Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
Notice
Concurrence and Advice Agency Response
This notice is issued by the Department of Environment and Resource Management pursuant to section 287 and section
292 of the Sustainable Planning Act 2009 (“the Act”).
Chief Executive Officer cc. Sunshine Coast Regional Council
Sunshine Coast Regional Council C/- International Coastal Management Pty Ltd
Locked Bag 72 PO Box 306
SUNSHINE COAST MAIL CENTRE QLD 4560 MAIN BEACH LPO QLD 4217
. .
Attention: Mark Lewis Attention: Bobbie Corbett
DERM references: IC0511NAM0009_SC14225_461372
Assessment Manager ref.: OPW11/0116
1. Application details
Date properly referred to DERM: 9 May 2011
Development approval for: Development permit for carrying out Operational Works and
Material Change of Use for an Environmentally Relevant Activity
Aspects of development: Various aspects of development – Acid sulfate soils. Sustainable
Planning Regulation 2009 – Schedule 7, table 3, item 3
Operational work – Tidal works, or development in a coastal
management district. Sustainable Planning Regulation 2009 –
Schedule 7, table 2, item 13
Material change of use – Environmentally relevant activities.
Sustainable Planning Regulation 2009 – Schedule 7, table 2, item 1
Development descriptions: Prescribed Tidal Works – Erosion protection works, including
submerged channel closure, wall and groyne, dredging and
nourishment.
Property/Location description: Lot 114 MCH839107, Park and Public Toilets on Claude Batten
Drive, Noosa Heads
2. The Chief Executive, Department of Environment and Resource Management (DERM), concurrence
agency response for the concurrence agency referral jurisdiction for the aspect of development involved
with the application the subject of this Notice is to tell the assessment manager as follows:
2.1 Operational work – Tidal works, or development in a coastal management district. Sustainable
Planning Regulation 2009 – Schedule 7, table 2, item 13
– Conditions must attach to any development approval, and those conditions are attached to this
Notice.
Page 1 of 3 • 091217
Department of Environment and Resource Management
www.derm.qld.gov.au ABN 46 640 294 485
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 28 pages
Page 2
Notice
Concurrence and Advice Agency Response
2.2 Material change of use – Environmentally relevant activities. Sustainable Planning Regulation
2009 – Schedule 7, table 2, item 1
– Conditions must attach to any development approval, and those conditions are attached to this
Notice.
3. The Chief Executive, Department of Environment and Resource Management (DERM), advice agency
response for the advice agency referral jurisdiction for the aspect of development involved with the
application the subject of this Notice is to recommend to the assessment manager as follows:
3.1 Various aspects of development – Acid sulfate soils. Sustainable Planning Regulation 2009 –
Schedule 7, table 3, item 3.
- Conditions that should attach to any development approval, and those conditions are attached
to this Notice.
4. General advice to assessment manager
Pursuant to sections 334 and 363 of the Act, a copy of a decision notice or negotiated decision notice
issued by the assessment manager must be forwarded to DERM as a referral agency for the relevant
application at PO Box 573, Nambour QLD 4560.
The State’s Native Title Work Procedures provide that responsibility for assessment of native title issues
for an IDAS application rests with the assessment manager. Therefore, DERM as a referral agency for
the relevant application has not provided notification to native title parties.
5. Additional information for applicants
Aboriginal Cultural Heritage Act 2003
DERM also takes this opportunity to advise the Assessment Manager of the responsibilities of
applicants under the Aboriginal Cultural Heritage Act 2003. The Assessment Manager may wish to
include this information as an Advisory Note on the Decision Notice issued for the application.
Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must
take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural
heritage (the "cultural heritage duty of care"). Maximum penalties for breaching the duty of care are
$1,000,000 for a corporation and $100,000 for an individual.
Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if they are acting in
accordance with cultural heritage duty of care guidelines gazetted under the Aboriginal Cultural Heritage
Act 2003, available on the DERM website, or in accordance with an agreement with the Aboriginal party
for the area or a cultural heritage management plan approved under part 7 of the Aboriginal Cultural
Heritage Act 2003.
Applicants are also encouraged to undertake a search of the Aboriginal Cultural Heritage Database and
the Aboriginal Cultural Heritage Register, administered by the Cultural Heritage Coordination Unit,
DERM. Application forms to undertake a free search of the Cultural Heritage Register and the Database
may be obtained by contacting the Cultural Heritage Coordination Unit on (07) 3239 3647 or on the
DERM website www.derm.qld.gov.au/cultural_heritage
Page 2 of 3 • 091217 Department of Environment and Resource Management
Page 3
Notice
Concurrence and Advice Agency Response
Delegate Enquiries:
Department of Environment and Resource Management
Centenary Square Building,
Currie Street, Nambour. QLD 4560
PO Box 573, Nambour. QLD 4560
Telephone + 61 7 5451 2256
Daniel Leo Facsimile + 61 7 5451 2260
Senior Planning Officer Email [email protected]
Regional Planning and Coordination (Nambour) Website www.derm.qld.gov.au
Planning and Assessment – SEQ
21 June 2011
Attachment – DERM Concurrence Referral Agency Response (Tidal Works)
– DERM Concurrence Referral Agency Response (Environmentally Relevant Activity)
– DERM Advice Referral Agency Response (Acid Sulfate Soils)
Page 3 of 3 • 091217 Department of Environment and Resource Management
Page 4
Department of Environment and Resource Management Sustainable Planning Act 2009 DERM Permit ‘number: SPCC01881911 Date application received: Permit type: Date of decision: Decision: Relevant laws and policies: ‘| Jurisdiction(s): Assessment manager reference: ML001:VZT:OPW1 1/0116 9 May 2011 Concurrence agency response 16 June 2011 Approved subject to conditions that must attach to any development approval Coastal Protection and Management Act 1995 and any related statutory instruments and subordinate legislation Operational work - Tidal works, or development in a coastal management district - Sustainable Planning Regulation 2009 Schedule 7, table 2, item 13 Development Description(s) Property/Location Development Operational work - Tidal works or development in a Noosa River Spit, Noosa USL adjacent to coastal management district, which is erosion protection River, Noosa Heads QLD Lot 114 on works involving beach nourishment and construction MCH839107 of submerged sandbag seawalls and groynes at Noosa River spit in the vicinity of Doggy Beach. 1 Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by legislation administered by the Department of Environment and Resource Management. Page 1 of 11 * 091217 Department of Environment and Resource Management WY. Queensland Govern ment www.derm.qid.gov.au ABN 46 640 294 485
Page 5
