SUPERSEDED Decision Notice - 010.2006.00002689.001 [As Published] · 132006.2689

of 19

Text shows just the words. Original shows the document exactly as it was published.

                                  Form 6 - Decision Notice
                                  INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2006/2689                            Date of Decision:    1 November 2007

1.    APPLICANT DETAILS

 Name:               Morgan & Beiers Pty Ltd

 Postal address:     CARE Ken Hicks & Associates Pty Ltd
                     PO Box 6380
                     MAROOCHYDORE BC QLD 4558


 Phone no:           5443 2844                 Fax no:     617 5443 7146

2.    PROPERTY DESCRIPTION

 Street address:     247, 249 and 253 David Low Way Peregian Beach

 Real property       Lot 1 & 2 RP 903222 and Lot 26 P 9315
 description:

3.    OWNER DETAILS

 Name:               Morgan & Beiers Pty Ltd

 Postal address:     PO Box 775
                     MOOLOOLABA QLD 4557

4.    REFERRAL AGENCIES

 Referral Agency            Address                                                   Basis
 Environmental              GPO Box 2771, BRISBANE QLD 4001                           Concurrence
 Protection Agency

5.    APPLICATION TYPE

 Development                     Development Details                        Preliminary         Development
                                                                             Approval              Permit
 Material Change of Use          Commercial Business Type 1 -                    No                 Yes
                                 Office

6.    DECISION DETAILS

Council decided to approve the application and grant a Development Permit, subject to conditions.

7.    APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Advertising Devices Code.

8.    SUBMISSIONS

One properly made submission. See attached list.

9.    CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached. Conditions from the
Environmental Protection Agency, as a concurrence agency are also attached.
Full text of the other 18 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                               2 of 19

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Development Permit for Building Works               All Building Works

 Development Permit for Operational Works            Landscaping, access and/or carparking, site civil works,
                                                     roadworks, stormwater drainage, frontage works, sewer
                                                     reticulation (including new mains, relocations, diversions,
                                                     pump stations and rising mains) and erosion & sediment
                                                     control.

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                               Date:      5 November 2007




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                3 of 19




                                    Noosa Council Conditions
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


Land Use
1.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plans are titled and numbered Basement/Site Plan SD02 Revision F,
      Ground Floor SD03 Revision H, First Floor SD04 Revision B, Elevations SD05 Revision C, Elevations
      SD06 Revision C, Sections SD07 Revision C, Roof Plan SD15 Revision A prepared by Morgan & Beiers
      ATF and dated March 2007 and as may be amended by these conditions.

2.    The development must be undertaken and operated in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
      emissions.

3.    Existing trees on the site and within road reserves are to be retained, except where required to be
      removed due to building operations or the conduct of the approved use.

4.    The open space and setback areas are to be landscaped in accordance with Council’s Landscape Code
      and Policy on Landscaping Plants and Guidelines and a properly prepared Landscape Plan prepared by a
      suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the
      premises being occupied and maintained at all times thereafter. These landscape plans required to be
      submitted are to denote areas of

      4.1.   existing vegetation or existing trees proposed or required to be retained on-site and in the road
             reserve in accordance with Ground Floor plan SD03 Revision H;

      4.2.   provision for planting of one native canopy tree every 6 car parking spaces within the car parking
             area located at ground floor level;

      4.3.   dense screen planting along the southern rear boundary of the site to protect the amenity of the
             adjoining residential property;

      4.4.   dense planting within the eastern front setback, particularly adjacent to the areas in between the
             buildings;

5.    Secure bicycle racks shall be provided on site to accommodate a minimum of 23 bicycles. The proposed
      bicycle racks shall be located both at ground floor level and within the basement to the reasonable
      satisfaction of the Manager, Land Use.

6.    End of trip facilities shall be provided within the approved building at a minimum rate of 1 locker per 2
      bicycle parking spaces (ie. 12); 1 shower per 10 bicycle parking spaces or part thereof (ie. 3); and change
      rooms with facilities either unisex or both male and female facilities are provided.

