Original source · versioned page text
Delegated Report - Code - Planning OPW21 0256
Author Development Engineer, Laurie Schreck Development Assessment APPLICATION DETAILS Application No. OPW21/0256 Applicant Total Concept Homes P/L Proposal Operational Works - Clearing Vegetation under planning scheme, Earthworks, Landscaping, Roadworks, Stormwater Properly Made Date 1 September 2021 Information Request Date 27 September 2021 Information Response Date 25 October 2021 Decision Due Date 02 December 2021 Report Completed Date 27 October 2021 Report Reviewed By Mark Lewis PROPERTY DETAILS Property Address 108 Black Mountain Range Rd Black Mountain Qld 4563 RP Description Lot 2 RP 131369 Land Area 61210.000 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Rural Living Area Zone Medium Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Biodiversity, Waterways and Wetlands Overlay Bushfire Hazard Overlay (Medium Potential Bushfire Intensity & Potential Impact Buffer) Landslide Hazard Overlay (Moderate and High Hazard Areas) Assessment Type Code PROPOSAL The application seeks approval for an Operational Works - Clearing Vegetation under planning scheme, Earthworks, Landscaping, Roadworks and Stormwater. The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Site Plan Figure 3 – Revegetation Covenant Areas site details Background This application has been lodged due to requirements of the higher order approval (RAL21/0003) for the reconfigure of lot (1 into 2 lots). Site Description The subject site is located in undulating terrain with a Slope Stability Assessment included in the higher order approval. The formalisation of the shared driveway includes earthworks with some sections of retaining structure in accordance with the recommendations of the Slope Stability Assessment. The higher order approval also requires a vegetation protection covenant to be registered over each of the proposed lots for the portions of vegetation mapped as having biodiversity significance. A vegetation management plan was submitted with this Operational Works application addressing the following requirements of the higher order approval: The right of the landowner to continue to utilise and maintain the two existing dams and dam walls within the proposed covenant protected area on Lot 1; The right of the landowner to have electricity within the covenant for the purpose of dam pumps (Lot 1); Clearing and control of declared plants under the Biosecurity Act 2016, and any Council Listed Environmental Weeds, Exotic Grasses and other plants identified in writing by Council within the land covered by the veg protection covenant; Restoration of cleared areas to achieve the equivalent floristic composition of a similar undisturbed regional ecosystem (within covenant area); Stock proof to prevent domestic animals grazing in the area whilst allowing for the passage of native fauna. Property notes have been included for Lots 1 and 2 to advise owners, occupiers, prospective purchasers and private certifiers that each lot includes a covenant area for vegetation protection. Surrounding Land Uses assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Driveways and Parking Code; Earthworks Code; Landscaping Code; and Water Quality and Drainage Code. cONSULTATION Referral Agencies Not applicable. Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Amanda Turner (Senior Environmental Officer) conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW21/0256 for an Operational Works - Clearing Vegetation under planning scheme, Earthworks, Landscaping, Roadworks and Stormwater situated at 108 Black Mountain Range Rd Black Mountain Qld 4563 and described as Lot 2 RP 131369, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW21/0256 Street address: 108 Black Mountain Range Rd Black Mountain Qld 4563 Real property description: Lot 2 RP 131369 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Clearing Vegetation under planning scheme, Earthworks, Landscaping, Roadworks and Stormwater CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date A6578/20/L01 B Locality Plan as prepared by Alta Engineering 31 August 2021 A6578/20/L02 B Existing Features Plan as prepared by Alta Engineering 31 August 2021 A6578/20/R01 C Roadwork Layout Plan as prepared by Alta Engineering 28 September 2021 A6578/20/R02 B Roadwork Longitudinal Section as prepared by Alta Engineering 31 August 2021 A6578/20/R03 C Roadwork Cross Section as prepared by Alta Engineering 28 September 2021 RP00 B Vegetation Management and Covenant Area Rehabilitation Plan – Cover Page as prepared by North Coast Environmental Services - RP01 B Vegetation Management and Covenant Area Rehabilitation Plan – Site Context as prepared by North Coast Environmental Services 25 October 2021 RP02 A Vegetation Management and Covenant Area Rehabilitation Plan – Rehabilitation Area Detail as prepared by North Coast Environmental Services 12 October 2021 RP03 A Vegetation Management and Covenant Area Rehabilitation Plan – Weed Management Specification as prepared by North Coast Environmental Services 12 October 2021 RP04 A Vegetation Management and Covenant Area Rehabilitation Plan – Revegetation Specification as prepared by North Coast Environmental Services 12 October 2021 RP05 A Vegetation Management and Covenant Area Rehabilitation Plan – Fencing Plan as prepared by North Coast Environmental Services 12 October 2021 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 8 November 2023, unless an application to extend the currency period is approved by Council. PRIOR TO COMMENCEMENT OF WORKS Engineering All necessary approvals from external service providers (e.g. Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to Council prior to the prestart meeting. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Rehabilitation works; Erosion and sediment control works; and Other relevant parties. A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD); Provision for safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased; Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures. Any changes to the details associated with the Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. Retention of Existing Trees and Vegetation All trees and vegetation identified for retention must be protected in accordance with AS 4970, Protection of trees on development sites. Vegetation areas for protection must: Be protected in accordance with the approved Vegetation Management and Rehabilitation Plan rev B. Have no construction material, equipment or personnel entering the vegetation protection covenant area except to undertake approved rehabilitation activities. Be protected from any damage except approved controlled burns and/or Council approved vegetation removal for the protection of persons or property. *(Refer to Advisory Note) DURING CONSTRUCTION Engineering All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice; The relevant conditions of the higher order Reconfiguration of Lot approval viz. RAL21/0003 to which this approval relates; All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; and The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Site Access and Driveways Driveway crossovers must be constructed in accordance with council’s Standard Drawing RS-056. The following must be complied with during the construction of the required crossover/driveway: The crossover surfacing must consist of either an approved hot mixed asphaltic concrete or a 2 coat bituminous spray seal; The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties; and The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with the standard. Retaining walls exceeding 1.0m in height must be certified by a Registered Professional Engineer of Queensland. Slope and batters are a maximum grade of: 1 in 6 where in proximity to waterbodies 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Erosion and Sediment Control Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. The sediment and erosion control design and measures have NOT been approved, it is the site's Principal Contractor who is responsible for ensuring that the sediment and erosion control measures have: Been revised to address predicted rainfall events, and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. The erosion and sediment control measures must be designed, installed and maintained in accordance with the supervising engineer instructions and the current best practice standards * (Refer to Advisory Note). The developer must ensure non-essential exposure of soil is prevented by restricting the extent of disturbance and minimising the duration of soil exposure to adverse weather conditions and effectively turf, cover or stabilise any disturbed area without delay and prior to rainfall occurring. The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction including vehicle shakedown pad/grid (or similar) at the access to the construction site. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways. Prior to the completion of the development and commencement of use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or Where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Works within Protected Land Fencing for wildlife safety must be: In accordance with the approved Vegetation Management and Rehabilitation Plan rev B; 1.2m high, 3 strand plain wire (no barbed wire) and bottom strand no less than 300mm off the ground to allow for movement of native fauna and to exclude domestic animals, installed as per approved Vegetation Management and Rehabilitation Plan rev B. Plan RP05; Five strand barbed wire fencing to remain as per approved Vegetation Management and Rehabilitation Plan rev B. Plan RP05; Hinge joint fence with two 3m gates and include a minimum of 300mm ground clearance to allow for movement of native fauna and to exclude domestic animals as per approved Vegetation Management and Rehabilitation Plan Rev B; and Constructed prior to commencement of any other development works. Provision of durable, weather resistant and visually complementary to the natural environment, A5 signage with the wording ‘Vegetation Protection Covent – No domestic animals’ every 15m along the covenant boundaries for viewing by future owners and surrounding landowners. Plant Pest Management A qualified person* must manage plant pest (weeds): In accordance with the approved Vegetation Management and Rehabilitation Plan rev B; Ensure plants listed as Class 1 and 2 declared pests within Council’s Pest Management Plan are controlled and prevented from spreading; and Oversee management techniques to minimise regrowth, prevent damage to non-target species, retain conservation values and maintain site stability. *(Refer to Advisory Note) Rehabilitation of Vegetation Protection Covenant OPW CLEARING OF VEGETATION (only) Rehabilitation works must be supervised, undertaken and certified by qualified persons*. All works must be completed in accordance with this Decision Notice and approved Vegetation Management and Rehabilitation Plan