RFI 9.3.20 - Attachment B - Revised Engineering plans · OPW19/0082
Plans and drawings: the text below has words only, no drawings.
NOTES
1. The location and depth of all services shall be 5. Refer Hydraulic drawings for
verified on site with service authority prior sanitary drainage layouts.
LINDSAY CONSULTING PTY LTD
to commencement of construction. LINDSAY CONSULTING PTY
LTD
6. Compaction of material under concrete driveways and
2. Concrete driveway and parking areas shall parking areas shall be as follows: RPEQ 4928
be constructed with 32 MPa concrete (i) 75 % Minimum Density for cohesionless material (AS 1289 E5.1); and OFF. 2C/82 PARKER STREET, MAROOCHYDORE PH 54 792 118
(ii) 90 % Relative Dry Density (STD Comp.) for material other than (i). THIS DRAWING REMAINS THE PROPERTY OF
For building set-out refer architectural drawings. LINDSAY CONSULTING PTY LTD AND IS FOR
3. THE SOLE USE OF THE CLIENT. NO PART
4. All dimensions and levels shall be verified on MAY BE USED IN PART OR WHOLE WITHOUT
site. Do not scale from drawing. GENERAL NOTES (SOME MAY NOTE APPLY) PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
LAKE ACCESS
SITE PLAN 1 1.
2.
THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS
DRAWINGS AND SPECIFICATIONS.
EFORE PROCEEDING WITH THE WORK ANY DISCREPANCIES IN THE CONTRACT
CLIENT AND PROJECT DESCRIPTION
BRIAN WILLIAMS
VILLAS DEVELOPMENT
140.56 m DOCUMENTS SHALL BE REFERRED FOR DECISION TO THE ENGINEER.
140.43 m
396 LAKE COOROIBAH RD
3. DO NOT SCALE FROM DRAWINGS IF IN DOUBT, ASK!!
269° 59' 20"
AH
4. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF SERVICES, ALL DIMENSIONS AND
NOOSA
269° 59' 20"
B LEVELS PRIOR TO CONSTRUCTION.
OI
FUTURE CABINS 5. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH AS2890, THE
OR
- MAX 100sqm BUILDING CODE OF AUSTRALIA (INCLUDING THE QUEENSLAND SUPPLEMENT), THE
CO
QUEENSLAND BUILDING ACT AMENDMENT ACT 1991 AND THE LOCAL AUTHORITY'S
BY-LAWS.
MANAGERS
RESIDENCE DRAWING TITLE
KE
5"
6. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN RELEVANT APPROVALS PRIOR TO
'4
LA
COMMENCEMENT OF WORKS.
SITE PLAN 1
10
m
360° 00' 00"
2°
PROPOSED 7. ALL STORMWATER CULVERTS TO BE RCP CLASS 2. ALL ROOFWATER PIPES TO BE
6
67.00 m
22
CABINS
.9
uPVC CLASS 'SH'.
75
8, SILT MANAGEMENT PLAN TO REMAIN IN PLACE UNTIL COMPLETION OF WORKS AND
SATISFACTORY MAINTENANCE IS COMPLETED.
FUTURE WORKS FUTURE WORKS 9. ALL PROPOSED OPERATIONAL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE
WITH COUNCIL'S OPERATIONAL WORKS APPROVAL LETTER AND COUNCIL'S DECISION
SCALES
NOTICE-DEVELOPMENT PERMIT.
10. CONCRETE KERB RAMPS SHALL BE ALIGNED TO COMPLY WITH COUNCIL'S STANDARD
"
LOT 1 -
25
DRAWING NO. 01-75 AND SHALL BE CONSTRUCTED STRICTLY IN ACCORDANCE WITH
0 10 20 m
COUNCIL STANDARD DRAWING NO. 01-15F.
2'
STAGE 2a
°3
m
Orig. 1:500
32
11. ALL TEMPORARY ADNDPERMANENT ROAD SIGNS AND LINEMARKING SHALL COMPLY
43
2.00
0.
WITH THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.).
17
EXISTING LINE MARKING SHALL BE REMOVED BY GRINDING NOT"BLACKING OUT".
COUNCIL DOES NOT APPROVE OF BLACKING OUT OF EXISTING LINE MARKING.
12. KERB MARKERS SHALL BE PROVIDED FOR ALL WATER, TELSTRA AND ANY OTHER
SERVICE CONDUIT ROAD CROSSINGS AS APPLICABLE
LOT 0 "
20
°1
5 '
SURVEY DATUM
35 m
.
2 0
6.8
12
m
COMMUNITY CENTRE 00
ASSOCIATED CONSULTANTS
" 5 . 0
'4 0 10
° 1
2 LOT 2 -
13
STAGE 1c 3.00
11
10
12
13
EXISTING WORKS 9
0° 00' 00"
173.74 m
EXISTING EP20 WASTEWATER LOT 2 -
HOLDING TANK AND PUMP STATION 14 STAGE 1d
8
REVISION LIST
A ORIGINAL ISSUE 21/12/17
B REVISED 16/03/18
C REVISED 30/09/19
15
7 D REVISED 26/02/20
EXISTING 3M DRIVEWAY 16
LOT 2 - 6
3.00
17 STAGE 1b
7' 50"
m
231.44
Computer File
169° 2
171687-CP.DWG
5 DRAWING NUMBER SHEET REV.
18
4.00 17-1687-C2 2 D
EXISTING 3M DRIVEWAY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI 9.3.20 - Attachment B - Revised Engineering plans.pdfRelated documentApplication case desk ↗