7.     Any advertising sign or device is to comply with Council's policies on advertising.

8.    The proposed development shall not exceed a maximum height of 2 storeys and 8 metres above natural
      and finished ground level.

9.    A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
      with Council at completion of work confirming compliance with the maximum allowable building height as
      required by either the conditions of approval or the Planning Scheme.

10.   Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining
      as open structures.

11.   All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
      (LPG or natural).




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                4 of 19


12.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
      Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
      and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
      comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
      exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
      requirement.

13.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted,
      to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
      Operational Works. The cash bond or trading bank guarantee will be returned on performance of the
      conditions of approval less any costs incurred by Council in respect of enforcing performance of this
      permit.

14.   The requirements of this development approval are to be effected, prior to the use of the premises.
      Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
      compliance with conditions.

15.   The Development Permit for a material change of use of premises lapses if the use has not happened by
      1 November 2011, unless an application to extend the currency is approved by Council.

16.   The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
      obtaining a Development Permit for Building Works.
Land Development
Lot Amalgamation
17.   All separate, adjoining lots that form part of this application shall be amalgamated into one undivided
      allotment in accordance with Section 3.7.3 of the Integrated Planning Act and the Plan of Survey
      submitted for registration at the Land Titles Office. Proof of title being issued for the amalgamated lot
      shall be submitted to Council prior to the issue of the Development Permit for Operational Works.
Vehicle Access
18.   A vehicular access driveway to serve the development shall be constructed from the David Low Way
      frontage of the site with a maximum width of 6.0m. The “slip lane” in David Low Way at the entrance to the
      site as shown on drawing number 2243 SD03 G dated 6/7/07 prepared by Ken Down Architects shall be
      deleted.

19.   The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
      vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
      without any step or level difference. Should any driveways be constructed to grades that do not comply
      with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
      that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
      footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
20.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the
      driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight
      line requirements as defined in AS2890.1, section 3.2.4. The applicant shall demonstrate compliance by
      illustrating these sight lines on the plans submitted for both Operational Works approval and Building
      Works approval.

21.   All vehicles shall enter and leave the site in a forward direction.
Car Parking
22.   Carparking shall be provided within the site generally as shown on Basement/Site Plan SD02 Revision F
      and Ground Floor SD03 Revision H dated 20 September 2007 as prepared by Ken Down Architects,
      except as modified herein.

23.   Car parking areas on-site shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      including:-

      23.1. a minimum of 50 spaces to be designated in the following manner:-

              23.1.1.      a minimum of 48 spaces designated for car parking including:-

                        23.1.1.1. a maximum of 18 spaces for staff parking (user class 1);




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   5 of 19


                       23.1.1.2. a minimum of 29 spaces for customer parking (user class 3);

                    23.1.1.3. a minimum of 1 space designated for disabled parking (user class 4) to be
                                 located at the ground floor level;

             23.1.2.      a minimum of the equivalent of 2 car park spaces for motorcycle and motor scooter
                          parking, to accommodate a minimum of 5 spaces;

      23.2. all client/visitor spaces with allowance for vehicles to enter and leave the site in a forward gear and
            with a minimum head clearance (headroom) at any point of 2.2m.

      23.3. all disabled car spaces shall be designed with allowance for vehicles to enter and leave the site in
            a forward gear and with a minimum head clearance (headroom) at any point of 2.3m.

24.   The proposed turning area at the end of the aisle that serves proposed carpark spaces 25 to 34 shall be
      line-marked with chevrons and have the words “No Parking” painted on the pavement. A sign shall also
      be provided to indicate that the area is a “Turning Area Only” and that “No Parking is Permitted”.

25.   An additional turning area shall be provided in the location of proposed carspace 21 as shown on drawing
      number 2243 SD02 E dated 3/7/07 as prepared by Ken Down Architects. The turning bay shall be line-
      marked with chevrons and have the words “No Parking” painted on the pavement. A sign shall also be
      provided to indicate that the area is a “Turning Area Only” and that “No Parking is Permitted”.