DERM Permit number: SPCC01881911 TABLE 1: Plans and Documents Plan/Document No. Plan/Document Name Date NRS-RE-001 Water Allocation Area 22 Dec 2010 NRS-001 Long-term Strategy 10 Feb 2011 NRS-002 : Proposed Stage 1 Works 14 Feb 2011 NRS-003 Submerged Closure Layout 10 Feb 2011 NRS-004 Submerged Closure Typical Cross-section 14 Feb 2011 NRS-005 Wall and Groyne Layout 10 Feb 2011 NRS-006 Groyne Typical X-Section 14 Feb 2011 NRS-007 Wall Typical Cross-Section 14 Feb 2011 NRS-010 Nourishment Typical Profile _ 10 Feb 2011 Response to development application Policy 2,2.2 of the South-east Queensland Regional Coastal Management Plan 2006 states that undeveloped erosion prone areas are to be maintained, protected and enhanced as a coastal buffer zone and for other coastal management purposes. The proposed erosion protection works are designed as a defensive action to stabilise the Noosa River Spit, in particular the area known as doggy beach from further erosion impacts, and therefore reduce the risk of loss or damage to existing development within Noosa River. Reason(s) for inclusion of conditions In accordance with section 289 of the Sustainable Planning Act 2009, the reason(s) for inclusion of conditions Stated in this permit required by the concurrence agency response for the application are as follows. The conditions are included pursuant to section 106 of the Coastal Protection and Management Act 1995. Page 2 of 11" 091217 Department of Environment and Resource Management
Page 6
DERM Permit number: SPCC01881911 This development approval authorises the works, it does not authorise environmental harm unless a concurrence agency condition within this development approval explicitly authorises that harm. Where there is no condition, or the development approval is silent on a matter, the lack of a condition or silence shall not be construed as authorising harm. : Ben Sale Delegate . Delegate, Chief Executive administering the Coastal Protection and Management Act. 1995 Department of Environment and Resource Management 14 June 2011 Page 3 of 11 "091217. Department of Environment and Resource Management
Page 7
DERM Permit number: SPCC01881911 CONDITIONS Schedule A - General Limitations of permit At. This development permit authorises the Stage 1 works for a period of 12 months from date of approval that is for erosion protection works within Noosa River on USL adjacent to Lot 114 on Plan MCH839107 indicated in Table 1. Plans & Documents. A2. All works are to be constructed in accordance with the drawings and specifications indicated in Table 1. Plans & Documents provided with the application, or any subsequent endorsed amendments to those plans unless the plan conflicts with a condition of this approval in which case the conditions take precedence. A3. The works must not have any direct or indirect impact upon the environmental values or water quality objectives for the coastal management district of Noosa River. Ad. The chief executive administering the Coastal Protection and Management Act 1995 may order the works to be removed or modified within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: ‘(a) create a navigation hazard or other danger to the public; or (b) cause erosion or land degradation; or : (c) are unstable; or . (d) have not been constructed according to the plans (Table 1 Plans and Documents). AS. Should the works result in adverse impacts to the environment or coastal management, the Sunshine Coast Regional Council or its successor is responsible at their expense for rectification works and where necessary and\or the removal of the works causing the impacts. AG. Should the work structures (wall and groynes) associated with these works become damaged or dislodged as a result of vandalism, coastal processes or storm tide inundation, the Sunshine Coast Regional Council or its successor is responsible at their expense for the repair or removal of the works as soon as practicable. Prevent environmental harm AZ, The operator must ensure that environmental harm is not caused by these operational works except where specifically permitted by a condition of this development permit. A8. Notwithstanding any other condition of this development approval, this development approval does not authorise any release of contaminants which causes or is likely to cause environmental nuisance of harm beyond the boundaries of the licensed place. Display of development approval AQ. A copy of this development approval must be kept in a location readily accessible to personnel carrying out the works at all times and all site personnel must be made aware of the conditions of this approval. Records A10. All records required by this permit must be kept for a minimum of five years. Att. The operator must maintain a record of the works carried out (specifying the boundaries of the works area by GPS coordinates). Page 4 of 11° 091217 Department of Environment and Resource Management
Page 8
DERM Permit number: SPCC01881911 A12. All records required to be kept by a condition of this development approval must be provided to an authorised person or the administering authority upon request. Maintenance of measures, plant and equipment A13. The operator must: (a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this development permit; (b) maintain and calibrate such measures, plant and equipment in an efficient condition and keep records of the maintenance; (c) operate such measures, plant and equipment in an efficient manner. Calibration At4. All instruments and devices used for the measurement or monitoring of any parameter under any condition of this development approval must be calibrated and appropriately operated and maintained. Site Based Management Plan (SBMP) A15. The operator must implement a site based management plan prior to commencement of these works. The SBMP must identify all causes of environmental harm, including but not limited to the actual and potential release of any contaminants, the nature of the environmental harm and the actions that will be taken to prevent environmental harm being caused. The SBMP must be made available to the administering authority when requested. A16. _ . The SBMP must address the following matters: (a) environmental commitments - a commitment by senior management to achieve specified and relevant environmental goals; (b) identification of environmental issues and potential impacts; . (c) control measures for.routine operations to minimise likelihood of environmental harm; (d) contingency plans and emergency procedures for non-routine situations (including but not limited to the emergency protocol when spills occur and the amount of neutralising agent to be kept onsite); (e) organisational structure and responsibility; (f) effective communication; (g) monitoring of contaminant releases; (h) conducting environmental impact assessments; (i) staff training; (j) record keeping; and (k) periodic review of environmental performance and continual improvement. A17. The SBMP must be made available to the administering authority when requested. A18. The SBMP must not be implemented or amended in a way that contravenes any condition of this development permit. Notification of incidents A19. As soon as practicable after becoming aware of any incident of environmental harm (including a . reasonable suspicion that environmental harmhas or is likely to have occurred) which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with the conditions of this development approval, the holder of this development approval must notify the administering authority of the release by telephone (Pollution Hotline 1300 130 372) or local office (07) 54596 132. Page 5 of 11 "091217 Department of Environment and Resource Management
Page 9
