Original source · versioned page text
DA Form 2 - Building Work
Name(s) (individual or company full name)
Contact name (applicable for companies)
Postal address (P.O. Box or street address)
Suburb
State
Postcode
Contact number
Email address (non-mandatory)
Mobile number (non-mandatory)
Fax number (non-mandatory)
15) Builder’s details
Tick if a builder has not yet been engaged to undertake the work and proceed to 16). Otherwise provide the
following information.
Name(s) (individual or company full name)
Contact name (applicable for companies)
QBCC licence or owner – builder number
Postal address (P.O. Box or street address)
Suburb
State
Postcode
Contact number
Email address (non-mandatory)
Mobile number (non-mandatory)
Fax number (non-mandatory)
16) Provide details about the proposed building work
a) What type of approval is being sought?
Development permit
Preliminary approval
b) What is the level of assessment?
Code assessment
Impact assessment (requires public notification)
c) Nature of the proposed building work (tick all applicable boxes)
New building or structure Repairs, alterations or additions
Change of building classification (involving building work) Swimming pool and/or pool fence
Demolition Relocation or removal
d) Provide a description of the work below or in an attached schedule.
New dwelling house
e) Proposed construction materials
Double brick Steel Curtain glass
External walls Brick veneer Timber Aluminium
Stone/concrete Fibre cement Other
Page 4
DA Form 2 – Development Application details
Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original