26.   Additional safety measures shall be placed on and adjacent to the access ramp to the basement
      carparking area. The measures shall be generally in accordance with the recommendations of the report
      prepared by Burchill VDM Job No:C3694, Report No:4530-0 dated July 2007. In additional to the
      measures recommended in the report the applicant shall construct a small median, minimum of 200mm
      wide and 150mm high, on the ramp to provide a physical barrier to prevent vehicles straying onto the
      wrong side of the ramp.

27.   All carparking shall be kept, maintained and line-marked in a condition fit for use.

28.   All staff carpark spaces shall be clearly defined by line marking each space with the words “Staff Parking
      Only” and by sign posting each space with a similar wording.

29.   All disabled carpark spaces shall be clearly defined by line marking each space with the words “Disabled
      Parking Only” and by sign posting each space with a similar wording.
Frontage Works
30.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the David Low Way
      frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
      Grass shall be couch, free of weeds.

31.   A new 2.0m wide concrete path shall be constructed along the David Low Way frontage of the site in
      accordance with Council’s design standards and to an alignment that protects any significant vegetation
      or any underground services.

32.   All paths, driveways and parking areas shall be designed and constructed to ensure pedestrian safety
      using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the
      Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility.

33.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
      paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
      prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
34.   Roof runoff from any new building shall be directed to a rainwater storage system or tank (minimum
                                                       2
      storage the greater of 5000 litres or 15 litres/m of roof area) that is installed to ensure water from the tank
      is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, outdoor
      cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks are to be
      designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
      Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
      The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
      Operational Works approval and any overflow shall be directed to the stormwater drainage system.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  6 of 19


35.   All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
      collected and discharged so there is no net increase in stormwater runoff from the site. The runoff from
      the site shall be controlled via a combination of retention, detention, on site infiltration and gravity
      drainage lines. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
      existing drainage structures located in the adjoining property to the north (Lot 95 SP137431).

36.   The design of the stormwater drainage system for the site shall be prepared by a suitably qualified
      Registered Professional Engineer. The design shall include but not be limited to:

      36.1. The design of any required on site infiltration system to be of sufficient size to cater for a Q100
            rainfall event for the catchment area draining to the on site infiltration system.

      36.2. A report prepared by a suitably qualified geotechnical engineer to determine if the existing site
            conditions can cater for the expected infiltration should it be proposed;

      36.3. The determination of the capacity of the existing Council stormwater system to ensure that the
            subject site does not overload the system;

      36.4. The design of the drainage system for the site to include backflow protection features;

37.   To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
      from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
      down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
      Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged through a single
      underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
      shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
      Works.
      The approved maintenance plan shall be incorporated in the Community Management Scheme for the
      development and a copy of this shall be provided for Council’s records prior to commencement of the
      approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for Operational
      Works has been issued in regard to the drainage scheme.
38.   All site stormwater drainage shall be by means of a gravity system. No mechanical features are to be
      used to dispose of stormwater.
Sewer Mains
39.   The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.

40.   The existing sewer main that is located in south-western and north-western corners of the site and the
      ‘zone of influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer
      main to the finished surface level) shall be accurately located and determined by a licensed Surveyor and
      shown on all plans submitted for Operational Works approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
      damage no structures requiring a building permit (eg. buildings, retaining walls exceeding 1m in height,
      raised terraces, etc) shall be constructed within this ‘zone of influence’ or within 1.5m of the centreline of
      the sewer main, whichever is the greater. As such the applicant shall amend Operational Works plans
      including Building plans to ensure compliance.
41.   The existing sewer located in the northwest corner of existing lot 1RP903222 (No. 249) and along and
      within the western boundary of existing lot 26P9315 (No. 253) shall be removed and a new 150mm dia.
      sewer house connection branch constructed out of the existing manhole MP20/14/01 (located outside and
      adjacent to northern boundary of lot 26) to serve the proposed development.
       All works to be carried out to the standards and requirements of Council at the applicant’s cost.
42.   The applicant’s shall demonstrate that the new sewer house connection branch referred to in the above
      condition fully serves the proposed development in accordance with Council’s Planning Scheme Policy
      PSP06 and the Plumbing Code.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    7 of 19