DERM Permit number: SPCC0188191 1 A20. The notification of incidents as required by condition A19 must include but not be limited to the following information: (a) the holder of the development approval; (b) the location of the incident; (c) the number of the development approval; (d) the name and telephone number of the designated contact person; (e) the time of the incident; (f) the time the holder of the development approval became aware of the incident; (g) the suspected cause of the incident; (h) the environmental harm and or environmental nuisance caused, threatened, or suspected to be caused by the incident; and (i) actions taken to prevent a further incident and mitigate any environmental harm and or environmental nuisance caused by the incident. A21. Not more than 14 days following the initial notification of an incident, the holder of this development approval must provide written advice of the information supplied in accordance with condition * number A20 in addition to: (a) proposed actions to prevent a recurrence of the emergency or incident; (b) outcomes of actions taken at the time to prevent or minimise environmental harm and or environmental nuisance, and (c) the results of any environmental monitoring performed. Notification before Commencement A22, At least 10 business days prior to work commencing, the administering authority must be ' informed of at least the following: (a) planned timetable of the works for the program/year including proposed staging of the work activities and hours of operation; (b) the contact details for the person/s made available during the hours of operation who can appropriately address any complaints. END OF CONDITIONS FOR SCHEDULE A Schedule B - Operational Work B1. A report from a Registered Professional Engineer of Queensland (RPEQ) must be submitted to the administering authority within three months from the date of completion of the works, certifying that: (a) The works (including any other associated works) has been constructed in accordance with the plans and documents (Table 1 — Plans and Documents); and (b) The works are structurally adequate for its intended location and anticipated usage. B2. Disturbance to acid sulphate soils (ASS) is to be avoided as far as practicable, should the works disturb ASS the works must comply with Instructions for the Treatment and Management of Acid Sulfate Soils, 2001, Queensland Government, or any updates as they become available. B3. All temporary works associated with the construction of the erosion protection works are to be removed from the site at the completion of the works and all wastes shall be collected from the site by the permittee and disposed of at a licensed waste facility. B4. The holder of this development approval must remove all concrete.path sections displaced by erosion along the foreshore and within the tidal prism of Noosa River Spit (Doggy Beach) to ensure adverse effects to the natural environment are avoided, mitigated or remedied. B65. Any erosion or loss of sand surrounding the works that occurs because of changes caused by the works must be rectified. Page 6 of 11 * 091217 . Department of Environment and Resource Management
Page 10
B6. DERM Permit number: SPCC01881911 During and following construction of the works, any areas disturbed by the works are to be stabilised against wind erosion, rainwater run-off erosion and revegetated with endemic native species commonly found on adjacent areas or present prior to disturbance. END OF CONDITIONS FOR SCHEDULE B Schedule C - Monitoring C1. C2. C3. C4. C5. C6. The operator must implement a monitoring plan from the commencement of these works. The monitoring plan must achieve the following outcomes, but not limited to: (a) long-term ecological impacts associated with the works; ' (b) effectiveness of the erosion protection works; (b) compliance with the conditions of this development permit; (c) operations are adjusted in response to. monitoring results to ensure compliance with development permit conditions ‘ Quarterly monitoring of the works must be undertaken and records kept of its performance during the works and for the life of the works, or until otherwise advised by the administering authority that such monitoring can cease. Water quality monitoring must be undertaken daily and regularly (at fixed intervals or at evenly spaced intervals) at suitable locations within the works area and records kept of all relevant observations. The holder of this development approval must notify the administering authority in writing within 14 days of any monitoring result which indicates any failure of the works or exceedance of any licence limit. The operator of this development permit must monitor the visual impact of the operational works area on the environment by undertaking the following when works are being carried out; (a) Daily observations and recording of the extent of any turbidity plume caused by the works; and (b) Daily observations and recording of extent and period of time turbidity persists. END OF CONDITIONS FOR SCHEDULE C Schedule D - Water Di. D2. D3. D4, All reasonable and practicable measures must be taken to minimise any increase in turbidity of the waters or the release of contaminants as a result of these works to any waters. In the event that the administering authority requires water quality sampling, all determinations of the quality of the samples must be: (a) made in accordance with methods prescribed in the latest edition of the Department of Environment and Resource Management Water Quality Sampling Manual; and (b) carried out on samples that are representative of the works area. The works must not result in a change in water chemistry that will impact upon ecological values on or off site. The only contaminants permitted to be released to any waters (including the bed or banks - of such waters) are sediments disturbed during the works. Page 7 of 11° 091217 Department of Environment and Resource Management
Page 11
DERM Permit number: SPCC01881911 D5. Where sediment control structures are necessary to ensure compliance with the conditions of this development approval, such sediment control structures must be: i. Installed prior to any works commencing; and ii. Maintained during the time period in which works take place and until rehabilitation works (if any) have been completed; and iii. Any control measures installed in receiving waters may only be removed when water quality monitoring results demonstrate that the removal of such measures will not have any adverse impacts on adjacent water quality. D6. In the event of environmental harm (example: fish kill, algae bloom) occurring in the works area or within 500 metres of the works area, all works associated with this approval are to cease immediately until the administering authority has been informed and an approval to recommence has been issued by the administering. authority. D7. In carrying out this operational work, the release of contaminants must: (a) only occur within the permitted areas specified in water allocation area NRS-RE-001 (Table 1— Plans and Documents) (b) not have any properties, not contain any organisms or other contaminants which are capable of causing environmental harm; and (c) not produce any slick or other visible evidence of oil or grease, nor contain visible floating oil, grease, scum, litter or other objectionable matter; and (d) not produce any discolouration, outside a 200m mixing zone, which adversely affects any environmental value applicable to the receiving waters; and (e) not exceed limits indicated in Schedule D ~ Table 1; and (f) sediments identified or potentially containing acid sulphates are managed to ‘avoid exposure to air (i.e. acid sulphate sediments are to remain submerged and not used for beach nourishment). , Schedule D - Table 1 Quality Characteristic Limit No visible plume in receiving waters is to extend beyond 200m from any deposition Turbidity Plume (visual) “ point and\or works area, to be checked regularly during the works. pH (in-situ) Value not to be less than 6.5 or greater than 9.0, to be check regularly during the works. Petroleum products (oil; grease, fuel etc) No visible incidence, to be checked regularly during the works. END OF CONDITIONS FOR SCHEDULE D Schedule E - Complaints E1. All complaints received must be recorded including investigations undertaken, conclusions formed and action taken. This information must be made available to the administering authority upon request: E2. All complaints must be recorded with the following details, but not limited to; time, date and reason for the complaint; (a) type of communication (telephone, letter, email etc.); (b) name, contact address and contact telephone number of complainant Page 8 of 11 * 091217 Department of Environment and Resource Management
