Approved Decision Notice - DBW24 0117 [As Published]
Currency Period
2. This development approval lapses if the works have not substantially started by 23 October
2026, unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan Name Date
- - Site Plan 1 of 2, prepared by Titan Enterprises Pty Ltd 12 August 2024
- - Site Plan 2 of 2, prepared by Titan Enterprises Pty Ltd 12 August 2024
Building Height
4. The maximum height of the development must not exceed 8.0 metres above the ground level
including where excavation is undertaken the exposed portion of the external façade of the
building.
Lighting Amenity
5. No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
or other incidental external lighting emanating from the site must not exceed 8 lux when
measured at any point 1.5 metres outside the boundary and at any level from ground level
upward.
Environment
6. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Landscaping Works
7. A minimum of 20% of the site must be retained as soft landscaping.
8. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling. In this regard, the removal of vegetation must not
extend beyond 5.0 metres of the building footprint.
9. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
10. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
11. All landscape works must be established and maintained for the life of the development, and
in a manner that ensures healthy, sustained and vigorous plant growth. All plant material
must be allowed to grow to full form and be refurbished when its life expectancy is reached.
Earthworks
12. Any earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP6 - Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Page 2 of 5
Document Set ID: 23319034
Version: 4, Version Date: 24/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original