43.   The existing sewer manhole located in the south-west corner of existing lot 2RP903222 (No. 247) to be
      removed and existing sewer located along and within the western boundary of adjacent Lot 22P9315 (No.
      247) to be abandoned. Consent of adjacent property owners to carry out any necessary works to
      abandon sewer required prior to issue of any Decision Notice in respect to Operational Works. All works
      to be carried out to the standards and requirements of Council at applicant’s cost.
Town Water Supply
44.   The site shall be connected to Council’s existing town water supply and be constructed in accordance with
      Council’s standards and requirements at no cost to Council.

45.   Each individual water connection to the water reticulation system shall extend to the property boundary
      and be metered. All fees for the supply of water meters shall be paid to the Council.

46.   All water meters must be located outside the property boundary and in an easily assessable location to
      facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
      fences or locked gates. In this regard approval of the water meter configuration and location must be
      obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
      hydraulic drawings.

47.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
      served by:-

      47.1. A single Body Corporate water meter to measure the total water consumption (including fire hose
            reels, but excluding fire hydrants and fire sprinkler systems), and

      47.2. Individual water meters to each tenement capable of being separately rated, and

      47.3. A fire service (fully testable single detector check with metered bypass), where applicable, for flows
            to fire hydrants and fire sprinkler systems (excluding fire hose reels).

48.   The applicant is advised that this development may require the provision of fire hydrants and a booster
      pump in accordance with the Building Code of Australia, and consultation may also be needed with
      Queensland Fire Services to ensure suitable fire fighting infrastructure is provided. To this end any
      necessary fire hydrants shall be clearly shown on the plans submitted for both Operational Works and
      Building Works approval and if a booster pump is deemed necessary, the plans shall indicate where the
      fire truck is to be accommodated in order to provide boosting to the water supply.
Service Easements (Sewer / Stormwater)
49.   A registered easement shall be created over the zone of influence of all sewers within the subject site and
      over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
      easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
      twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
      finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
      accurately locate all sewer mains and determine the necessary width of the easement, which shall be
      shown on any plans submitted for Operational Works / Building Works approval. To this extent the
      surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
      be created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
      writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
      additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
      commencing.
      Any changes required by Council’s Solicitor must be corrected immediately.
50.   The applicants to create a private easement for drainage within the adjoining property to the north (Lot 95
      SP137431) to enable connection to Council’s existing infrastructure. The easement is to be centrally
      located over the pipework with a minimum width of 1.5m or be of sufficient width to ensure that all
      associated pits and pipes are wholly contained within the easement. The terms of the easement shall
      include the responsibilities on the beneficiaries of the easement to maintain the drainage system so as to
      be operational at all times. In this regard the applicant shall provide a letter of authority from the adjoining
      property owner granting the easement prior to the issue of any Development Permit for Operational
      Works.

51.   No building or other structure shall be constructed or encroach over an easement.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     8 of 19


Earthworks
52.    Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
       Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
       or the blockage of, or interference with, any natural watercourses.

53.    Excavation of the site and the construction of the proposed works shall not have any adverse affects on
       the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
       Registered Professional Engineer Queensland shall supervise the excavation of the site and the
       construction of the new works to determine whether any additional measures are required to protect the
       stability of adjoining buildings and/or structures and/or services and/or lands.

54.    Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that
       border the development site. Fences that are affected shall be replaced prior to the Building Certifier
       issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on
       the plans submitted for Operational Works approval.

55.    The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
       use of vibrating installation techniques for sheet piling and other construction vibrations caused by
       excavating, earthmoving or demolition machinery or other similar construction techniques) unless
       approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator
       of such equipment shall at all times comply with the directions of the Geotechnical engineer and the
       reasonable and lawful directions of Council officers.
       The proposed use of such equipment shall be detailed in any application for a Development Permit for
       Operational Works.
56.    Certification of the completed works must be provided to Council by the supervising engineer. The
       certification shall state that the completed works, including any on site infiltration, conform with all aspects
       of the design and that the completed works will not have any adverse affects on the stability of adjoining
       buildings and/or structures and/or services and/or lands.
Site Stability
57.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
       soil classification, establish whether any measures are required to protect the stability of adjoining
       buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
       best suited for the proposed development. The recommendations of this report shall be incorporated into
       the design and construction of the proposed development.