Page 12
DERM Permit number: SPCC01881911 (Note: if the complainant does not wish to be identified then “Not identified” is to be recorded); (d) details of investigation undertaken by the operator and action undertaken to resolve the complaint; , (e) name of person responsible for investigating complaint. END OF CONDITIONS FOR SCHEDULE E END OF CONDITIONS DEFINITIONS Words and phrases used throughout this permit are defined below. Where a definition for a term used in this permit’ is sought and the term is not defined within this permit’ the definitions provided in the relevant legislation shall be used. “administering authority" means the Department of Environment and Resource Management or its successor. : “annoyance” In determining what constitutes “annoyance” regard must be had to Australian Standard 1055.2 - 1989 Acoustics - Description and Measurement of Environmental Noise Part 2 Application to specific situations. “annual return” means the return required by the annual notice (under section 316 of the Environment Protection Act 1994) for the section 73F registration certificate that applies to the development approval. "approval" means ‘notice of development application decision’ or ‘notice of concurrence agency response’ under the Integrated Planning Act.1997. “approved plans” means the plans and documents listed in the approved plans section in the notice attached to this development approval. : “authorised place" means the place authorised under this development approval for the carrying out of the specified environmentally relevant activities. “background noise level” means either: . Lago, being the A-weighted sound pressure level exceeded for 90 percent of the time period (T) of not less than 15 minutes, using Fast response, or Labg, t being the arithmetic average of the minimum readings measured in the absence of the noise under investigation during a representative time period (T) of not less than 15 minutes, using Fast response. “Coast” means all areas within or neighbouring the foreshore. “Coastal waters” means Queensland waters to the limit of the highest astronomical tide. “Coastal zone” means — a) coastal waters; and b) all areas to the landward side of coastal waters in which there are physical features, ecological or natural processes or human activities that affect, or potentially affect, the coast or coastal resources. “Foreshore” means the land lying between high water mark and low water mark as is ordinarily covered and uncovered by the flow and ebb of the tide at spring tides. “coastal dune" means a ridge or hillock of sand or other material on the coast and built up by the wind. “commercial place” means a place used as an office or for business or commercial purposes. “dredge spoil" means material taken from the bed or banks of waters by using dredging equipment or other equipment designed for use in extraction of earthen material. "dwelling" means any of the following structures or vehicles that is principally used as a residence — * ahouse, unit, motel, nursing home or other building or part of a building; "a caravan, mobile home or other vehicle or structure on land; “a water craft in a marina. “erosion prone area" means an area declared to be an erosion prone area under section 70(1) of the Coastal Protection and Management Act 1995. “high water mark" means the ordinary high water mark at spring tides. “integrated environmental management system” for an environmentally relevant activity or activities, means a system for the management of the environmental impacts of the carrying out of the activity or activities. : Page 9 of 11" 091217 : Department of Environment and Resource Management
Page 13
DERM Permit number: SPCC01881911
"intrusive noise” means noise that, because of its frequency, duration, level, torial characteristics,
impulsiveness or vibration —
e is clearly audible to, or can be felt by, an individual; and
* annoys the individual.
In determining whether a noise annoys an individual and is unreasonably intrusive, regard must be given to
Australian Standard 1055.2 — 1997 Acoustics — Description and Measurement of Environmental Noise Part
2- Application to Specific Situations.
“Lamax ag, T Means the average maximum A-weighted sound pressure level, adjusted for noise character and
measured over a time period of not less than 15 minutes, using Fast response.
“maintenance work on lawful work” means maintaining works in accordance with the development approval.
Examples of maintenance work include excavation of material for repair or maintenance of the
approved dredge basin. Examples of work not considered to be maintenance work include work to
extend the boundaries of an approved dredge basin in any dimension (including depth) or any new
dredging not covered by a development approval.
“Max Lya, 7” means the maximum A-weighted sound pressure level measured over a time period of not less
than 15 minutes, using Fast response.
“land" in the "land schedule" of this document means land excluding waters and the atmosphere.
“maximum” means that the measured value of the quality characteristic or contaminant must not be greater
than the release limit stated.
“minimum” means that the measured value of the quality characteristic or contaminant must not be less than
the release limit stated.
"mg/L" means milligrams per litre.
“noise sensitive place” means -
(a) a dwelling, mobile home or caravan park, residential marina or other residential premises; or
(b) a motel, hotel or hostel; or
{c) a kindergarten, school, university or other educational institution; or
(d) a medical centre or hospital; or
(e) a protected area; or
(f) a park or gardens.
“noxious” means harmful or injurious to health or physical well being.
“NTU” means nephelometric turbidity units.
“offensive” means causing offence or displeasure; is disagreeable to the sense; disgusting, nauseous or
repulsive.
“operator” means any of the following:
(i) a person having the benefit of this development permit
(ii) the holder of a registration certificate for this development permit
(iii) anyone undertaking the activity to which this development permit relates (Note: it is an offence to
carry out work under a development permit without a relevant registration certificate)
“program of dredging” means the location and nature of a dredging project, including the quantities and
characteristics of material to be dredged, the details of the location of the material to be dredged, the
location in which it is to be placed and the timeframes for milestones and or completion that have been
specified as approved programs of dredging under this development approval.
"protected area" means —
a. aprotected area under the Nature Conservation Act 1992; or
b. amarine park under the Marine Parks Act 1992: or
c. aWorld Heritage Area.
“regularly” means at fixed intervals or at evenly spaced intervals.
“range” means that the measured value of the quality characteristic or contaminant must not be greater than
the higher release limit stated nor lower than the lower release limit stated. :
“site” means land or tidal waters on or in which it is proposed to carry out the development approved under this
development approval.
"tidal water" means the sea and any part of a harbour or watercourse ordinarily within the ebb and flow of the
tide at spring tides.
“toxicants” in water (refer to section 3.4) and sediment (refer to section 3. 5) as per Australian Water Quality
Guidelines.
