Original source · versioned page text
Ecological Assessment Report
Very large file: it may take a few minutes
The original of this document is very large (19.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Ecological Assessment Letter
Table 7: Proposed 12 months maintenance schedule
FREQUENCY MAINTENANCE PERIOD
Month 1 Month 2 Month 3 Month 4 Months 5-7 Month 8 Month 9-11 Month 12
Supplementary
Supplementary Supplementary planting if
planting if planting if required (and
Soil Preparation required (and required (and watering)
Week 1 Initial weed and spreading watering) Weed watering) Weed
Watering Weed
management of mulch (for management management
Weed Weed management
area 1)
management management
Weed
management
Watering
Natural
Initial weed Planting (Area 1 Natural Natural replacement
Week 2 Watering Watering Regeneration
management and 2) Regeneration Regeneration planting
Initial weed Watering Watering Watering
management (planted Weed Weed new planting Natural Natural replacement
Week 3 specimens only) if required planting
and site management management Regeneration Regeneration
preparation
Watering
Initial Weed Natural Natural replacement
Management Regeneration Natural Regeneration planting
Week 4 Watering Watering Watering
and site Regeneration
preparation Weed
management
PR22098_EA_36 Riverpark Rd, Ringtail Creek Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.