58.    Should the recommendations of the geotechnical report require any part of the works (including
       excavation, retaining structures, tie backs etc) to be temporarily or permanently constructed within any
       adjoining property a letter of authority from the adjoining property owner shall be submitted to Council
       prior to the issue of operational works approval.
Construction Issues
59.    A Construction Management Plan (including a Traffic Management Plan) addressing all construction
       phases shall be prepared by a suitably qualified person and submitted to Council for approval prior to
       obtaining a Development Permit for Operational Works. The report should aim to address every
       foreseeable problem that is likely to occur during the construction process and include recommendation
       on how these can be overcome or minimised and shall also address parking for construction workers.
       To ensure construction is undertaken appropriately, the Construction Management Plan shall also include
       a section written by a Geotechnical engineer addressing the excavation and surrounding site support
       systems.
60.    A Condition Survey is to be carried out on adjoining buildings, structures and services prior to any
       excavation or construction works taking place on site. If distress already exists, a photographic survey
       shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
       implemented. A copy of this report is to be submitted to Council within 5 business days of the survey and
       prior to construction work proceeding.
      This report will be held by Council until all work is completed and will be used for verification purpose and
      to ensure that all buildings, structures and services are left in at least the same state as before
      construction commenced.
Erosion and Sediment Control
61.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  9 of 19


      In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
62.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
       various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
       amounts under the current Council policies and requirements is outlined in the table below:

        Contribution Required For:                                                             Amount:

        PSP12 – Public Open Space Contributions (Park)                                         $2,103
        PSP16 – Sewerage Headworks Contributions                                               $30,062
        PSP17 – Water Supply Headworks Contributions                                           $7,955
        PSP20 – Pathway Trunk Network Contributions                                            $2,125
        TOTAL Contribution Amount =                                                            $ 42,245
        Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
        from June 2007 until the date of payment.
     All contributions must be paid prior to the issue of a Development Permit for Operational Works.
     Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
     not be paid at the due time, Council shall call upon the trading bank guarantee in full.
     Processing of bonds for security where specific Council approval has been given for the bonding of
     contributions will incur an administration fee in accordance with Council’s Land Development Commercial
     & Regulatory Fees at the time of lodgement.
     In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
     the trading bank guarantee will be returned.
General
63.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
       specifications for all engineering works that will become Council infrastructure, which shall be submitted in
       conjunction with an application for a Development Permit for Operational Works. To avoid conflict with
       underground pipes or services, all existing and proposed services required by the development shall be
       shown on the plans.

64.    Any alteration of any public utility or other facilities necessitated by the development of the land or
       associated construction works external to the site shall be at no cost to Council.

65.    The transportation of all materials to and from the site shall be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
       be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
66.    The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
       Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
       external imperviously paved area correctly sized for all refuse and recycling containers and suitably
       screened from public places and neighbouring properties. A bin wash area is required with a cold-water
       tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to
       prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high
       and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or any other
       design approved by Council.

67.    Street litterbins to a design approved by Council’s Environmental Health Section, shall be supplied and
       installed at the developers expense at agreed locations, as well as Buttout Bins. Prior approval is
       required from Council’s Vector Control Officer by contacting 5449 5232.

68.    A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste
       Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted for the day-to-
       day operation of the development and approved by Council’s Health Section prior to issue of development
       permit for operational works.
       It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining
       exactly how to predict waste quantities and design waste areas is available from Council and the web.
       The Plan shall include the following information: -
            The types of waste that will be generated from the activities approved within the development.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 10

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   10 of 19


              Estimated volumes or tonnage of both recyclables and waste generated.

              Methods to be used for dealing with garden waste.

              Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.