Page 10 of 11 * 091217 Department of Environment and Resource Management
Page 14
DERM Permit number: SPCC01881911 “waters" includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-thereof. “works” or "operation" means the development approved under this development approval. i "you" means the holder of this development approval or owner / occupier of the land which is the subject of this development approval. 4 Page 11 of 11 * 091217 Department of Environment and Resource Management
Page 15
Department of Environment and Resource Management Sustainable Planning Act 2009 DERM Permit‘ number: SPCE01881811 Date application received: Permit type: Date of decision: Decision: Relevant laws and policies: Jurisdiction(s): Assessment manager reference: MLO001:VZT:OPW11/0116 9 May 2011 Concurrence agency response 16 June 2011 Approved subject to conditions that must attach to any development approval Environmental Protection Act 1994 and any related statutory instruments and subordinate legislation Material change of use - Environmentally relevant activities Sustainable Planning Regulation 2009 - Schedule 7, table 2, item 1 : Development Description(s) Property/Location Development Noosa River Spit, Noosa River, Noosa Heads QLD USL adjacent to | ERA 16 Extractive and screening activities 1 dredging, Lot 114 on MCH839107 in a year, the following quantity of material (b) more than 10,000t to 100,000t Dredging in Noosa River adjacent to Doggy Beach for erosion protection works to undertake beach nourishment and fill sand containers for submerged seawail and groyne works. Permit includes licences, approvats, permits, authorisations, certificates, sanctions or equivalent/similar as required by legisiation administered by the Department of Environment and Resource Management. Page 1 of 12 + 091217 Department of Environment and Resource Management www.derm.qlid.gov.au “ABN 46 640 294 485 A YY. Queensland Government
Page 16
DERM Permit number: SPCE01881811 TABLE 1: Plans and Documents Plan/Document No. Plan/Document Name Date NRS-RE-001 Water Allocation Area 22 Dec 2010 NRS-002 , Proposed Stage 4 Works 14 Feb 2011 NRS-003 Submerged Closure Layout 10 Feb 2011 NRS-004 Submerged Closure Typical Cross-section 14 Feb 2011 NRS-005 Wall and Groyne Layout 10 Feb 2011 NRS-006 Groyne Typical X-Section 14 Feb 2011 NRS-007 Wall Typical Cross-Section 14 Feb 2011 NRS-008 , Dredge Area Layout 10 Feb 2011 NRS-009 Dredge Area Typical Profile 10 Feb 2011 NRS-010 Nourishment Typical Profile 10 Feb 2011 Page 2 of 12 * 091217 Department of Environment and Resource Management
Page 17
DERM Permit number: SPCE018818711 Reason(s) for inclusion of conditions In accordance with section 289 of the Sustainable Planning Act 2009, the reason(s) for inclusion of conditions stated in this permit required by the concurrence agency response for the application are as follows. The conditions are included pursuant to section 73B of the Environmental Protection Act 1994. Environmentally Relevant Activities (ERA) This permit gives permission to undertake a dredging activity according to specific conditions. The aforementioned description of any environmentally relevant activity (ERA) for which this permit is issued is simply a restatement of the ERA as prescribed in the legislation at the time of issuing this permit. Where there is any conflict between the abovementioned description of the ERA for which this permit is issued and the conditions specified herein as to the scale, intensity or manner of carrying out of the ERA, then such conditions prevail to the extent of the inconsistency. . This permit authorises the ERA. It does not authorise environmental harm unless a condition within this permit explicitly authorises that harm. Where there is no such condition, or the permit is silent on a matter, the lack of a condition or silence shall not be construed as authorising harm. In addition to this permit, for a person to carry out this ERA they must be a registered operator under the Environmental Protection Act 1994, for the person to become a registered operator, they must apply for a registration certificate under section 73F of the Environmental Protection Act 1994. Ben Sale Delegate Delegate, Chief Executive administering the Environmental Protection Act 1994 Department of Environment'and Resource Management _ 14 June 2011 Page 3 of 12 "091217 Department of Environment and Resource Management
Page 18
DERM Permit number: SPCE01881811 CONDITIONS Schedule A - General conditions Limitations of permit At. This development permit authorises ERA 16 1(b) dredging for a period of 12 months, from the date of approval the following quantity of material - 50,000t, that is for Stage 1 erosion protection works within Noosa River on USL adjacent to Lot 114 on Plan MCH839107, Noosa River Spit. A2. . No dredged material shall be removed from the bed or foreshores outside the area marked on Plan - Water allocation area NRS-RE-001. A3. The works must be undertaken in accordance with the plans and documents listed. above in Table 1 - Plans and Documents. Prevent environmental harm A4. In carrying out the environmentally relevant activity, the holder of this development approval must take all reasonable and practicable measures to prevent and/or to minimise the likelihood of environmental harm being caused. Display of development approval AS. A copy of this development approval must be available at the dredging site or kept in a location readily accessible to personnel carrying out the activity at all times and all dredging plant personnel must be made aware of the conditions of this approval. Notification of incidents AG. As soon as practicable after becoming aware of any incident of environmental harm (including a reasonable suspicion that environmental harm has or is likely to have occurred) which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with the conditions of this development approval, the holder of this development approval must notify the administering authority of the release by telephone (Pollution Hotline 1300 130 372) or local office (07) 54596 132. AZ, The notification of incidents as required by condition A6 must include but not be limited to the following information: (a) the holder of the development approval; (b) the location of the incident; (c) the number of the development approval; (d) the name and telephone number of the designated contact person; (e) the time of the incident; (f) the time the holder of the development approval became aware of the incident; (g) the suspected cause of the incident; : (h) the environmental harm and or environmental nuisance caused, threatened, or suspected to be caused by the incident; and (i) actions taken to prevent a further incident and mitigate any environmental harm and or environmental nuisance caused by the incident. Page 4 of 12 ° 091217 1 Department of Environment and Resource Management
Page 19