rev B. *(Refer to Advisory Note) Rehabilitation must meet the performance criteria and completion of works as per the approved Vegetation Management and Rehabilitation Plan rev B. Bushfire Management A qualified person* must be engaged for the duration of the works to ensure: The asset protection zones and the fire management access paths are established for both the new and existing building envelopes; Covenant area boundaries are clearly delineated on the ground with non-perishable and fire resistant markers at all covenant bends (20m intervals along the covenant boundary). Rehabilitation of the Vegetation Protection Covenant area include: Weed removal. Site and soil preparation. Revegetation planting establishment including mulching, with fire retardant species appropriate for Regional Ecosystem and site conditions. Minimum planting density for groundcover (0.5m to 1m centres), shrub and tree species (1.5m to 2m centres). *(Refer to Advisory Note) FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. Upon completion of the vegetation protection and rehabilitation works, a certificate must be issued by a suitably qualified person* certifying that the works have been undertaken in accordance with the Operational Works permit and the approved Vegetation Management and Rehabilitation Plan rev B. *(Refer to Advisory Note) referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawings RS-056 and associated addendums. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: evidence that the site has been effectively stabilised in the short term; evidence that soil has been adequately ameliorated; evidence that seed of annual and perennial grass species has been applied at an adequate rate; and that grass seed has germinated at a density that is likely to achieve an effective grass cover. Retention of Existing Trees The existing trees on adjoining properties must be retained and protected during construction wherever achievable. To avoid doubt, this advisory note is not intended to exclude the operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following construction of the development which is the subject of this development approval. Removal of Existing Trees and Vegetation Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as well as optimum weed seed sterilisation. Qualified Person Qualified Person, for the purpose of: Undertaking rehabilitation construction and establishment works is considered to be a person with five years current experience in revegetation and regeneration. Preparing certification and managing declared plant pests, is considered to be: A landscape architect with a minimum of 3 years current experience in the field of pest plant management; A botanist or ecologist with a minimum of 3 years current experience in the field of pest plant management; An environmental consultant with a minimum of 3 years current experience in the field of pest plant management. Preparing a safety risk assessment, is considered to be a risk assessor holding a diploma in Risk Management qualification along with a minimum of three years current experience in preparing risk assessments and management plans. Supervising and certifying Bushfire Management is considered to be an Ecologist with suitable experience or a person with Fire Protection Association Australia – Bushfire Planning and Design certification. Landscape Works The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges Register where: An inspection revealed that any constructed rehabilitation/landscape works do not comply with the conditions of the Decision Notice, Approved Plans and or Approved Documents Certification is submitted to Council falsely stating that works comply with the approved plans, documents and or conditions of the Decision Notice. property notes The following property notes, or similar, will be placed against the subject property in Council’s property record system: Vegetation Protection Covenant The lot purchaser is advised that a Statutory Covenant is registered over Lots 1 and 2 for the purpose of vegetation conservation to protect native fauna and flora. The lot owner or any potential purchaser should familiarise themselves with the requirements of the covenant and ensure all requirements have been met prior to purchase or resale of the land. Bushfire Management Buildings constructed as a result of the development approval must be wholly located within the nominated building envelope shown on the approved reconfiguration plan and constructed to meet the recommendations against AS 3959, Construction of buildings in bushfire prone areas. The owner is advised to access the ‘Bushfire Awareness Package’ and the Bushfire Prepared Communities brochure or latest equivalent prepared by the Queensland Fire and Rescue Service (available online at www.fire.qld.gov.au). VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 11 of 14 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image2.png (image text)] Pv 10 ONNEATLYTOEXSTING Brow eve, [Attachment: image3.png (image text)] LEGEND ! ALLOTMENT BOUNDARIES. ‘ASSISTED NATURAL REGENERATION AREA APPROXIMATELY 2.5Sha ‘SUPPLEMENTARY REVEGETATION AREA APPROXIMATELY 0.13ha [Attachment: image4.png (image text)] cul Sed AAC Bi High Density Residential i 2: Tourist Accommodation a ee e ae : ona a TT 1) Neighbourhood Centre Low Imp: 77 P i Oak Gs IM Medium Impact Industry S i Re and Open Space IMB Ecvironmental Management and Conservation munity Facilities
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.