Skip to the record
The gold standard in government transparency.

Council archive · source document

RFI - Landscape Plans · MCU22/0087

of 7

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                            Notes:                                                     FSL




                                                                                                                                                                                                                                                                                                                                                                                       (X)
Notes:                                                                                                                                                                                                                                                                                                      - All timber to be CCA pressure treated to
- Place the rootball on a firmed base to achieve required FSL.                                                                                                                                                                                                                                              AS1604, Hazard 5, rough sawn pine.
- Thoroughly water the root ball immediately after planting.                                Notes:                                                                                                                                                                                                                                                                                           Timber edge
                                                                                                                                                                                                                                                                                                            - All timber edges to be arissed to comply
- Number of stakes will vary with pot size. Refer plant schedule.                           - Place the rootball on a firm base.                                                                                                                                                                            with council standards.
- Cultivate sides of excavated hole 50mm.                                                   - Thoroughly water the root ball immediately after planting.                                                                                                                                                    - All timber ends to have one coat of                                            Stakes
                                                                                            - Cultivate sides of excavated hole 50mm deep.                                                                                                                                                                  Cuprinol or equal prior to installation.
                                                                                            - Do not disturb kerb, road pavement or road side drainage works.                                                                                                                                               - Stakes to be 400mm into ground at max.
                                                                                            - Tease out roots on side of rootball when planting.                                                                                                                                                            1200mm centres, or as required to obtain                                         Existing/compacted
                                                                                            - Ensure top of rootball is not buried; expose and set flush with finished level.                                                                                                                               smooth curves. Top of stake to finish                                            /subgrade/subase
                                                                                                                                                                                                                                                                                                            20mm below top of timber edge. Where
                                                                                                                                                                                                                                                                                                            timber edges meet at corners provide
Hardwood Stake:                                                                                                                                                                                                                                                                                             double stakes.
25x25x90mm Place 600mm                                                                                                                                                                                                                                            90mm∅ capped slotted pipe                 - All fixings to be hot dipped galv.
into the ground. Do not                                                                                                                                                                                                                                           75mm below top of planter                 - Leading edge is to be free of burrs and
place through rootball.                                                                                                                                                                                                                                           connected to drainage system              splinters.
Secure with ties by looping                                                                                                                                                                                                                                       per Hydraulic Engineer
in a figure eight pattern.                                                                                                                                                                                    River stone to
                                                                                            Hardwood stake: Place 600mm                                                                                       top of pipe                                                                                   TIMBER EDGE         STAKES        (X) = Height above
Mulch: Pull away from                                                                       into the ground. Do not place                                                                                                                                         Mulch
                                                                                                                                                                                                                                                                                                                 38               50          finished surface level   FIXINGS
base of plant.                                                                              through rootball. Secure with                                                                                                                                         - refer to plans for organic or
                                                                                            ties by looping in a figure eight                                                                                                                                     inorganic locations                                                                                     50mm Bugle Headed
                                                                                                                                                                                                                                                                                                                                                  FLUSH
Form an earthen basin                                                                       pattern.                                                                                                                                                                                                                                                                      Batten Screws.




                                                                                                                                                                                                                                                                                                             100
around base of plant.                                                                                                                                                                                                                                                                                                                             20mm                    75mm Bugle Headed
                                                                                            Raise plant 50mm above                                                                                                                                               Podium soil                                                                                              Batten Screws.
                                                                                            finished surface level.                                                                                                                                                                                                                               100mm




                                                                                                                                                                                                                                               varies
                                                                                                                                                                                                                                                                 - refer to Specification
                                                                                            Mulch: Pull away from base                                                                                                                                                                                                                                                    100mm Bugle Headed
                                                                                                                                                                                                                                                                                                                                                  150mm                   Batten screws.
Topsoil blend                                                                               of plant.                                                                                                                                                                                                        100x38mm
                                                                                                                                                                                                                                                                  Geotextile fabric
Fertiliser: Do not allow                                                                    Form an earthen basin
contact with roots.                                                                         around base of plant.                                                                                                                                                 30mm Atlantis drainage cell                                   50x50mm
                                                                                                                                                                                                                                                                  or similar approved

Water retention additive
                                                                                                                                                                                                                                                                  Topping slab - If required.                 4 EDGE TYPE X
                                                                                             Topsoil blend                                                                                                                                                        Depth varies to achieve falls             CD-900 1:5@A1, 1:10@A3




                                                                                                                                                                                min 300
                                                                                                                                                                                                                                                                                                                   Timber garden edge
                                                                                                                                                                                                                                                                  to drain.
   1 140-300mm PLANTING                                                                     Water retention additive
                                                                                                                                                                                                                                                                  Waterproofing and protection
CD-900 1:10@A1, 1:20@A3                                                                                                                                                     1                                                                                     - to Architect's Specification.
                                                                                            Fertiliser: Do not allow
                                                                                            fertiliser to come in                                                       1                                                                                         Podium / basement slab
                                                                                            contact with roots.                                                                                                                                                   - refer Engineer's detail.
                                                                                                                                            width (w)
                                                                                            10 - 20mm Drainage gravel
                                                                                                                                              2xw                                                                                 3 PODIUM PLANTER
                                                                                                                                                                                                                                CD-900 1:10@A1, 1:20@A3



                                                                                        2 45-200ltr PLANTING
                                                                                      CD-900 1:10@A1, 1:20@A3




    FSL
                                                                    Mulch                                                                                                                                                            Notes:
                                                                    - to 100mm depth                                                                                                                                                 - Thoroughly water the root ball immediately after
                                                                                                                                                                                                                                     planting.
                                                                                                                                                                                          Turf as specified
                                                                    Soil blend or site topsoil                                                                                                                                       Marker stake:
                                                                    - to 300mm depth                                                                                                      Topsoil                                    12x12x75mm
                                                                                                                                                                                          - to 100mm depth                           Tree guard
                                                                                                                                                                                                                                     Form an earthen basin
                                                                                                                                                                                          Cultivate subgrade                         around the base of the
                                                                    Cultivated subgrade                                                                                                   - to 150mm depth                           plant.
                                                                    - to 150mm depth
                                                                                                                                                                                          Existing subgrade                          Mulch: Pull away from
                                                                                                                                                                                                                                     base of plant.                                        250




                                                                                                                                                                                                                                                                                      25
                                                                                                                                                                                                                                     Fertiliser: Do not allow
                                                                                                                                                                                                                                     contact with roots.
                                                                                                                                  6 TURF PROFILE
       5 GARDEN BED PROFILE
     CD-900 1:10@A1, 1:20@A3                                                                                       Turf profile scale 1:5
                                                                                                                                CD-900 1:5@A1, 1:10@A3
                                                                                                                                                                                                                                     Topsoil blend

                                                                                                                                                                                                                                     Water retention
                                                                                                                                                                                                                                     additive



                                                                                                                                                                                                                                              7 TUBESTOCK PLANTING
                                                                                                                                                                                                                                           CD-900 1:10@A1, 1:20@A3




                                                                                                                                                                                                                                                                      Revision            Date        Amendment                 Drawn        Checked
                                                                                                                                                                                                                               APPROVAL ONLY
CONSTRUCTION DETAILS                                                                                                                                                                                                           NOT FOR CONSTRUCTION
                                                                                                                                                                                                                                                                          A            24.11.2022   For Approval                  XL           CS



CD-900                                                                     scale as noted

3 BOTTLEBRUSH AVENUE , NOOSA HEADS
JOB NUMBER: 22432                                    CLIENT NAME: BOTTLEBRUSH PROPERTY TRUST

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Landscape Plans.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.