DERM Permit number: SPCE01881811 A8. Not more than 14 days following the initial notification of an incident, the holder of this development approval must provide written advice of the information supplied in accordance with condition number A7 in addition to: (a) proposed actions to prevent a recurrence of the emergency or incident; (b) outcomes of actions taken at the time to prevent or minimise environmental harm and or environmental nuisance, and (c) the results of any environmental monitoring performed. Notification before commencement AQ. At least 10 business days prior to dredging work commencing, the administering authority must be informed of at least the following: . (a) planned timetable of the dredging for the program/year including proposed staging of dredging activities and hours of operation; (b) the contact details for the person/s made available during the hours of operation who can appropriately address any complaints. Trained / experienced operator(s) A10. The daily operation of dredging, transportation and pollution monitoring equipment or any other equipment used in connection with the dredging operations must be carried out bya person(s) with appropriate experience and/or qualifications to ensure the effective operation _ of the equipment. . Records Ait. All records required by this permit must be kept for five years. At2. The operator must maintain a record of sites where dredging is carried out (specifying the ‘boundaries of the dredged area by GPS coordinates) and the volume of material removed from each site (to the nearest tonne). A13. All records required to be kept by a condition of this development approval must be provided to an authorised person or the administering authority upon request. Maintenance of measures, plant and equipment : A14. The operator must: (a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this development permit; (b) maintain and calibrate such measures, plant and equipment in an efficient condition and keep records of the maintenance; (c) operate such measures, plant and equipment in an efficient manner. Alterations A165. No change, replacement or operation of any plant or equipment is permitted if the change, replacement or operation of the plant or equipment increases, or is likely to substantially increase, the risk of environmental harm above that expressly provided by this development approval. (An example of a substantial increase in the risk of environmental harm is an increase of 10% or more in the quantity of a contaminant to be released into the environment). Page-5 of 12 " 091217 Department of Environment and Resource Management
Page 20
DERM Permit number: SPCE01881811 Calibration Al6, All instruments and devices used for the measurement or monitoring of any parameter under any condition of this development approval must be calibrated and appropriately operated and maintained. Nuisance A17. Notwithstanding any other condition of this development approval, this development approval does not authorise any release of contaminants which causes or is likely to cause an environmental nuisance beyond the boundaries of the water allocation area NRS-RE-001. Site Based Management Plan (SBMP) A18, The operator must implement a site based management plan from the commencement of this ERA. The SBMP must identify all causes of environmental harm, including but not limited to the actual and potential release of any contaminants, the nature of the environmental harm and the actions that will be taken to prevent environmental harm being caused. The SBMP must also provide for the review and ‘continual improvement’ in the overall environmental performance of activities to which this approval relates. A19. The SBMP must address the following matters: (a) environmental commitments - a commitment by senior management to achieve specified and relevant environmental goals; (b) identification of environmental issues and potential impacts; (c) control measures for routine operations to minimise likelihood of environmental harm; (d) contingency plans and emergency procedures for non-routine situations (including but not limited to the emergency protocol when spills occur and the amount of neutralising agent to be kept onsite); (e) organisational structure and responsibility; (f) effective communication; (g) monitoring of contaminant releases; (h) conducting environmental impact assessments; (i) staff training; (j) record keeping; and (k) periodic review of environmental performance and continual improvement. A20. The SBMP must be made available to the administering authority when requested. A21. The SBMP must not be implemented or amended in a way that contravenes any condition of this development permit. Equipment A22. Any dredging must be conducted using equipment that is in survey and registered. A23. On completion of the dredging operation or when directed by the administering authority to do so, the dredger shall remove all dredge plant and equipment (including pipes, floats and other equipment used in or in connection with the dredging operations) from the site. End Schedule A - General conditions Page 6 of 12 * 091217 Department of Environment and Resource Management
Page 21
Schedule B - Dredging
B1.
B2.
B3.
B4.
BS.
DERM Permit number: SPCE01881811
The only form of dredging to be undertaken as part of this permit is the relocation of clean
sand for the purposes of beach nourishment, backfilling, filling material for Stage 1 works
and for an interim navigation channel.
Disturbance to acid sulphate soils (ASS) is to be avoided as far as practicable, should the
works disturb ASS the works must comply with Instructions for the Treatment and Management
of Acid Sulfate Soils, 2001, Queensland Government, or any updates as they become available.
Dredging works must ensure that no significant stability or hydrological changes to tidal
hydrodynamics, wave or current conditions occur either directly or indirectly in the immediate
area that could induce detrimental impacts on the adjacent coastline or beach profiles.
Material dredged under this permit must remain within the active Noosa River system, this
includes beach nourishment and material placed in underwater containment and dredged
material is not permitted to be stockpiled on land.
The dredge area is to be checked prior to completion of the works and all waste materials
{including anchor blocks and ropes used during the dredging) are removed prior to departure.
End Schedule B - Dredging
Schedule C - Monitoring
C1.
C2.
C3.
C4.
The operator of this development permit must monitor the visual impact of the dredging
activity on the environment by undertaking the following: |
(a) Daily observations and recording of the extent of any turbidity plume caused by }
dredging; and
(b) Daily observations and recording of the period of time the turbidity persists.
In the event that the administering authority requires water quality sampling or dredge material
sampling, all determinations of the quality of the samples must be:
(a) made in accordance with methods prescribed in the latest edition of the Department of
Environment and Resource Management Water Quality Sampling Manual; and
(b) carried out on samples that are representative of the discharge.
The measurement and reporting of any monitoring and\or nuisance levels (air, noise) must be
undertaken by a person or body possessing appropriate experience and qualifications to perform
the required measurements.
If in the opinion of an authorised person, monitoring indicates that the works are a nuisance,
the operator must:
(a) address the complaint including the use of appropriate dispute resolution if required; or
(b) immediately implement abatement measures so that the works do not result in any further
environmental nuisance.
End Schedule C - Monitoring
Schedule D - Water
D1.
The only contaminants permitted to be released to any waters (including the bed or banks of
such waters) are sediments disturbed during dredging and placement.
