Original source · versioned page text
Information Response
Response: Vandal resistant materials can be provided to the external facade. We request a
condition to this effect. All tilt panels will be painted to assist with long term maintenance,
vandal resistance and presentation.
Item 8
Provide amended plans detailing the location of the staff recreation area outside of
the 6 metre setback to Taylor Court.
Response: Please refer to the revised Proposal Plans prepared by Aboda Design Group. The
staff recreation area has been located outside of the 6 metre front setback, and is now located
behind Unit 8 at the rear of the site. See extract below.
Item 9
Provide revised plans detailing a significantly greater landscaped area to the front of
the building line.
Response: In response to Item 8 above, the staff recreation area has been relocated to the
rear of the site, which allows for a greater landscaped area within the site frontage.
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.