Council archive · source document
Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
B6. DERM Permit number: SPCC01881911 During and following construction of the works, any areas disturbed by the works are to be stabilised against wind erosion, rainwater run-off erosion and revegetated with endemic native species commonly found on adjacent areas or present prior to disturbance. END OF CONDITIONS FOR SCHEDULE B Schedule C - Monitoring C1. C2. C3. C4. C5. C6. The operator must implement a monitoring plan from the commencement of these works. The monitoring plan must achieve the following outcomes, but not limited to: (a) long-term ecological impacts associated with the works; ' (b) effectiveness of the erosion protection works; (b) compliance with the conditions of this development permit; (c) operations are adjusted in response to. monitoring results to ensure compliance with development permit conditions ‘ Quarterly monitoring of the works must be undertaken and records kept of its performance during the works and for the life of the works, or until otherwise advised by the administering authority that such monitoring can cease. Water quality monitoring must be undertaken daily and regularly (at fixed intervals or at evenly spaced intervals) at suitable locations within the works area and records kept of all relevant observations. The holder of this development approval must notify the administering authority in writing within 14 days of any monitoring result which indicates any failure of the works or exceedance of any licence limit. The operator of this development permit must monitor the visual impact of the operational works area on the environment by undertaking the following when works are being carried out; (a) Daily observations and recording of the extent of any turbidity plume caused by the works; and (b) Daily observations and recording of extent and period of time turbidity persists. END OF CONDITIONS FOR SCHEDULE C Schedule D - Water Di. D2. D3. D4, All reasonable and practicable measures must be taken to minimise any increase in turbidity of the waters or the release of contaminants as a result of these works to any waters. In the event that the administering authority requires water quality sampling, all determinations of the quality of the samples must be: (a) made in accordance with methods prescribed in the latest edition of the Department of Environment and Resource Management Water Quality Sampling Manual; and (b) carried out on samples that are representative of the works area. The works must not result in a change in water chemistry that will impact upon ecological values on or off site. The only contaminants permitted to be released to any waters (including the bed or banks - of such waters) are sediments disturbed during the works. Page 7 of 11° 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.