Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-02-21 Ordinary Meeting Agenda

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                     21 FEBRUARY 2019


         49.   The open space and setback areas are to be landscaped in accordance with
               Council’s Policy on Landscaping Guidelines and a properly prepared landscape
               plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such
               landscaping is to be completed prior to the premises being occupied and
               maintained at all times thereafter.
               ENVIRONMENTAL HEALTH
               Waste Management
         50.   The developer must provide waste storage and disposal facilities in accordance
               with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
               Commercial and Industrial Premises”. The facilities must include an external
               impervious area correctly sized for all refuse and recycling containers and suitably
               screened from public places and neighbouring properties. A bin wash area is
               required with a cold-water tap, hose and drain outlet connected to sewer, via a
               bucket trap. The drain outlet must be designed to prevent storm water entry to the
               sewerage system. This can be achieved with a nib wall 50mm high and up to
               700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed,
               or any other design approved by Council.
         51.   Refuse containers must be provided in accordance with the requirements of the
               Environmental Protection (Interim Waste) Regulation 1996 and (Waste
               Management) Regulation 2000, for the storage and collection of refuse.
               Mechanical Equipment
         52.   Written certification is required from a suitably qualified person confirming that
               sound pressure levels from all mechanical plant and equipment comply with the
               following:
               a.   Air-conditioning and Refrigeration
                        7am to 10pm: Maximum background + 5dB(A)
                        10pm to 7am: Maximum background + 3dB(A)
               b.   Pumps
                        7am to 7pm: Maximum background + 5dB(A)
                        7pm to 10pm: Maximum background + 3dB(A)
                        10pm to 7am: No audible noise.
         53.   The certification must be submitted to Council, which certifies that operational
               noise from any fixed plant and equipment complies with the requirements of this
               Decision Notice
    B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
                                                                                          Carried.




                                                                                    Page 21 of 24
Log in to download the original file

2019-02-21 Ordinary Meeting Agenda(PDF, 606KB).pdf · 621 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.