              Description of procedures for getting all waste to the bins; the storage of bins and the collection of
                bins by the contractor.

              A description of the design details of waste storage and recycling areas including size, location,
                elevation and floor plan, methods of bin washing and system to prevent storm water getting into
                sewer via the bin wash.

              A description of types and volume of waste storage containers to be used.

              The waste and recycling storage area shall include the provision of containers for all waste and
                recycling materials including putresable matter, non-recycling waste, paper/ cardboard, glass,
                aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to
                sewer.

              A detailed description of vehicular access to collect waste. Where collection is off street, access
                must allow vehicles to enter and leave the site in a forward direction.

69.   A Waste Management Plan (construction and demolition) shall be submitted prior to demolition, removal
      or relocation of any building other than a shed.
      A Waste Management Plan (construction and demolition) is also required for construction of 15 or more
      dwelling units or for any business use of greater than 500m².
      Waste Management Plans (construction and demolition) are required to be submitted in accordance with
      Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste
      materials. These shall be located so that they are convenient and safe to use. (Refer to Noosa Council
      Waste Management Code)
      The Plan shall contain the following information:
              The site area for the storage and separation of waste is to be shown on the plan drawings
                accompanying the application.

              A waste management table as indicated below is to be completed showing how waste material is
                to be segregated - recycled – reused or disposed.
           MATERIALS ON-SITE                     DESTINATION
                                                 Re-use and Recycling                            Disposal
           Expected       waste    Estimated     On-site              Off-site                   *specify contractor
           materials               volume        *specify proposed *specify contractor           and landfill site or
                                   (m³)          re-use or on-site and recycling outlet          other disposal site
                                                 recycling methods
        Excavation material
        Green waste
        Bricks
        Concrete
        Timber-please
        specify
        Plasterboard
        Metals      -  please
        specify
        Asbestos
        Other      -   please
        specify
      Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
      completed by the demolition contractor.
      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective
      reuse and recycling of such materials. Additionally Council rewards those who segregate waste by
      significantly reducing disposal fees at the landfill some items are free. Higher gate fees are charged for
      loads of mixed waste.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 11

NOOSA COUNCIL IDAS Development Application Decision Notice                                                 11 of 19


70.   Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc)
      shall comply with the following requirements:
      The equipment shall be installed and located in a manner that prevents excessive noise in accordance
      with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may
      apply for offences.
      A person must not use equipment on any day if it makes or causes noise to be made –
      From 10pm to 7am: More than the lower of either –
            40 dB(A)

            3 dB(A) above the background noise level

            No audible noise for pool pumps apply during these hours.
              From 7am to 7pm: More than the lower of either –
            50 dB(A)

            5 dB(A) above the background noise level
      From 7pm to 10pm: More than 3 dB(A) above the background noise level.
71.   Submission of written certification from a suitably qualified person confirming that the noise levels from all
      mechanical equipment comply when measured at either the residential boundary or outside the most
      exposed part of an affected building, whichever is the closest to the equipment.
      The assessment and certification is required immediately after installation of the equipment and prior to
      any occupation of the building, and in a format approved by Council. This assessment must take into
      account noise from any other fixed equipment on the property e.g. swimming pool pump, heating/cooling
      equipment, etc that may increase the overall noise level emitted.
      Advice: It is highly recommended that the person you engage to certify the installation is involved at the
      plan development stage so they can recommend where this equipment is best located. They can also
      advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more
      costly to try and deal with noise problems after everything is built.
72.   An acoustic report prepared by a registered professional Acoustic Consultant shall be submitted and
      approved prior to the issue of a development approval for operational works. The acoustic report shall
      assess all potential noise sources and demonstrate how the development will not cause –

      72.1.   Excessive noise under Council’s Local Law No. 12 – Control of Nuisances.

      72.2.   Unlawful environmental nuisance under the Environmental Protection Regulation 1998.

      NB: In particular, the noise from the cars on the ramp entering and leaving the underneath parking.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 12

NOOSA COUNCIL IDAS Development Application Decision Notice                                       12 of 19




