Attachment A - Noosa Council's Information Request · MCU24/0112
Noosa Council documents
Provide an amended roof and façade design that avoids box profiles, provides sufficient eaves
and further material variation between each dwelling in accordance with PO19/AO19.1 of the
Medium Density Residential Zone Code.
Engineering
Issue – Access and Carparking
Council has some concerns with the access and carparking.
The vehicle access to the garaging for the units crosses over the pedestrian paths and there
is potential for conflict. No detail has been provided to demonstrate how the potential risks will
be addressed.
In relation to car parking, the third car space for units A and D appears to be undersized even
for a “small car”.
Information Required
1. Provide additional detail how the potential risks for conflict on the access driveway will
be addressed (through surface treatments etc).
2. Provide dimensions for the third car space for units A and D and demonstrate that the
space is suitable for a “small car”, as described in AS/NZS2890.1:2004 (2.4.1(a)(ii)
Issue – Acid Sulfate Soils
The proposed development of the site includes filling of most of the site. No detail has been
provided on the extent of the works and the potential to impact on Acid Sulfate Soils, existing
drainage paths and flooding.
Information Required
3. Provide additional detail on the proposed filling of the site. The detail must be prepared
by a Registered Professional Engineer of Queensland (RPEQ) and include but not be
limited to:
3.1. Plans indicating the full extent of filling (area and depth);
3.2. Sufficient detail to demonstrate if the works trigger assessment for Acid Sulfate
Soils. If the works require assessment, provide a preliminary management plan
that demonstrates compliance with the State Planning Policy and The Noosa Plan
2020 – Acid Sulfate Soils Overlay Code; and
3.3. Sufficient detail to demonstrate that the works will not adversely impact on the
adjoining properties by altering existing drainage paths or flood levels.
Issue – Stormwater
No detail has been provided regarding stormwater collection and discharge for the proposed
development. The required retention and treatment structures may impact on the proposed
design.
Information Required
4. Provide a preliminary stormwater management plan for the proposed development. The
plan must be prepared by a Registered Professional Engineer of Queensland (RPEQ)
and include, but not be limited to:
4.1. Sufficient detail to demonstrate that the development will achieve compliance with
The Noosa Plan 2020 – Water Quality and Drainage Code, the Sustainable
Building Design Code and the State Planning Policy.
Page 2 of 3
Document Set ID: 23268547
Version: 1, Version Date: 01/10/2024 Print Date: 1 October 2024, 5:36 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Noosa Council's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 283 KB (small file)
- File type
No other editions are linked here.