Page 7 of 12 * 091217 . . Department of Environment and Resource Management
Page 22
DERM Permit number: SPCE01881811 De. DS. D4. D5. All reasonable and practicable measures must be taken to minimise any increase in turbidity of the waters or the release of contaminants as a result of these works to any waters or the bed and banks of any waters. There must be no release of petroleum/oil based or similar typé products from any vessel used jn the dredging operations to any waters. Where sediment control structures are necessary to ensure compliance with the conditions of this development approval, such sediment control structures must be: (a) Installed prior to any works commencing; and (b) Maintained during the time period in which works take place and until rehabilitation works (if any) have been completed; and (c) Any control measures installed in receiving waters may only be removed when water quality monitoring results demonstrate that the removal of such measures will not have any adverse impacts on adjacent water quality. In carrying out this activity, the release of contaminants must: (a) only occur within the permitted areas specified in water allocation area NRS-RE-001 (b) not have any properties, not contain any organisms or other contaminants which are capable of causing environmental harm; and « (c) must not produce any slick or other visible evidence of oil or grease, nor contain visible floating oil, grease, scum, litter or other objectionable matter; and (d) must not produce any discolouration, outside a 200m mixing zone, which adversely affects any environmental value applicable to the receiving waters. (e) sediments identified or potentially containing acid sulphates are managed to avoid exposure to air (i.e. sediments are to remain submerged and not used for beach nourishment) Schedule D - Water - Table 1 Quality Characteristic Limit No visible plume in receiving waters is to extend beyond 200m from any deposition point and\or the dredge operation, to be checked regularly when dredge is in operation. Turbidity Plume (visual) pH (in-situ) Value not to be less than 6.5 or greater than 9.0, to be checked regularly when dredge is in operation. Petroleum products (oil, grease, fuel etc) No visible incidence, to be checked regularly when dredge is in operation. End Schedule D - Water Schedule E - Air E1. The release of noxious or offensive airborne contaminants resulting from the works must not cause a nuisance at any nuisance sensitive or commercial place. Page 8 of 12 * 091217 + . Department of Environment and Resource Management j i i i i
Page 23
DERM Permit number: SPCE01881811 E2. If in the opinion of an authorised person, airborne contaminant monitoring indicates environmental nuisance is being caused by an airborne contaminant from the works, the registered operator must: (a) address the complaint including the use of appropriate dispute resolution if required; or (b) immediately implement abatement measures so that the airborne contaminant from the works does not result in any further environmental nuisance. End Schedule E - Air Schedule F - Land Ft. There must be no release of petroleum/oil based or similar type products from any machinery used in the works. F2, There is to be no chemicals, wastes, petroleum products (fuel & oil) stored within 30 metres from the high water mark. F3. All works must be undertaken in a manner that minimises damage to native vegetation on and adjacent to the site. End Schedule F - Land Schedule G - Noise G1. Noise from the activity must not cause environmental nuisance at any nuisance sensitive place or commercial place. G2. The environmentally relevant activity must be carried out by such practicable means necessary to prevent the emission or likelihood of emission of noise that constitutes environmental annoyance. G3. When requested by the administering authority, noise monitoring must be undertaken to investigate any complaint of noise nuisance and the results are to be provided within 14 days to the administering authority following the monitoring. Monitoring must include, but not limited to: (a) La 10, adj, 10 mins. (b) La 1, adj, 10 mins (c) _ the level and frequency of occurrence of impulsive or tonal noise; (d) atmospheric conditions including wind speed and direction; (e) effects due to extraneous factors such as traffic noise; and (f} location, date and time of recording. G4. The method of measurement and reporting of noise levels must comply with the latest edition of the Department of Environment and Resource Management Noise Measurement Manual. End Schedule G - Noise Schedule H - Waste H1. Procedures must be implemented to ensure that wastes generated in carrying out the environmentally relevant activity that can be recycled or reused are done so, and those that must be disposed of go to an appropriate facility that accepts such wastes. End Schedule H - Waste Page 9 of 12 * 091217 Department of Environment and Resource Management
Page 24
DERM Permit number: SPCE01881811 Schedule I - Complaints lt. All complaints received must be recorded including investigations undertaken, conclusions formed and action taken. This information must be made available to the administering authority upon request. I2. All complaints must be recorded with the following details and be provided to the administering authority upon request (a) type of communication (telephone, letter, email etc.); (b) name, contact address and contact telephone number of complainant (Note: if the complainant does not wish to be identified then “Not identified” is to be recorded); (d) details of investigation undertaken by the operator and action undertaken to resolve the complaint; (e) name of person responsible for investigating complaint. End Schedule | — Complaints END OF CONDITIONS DEFINITIONS Words, and phrases used throughout this permit! are defined below. Where a definition for a term used in this permit" is sought and the term is not defined within this permit’ the definitions provided in the relevant legislation shall be used. “administering authority" means the Department of Environment and Resource Management or its : successor. | “annoyance” In determining what constitutes “annoyance” regard must be had to Australian Standard 1055.2 - 1989 Acoustics - Description and Measurement of Environmental Noise Part 2 Application to specific situations. “annual return” means the return required by the annual notice (under section 316 of the Environment Protection Act 1994) for the section 73F registration certificate that applies to the development approval. "approval" means ‘notice of development application decision’ or 'notice of concurrence agency response’ under the Integrated Planning Act 1997. “approved plans" means the plans and documents listed in the approved plans section in the notice attached to this development approval, “authorised place" means the place authorised under this development approval for the carrying out of the specified environmentally relevant activities. “background noise level” means either: Lago, t being the A-weighted sound pressure .level exceeded for 90 percent of the time period (T) of not less than 15 minutes, using Fast response, or Labg, t being the arithmetic average of the minimum readings measured in the absence of the noise under investigation during a representative time period (T) of not less than 15 minutes, using Fast response. “Coast” means all areas within or neighbouring the foreshore. “Coastal waters” means Queensland waters to the limit of the highest astronomical tide. “Coastal zone” means — a) coastal waters; and b) all areas to the landward side of coastal waters in which there are physical features, ecological or natural processes or human activities that affect, or potentially affect, the coast or coastal resources. “Foreshore” means the land lying between high water mark and low water mark as is ordinarily covered and uncovered by the flow and ebb of the tide at spring tides. | “coastal dune" means a ridge or hillock of sand or other material on the coast and built up by the wind. “commercial place” means a place used as an office or for business or commercial purposes. Page 10 of 12 091217 Department of Environment and Resource Management
Page 25
