El No
PART 4 - ASSESSMENT MANAGER DETAILS
|tXK»K
□ Yes - a copy of the decision notice is attached to this development application
□ The local government is taken to have agreed to the superseded planning scheme request - relevant documents
! attached
fflNo
PART 5 - REFERRAL DETAILS
EJ No, there are no referral requirements relevant to any development aspects identified in this development
application - proceed to Part 6
Matters requiring referral to the Chief Executive of the Planning Act 2016:
□ Clearing native vegetation
Page 5
DA Form 1 - Development application details
Version 1.4— 15 December 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.