                                    Concurrence Agency Conditions –
                                    Environmental Protection Agency
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 13

NOOSA COUNCIL IDAS Development Application Decision Notice                                       13 of 19




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 14

NOOSA COUNCIL IDAS Development Application Decision Notice                                       14 of 19




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 15

NOOSA COUNCIL IDAS Development Application Decision Notice                                              15 of 19



                                    Local Laws, Policies & State
                                    Regulation Requirements
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


 THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                         CONDITIONS OF APPROVAL

73.   The applicant is advised that development contributions and infrastructure charges applicable to this
      development approval have been based on the following Uses Class/ Uses and applicable quantities:-

                     Existing Development                                 Approved Development
         Existing Use Class /                                 Approved Use Class /
                                     Existing Quantity                                    Approved Quantity
                 Use                                                 Use
                                                             Commercial Business –            2
        Detached House            1 Dwelling                                             992m Use Area
                                                             Type 1 – Office

74.   The applicant is informed that approval of this development application will trigger an Infrastructure
      Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
      amount of $131,837 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
      June 2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
      Chapter 5 of the Integrated Planning Act 1997.

75.   The applicant is informed that payment via credit card transaction will not be an acceptable method of
      payment for development contributions conditioned in this permit or for infrastructure charge notices
      issued separately.

76.   Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be
      submitted with any application for a Development Permit for Operational Works in respect of roadworks
      and stormwater drainage works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
      cadastre layout is to be submitted in conjunction with any application for Operational Works. The design
      shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
      Roads, Drainage and Earthworks.

77.   To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
      in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
      available at www.adac.com.au).

78.   The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
      boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
      obtaining a Development Permit for Building Works.

79.   Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
      operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
      accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
      Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
      requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
      works must be submitted to Council with the lodgement of any application for operational works over the
      site.

80.   The plans for the proposed building work have not been assessed for compliance with the requirements of
      the Building Code of Australia as they relate to people with disabilities. Your attention is drawn to the
      matter that either or both the Disability Discrimination Act 1992 (commonwealth) and the Anti-
      Discrimination Act 1991(Queensland) may impact on the proposed building work.
      Noosa Council recommends that the following matters be considered to address equitable access and
      facilities in the building:-




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 16

NOOSA COUNCIL IDAS Development Application Decision Notice                                              16 of 19


      A.     The building and environs should be designed to meet the requirements of the Human Rights and
             Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS1428.2;

      B.     Applicants should be aware that a “Disability Standard on Access to Premises is being developed
             and most likely will result in changes to the Building Code of Australia;

      C.     Any services and facilities in the building complex must allow independent, dignified and equitable
             use of the services and facilities for all people.


81.   This proposal has not been assessed in relation to the spread of fire between properties / buildings. It is
      the building certifiers responsibility to assess the requirements for fire services, fire separation and
      appropriate methods of construction as part of the building works approval process. Referral to the
      Queensland Fire and Rescue Service (QFRS) may be required as part of the Building Approval process.

82.   Ventilation to the carpark level will need to comply with Building Code of Australia F.4.11.

83.   The development should be undertaken and operated in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
      hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
      with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
      12 – Control of Nuisances.

84.   Noise from building works associated with commercial and or industrial development should comply with
      the following –

      84.1. Limited to between 7:00am to 6:30pm Monday to Saturday.

      84.2. All reasonable measures are taken to minimise noise emissions.

      84.3. Not permitted on Sunday or public holidays.

85.   In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
      concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
      reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
      fines apply for such offences.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 17

NOOSA COUNCIL IDAS Development Application Decision Notice                                       17 of 19



                                    List of Submitters
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION



Neil Armistead
Barcoo Body Corporate
29 Grevillea Road
LANGWARRIN VIC 3910




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 18

NOOSA COUNCIL IDAS Development Application Decision Notice                                                        18 of 19



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Page 19

NOOSA COUNCIL IDAS Development Application Decision Notice                                       19 of 19

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]

Used in these records

About this file

File size
283 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2006.00002689.001 [As Published].pdf · 283 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.