DERM Permit number: SPCE01881811 “dredge spoil" means material taken from the bed or banks of waters by using dredging equipment or other equipment designed for use in extraction of earthen material. “dwelling” means any of the following structures or vehicles that is principally used as a residence — " ahouse, unit, motel, nursing home or other building or part of a building; " acaravan, mobile home or other vehicle or structure on land; = awater craft in a marina. "erosion prone area" means an area declared to be an erosion prone area under section 70(1) of the Coastal Protection and Management Act 1995. “high water mark". means the ordinary high water mark at spring tides. “site based management plan” for an environmentally relevant activity or activities, means a system for the management of the environmental impacts of the carrying out of the activity or activities. “intrusive noise" means noise that, because of its frequency, duration, level, tonal characteristics, impulsiveness or vibration — e is clearly audible to, or can be felt by, an individual; and e annoys the individual. In determining whether a noise annoys an individual and is unreasonably intrusive, regard must be given to Australian Standard 1055.2 — 1997 Acoustics ~ Description and Measurement of Environmental Noise Part 2-— Application to Specific Situations. “Lamax agj, T Means the average maximum A-weighted sound pressure level,.adjusted for noise character and measured over a time period of not less than 15 minutes, using Fast response. “maintenance work on lawful work” means maintaining works in accordance with the development approval. Examples of maintenance work include excavation of material for repair or maintenance of the approved dredge basin. Examples of work not considered to be maintenance. work include work to extend the boundaries of an approved dredge basin in any dimension (including depth) or any new dredging not covered by a development approval. “Max Lys, 7” means the maximum A-weighted sound pressure level measured over a time period of not less than 15 minutes, using Fast response. “land” in the "land schedule" of this document means land excluding waters and the atmosphere. “maximum” means that the measured value of the quality characteristic or contaminant must not be greater than the release limit stated. ‘ “minimum” means that the measured value of the quality characteristic or contaminant must not be less than the release limit stated. “mg/L” means milligrams per litre. “noise sensitive place” means - (a) a dwelling, mobile home or caravan park, residential marina or other residential premises; or (b) a motel, hotel or hostel; or - (c) a kindergarten, school, university or other educational institution; or (d) a medical centre or hospital; or (e) a protected area; or (f) @ park or gardens. “noxious” means harmful or injurious to health or physical well being. "NTU" means nephelometric turbidity units. “offensive” means causing offence or displeasure; is disagreeable to the sense; disgusting, nauseous or repulsive. . “operator” means any of the following: (i) a person having the benefit of this development permit (ii) the holder of a registration certificate for this development permit (iii) anyone undertaking the activity to which this development permit relates (Note: it is an offence to carry out work under a development permit without a relevant registration certificate) “program of dredging” means the location and nature of a dredging project, including the quantities and characteristics of material to be dredged; the details of the location of the material to be dredged, the location in which it is to be placed and the timeframes for milestones and or completion that have been specified as approved programs of dredging under this development approval. “regularly” means at fixed intervals or at evenly spaced intervals. “range” means that the measured value of the quality characteristic or contaminant must not be greater than the higher release limit stated nor lower than the lower release limit stated. Page 11 of 12 "091217 Department of Environment and Resource Management
Page 26
DERM Permit number: SPCE01881811 “site" means land or tidal waters on or in which it is proposed to carry out the development approved under this development approval. "tidal water" means the sea and any part of a harbour or watercourse ordinarily within the ebb and flow of the tide at spring tides. “waters” includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-thereof. "works" or "operation" means the development approved under this development approval. "you" means the holder of this development approval or owner / occupier of the land which is the subject of this development approval. Page 12 of 12 * 091217 Department of Environment and Resource Management
Page 27
Sustainable Planning Act 2009
DERM Permit 1 number: IC0511NAM0009
Assessment manager reference OPW11/0116
(if any):
Date application received: 9 May 2011
Decision: Conditions that should attach to any development approval
Relevant laws and policies: State Planning Policy 2/02 – Planning and Managing
Development Involving Acid Sulfate Soils
Jurisdiction(s): Various aspects of development - Acid sulfate soils.
Sustainable Planning Regulation 2009 - Schedule 7, table 3,
item 3
Development Description(s)
Property/Location Development
'Park & Public Toilets' Lot 114 Operational Works
Claude Batten Drive, MCH839107
Noosa Heads
Reason(s) for inclusion of conditions
State Planning Policy 2/02 2 sets out the State’s interests concerning development involving acid
sulfate soils (ASS) in low-lying coastal areas. An assessment of the development application
indicates that there are significant environmental risks associated with disturbing acid sulfate soil
(ASS) at this site. To satisfy the requirements of the SPP 2/022, detailed knowledge on the location of
ASS and site specific management strategies should be a precursor to any site disturbance. This
may impact on the project design and financial viability of the project.
The disturbance of ASS should be avoided wherever possible. Any negative environmental impact
which occurs as a result of a development activity disturbing ASS and which does not comply with
1
Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by legislation
administered by the Department of Environment and Resource Management.
2
State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate Soils
Page 1 of 3• 091217
Department of Environment and Resource Management
www.derm.qld.gov.au ABN 46 640 294 485
Page 28
DERM Permit number: IC0511NAM0009 SPP 2/022 breaches the duty of care requirements as defined in the Environmental Protection Act 1994. The obligation is on the developer to comply with SPP 2/022 and conditions of approval. Delegate PR Wilson Principal Scientist (Resource Assessment & Information) Bundaberg – South East Region Delegate, Chief Executive administering the Sustainable Planning Act 2009 Department of Environment and Resource Management 14 June 2011 Page 2 of 3 · 091217 Department of Environment and Resource Management
Page 29
DERM Permit number: IC0511NAM0009
CONDITIONS
The Department recommends that the following conditions be attached to any development approval:
1. Complete an ASS investigation in accordance with SPP 2/02 Guideline 3 .
2. Based on the results of the ASS investigation, formulate an ASS Environmental Management
Plan (ASS EM Plan) consistent with Appendix 4 of the SPP2/02 Guideline and the
Management Principles of the latest version of the Queensland Acid Sulfate Soil Technical
Manual, Soil Management Guidelines 4 .
3. The development must comply with the ASS EM Plan required in 2.
The Department further recommends that the above conditions be addressed prior to development
commencing and suggests that the compliance stage of IDAS provides a suitable process for
ensuring the technical reports are in accordance with SPP 2/021.
END OF CONDITIONS
3
State Planning Policy 2/02 Guideline: Planning and Managing Development involving Acid Sulfate Soils
4
Dear SE, Moore NG, Dobos SK, Watling KM and Ahern CR (2002). Soil Management Guidelines. In Queensland Acid Sulfate Soils
Technical Manual. Department of Natural Resources and Mines, Indooroopilly
Page 3 of 3 · 091217 Department of Environment and Resource Management
Used in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.