Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Information Response

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Response: Vandal resistant materials can be provided to the external facade. We request a
condition to this effect. All tilt panels will be painted to assist with long term maintenance,
vandal resistance and presentation.

Item 8

Provide amended plans detailing the location of the staff recreation area outside of
the 6 metre setback to Taylor Court.

Response: Please refer to the revised Proposal Plans prepared by Aboda Design Group. The
staff recreation area has been located outside of the 6 metre front setback, and is now located
behind Unit 8 at the rear of the site. See extract below.




Item 9

Provide revised plans detailing a significantly greater landscaped area to the front of
the building line.

Response: In response to Item 8 above, the staff recreation area has been relocated to the
rear of the site, which allows for a greater landscaped area within the site frontage.



                                                                                             4
Log in to download the original file

Information Response.pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.