Council archive · source document
07/0012 - Lot Reconfiguration & MCU [As Published] · 132007.12
INTEGRATED PLANNING ACT 1997 State-controlied road matters (cont} IDAS Assessment Checklist, Version 18.0, 10 November 2006 C1 (ii) development on land not contiguous to a State-contralled road and - LD (@) material change of use - « assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; (J (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation and exceeding the thresholds set by that schedule; C1 (c) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) above)- * assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule. XX (iii) none of the above Clearing vegetation Far more information refer to Guide 12. Unless you answered “none of the abave” to Q3, the application requires assessment by the Department of Natural Resources Mines and Water (NRMW). Hf an agency other than NRMW is the assessment manager for the application, NRMW is a concurrence agency for the application in relation to this matter. It you ticked Q3(() or (ii), your application requires referral to NRMW for assessment regardless of whether vegetation clearing is proposed or not. The application involves: (tick applicable box/es) CJ (i) material change of use - (a) assessable against the planning scheme; (b) on a lot containing - * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or « ifthere is no property map of assessable vegetation for the lot - remnant vegetation: (c) where the existing use of the land is a rural or environmental use; and ° (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 Oi (ii) reconfiguring a fot - (a) ona lot containing a category 1, 2 or 3 area shown on a property map of assessable vegetation or, if there is no property map of assessable vegetation for the lot, remnant vegetation; (b) where the size of the lot before the reconfiguration is 2 hectares or larger; (c) where 2 or more lots are created; and (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 Uti) operational work - (a) for the clearing of native vegetation where the vegetation clearing is made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of Form? | (iv) none of the above. Strategic port land For more information refer to Guide 11. If you ticked (i) - the relevant Port Authority is the assessment manager for the application. if you ticked (i) Queensland Transport is a concurrence agency for the application. The application involves: Li (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 @ Act) - comptete Part | of Form 1 Lil) a material change of use that is inconsistent with the land use plan approved under the TI Act for the strategic port land - complete Part! of Form 1 EX] (iii) none of the above Acid sulfate soils For more information refer te Guide 10. Uniess you answered “none of the above’ to QS, the application requires assessment by Department of Natural Resources Mines and Water (NRMW). ff an agency other than NRMW is the assessment manager for the application, NRMW is an advice agency for he application in relation to this matter. The application involves development on land situated in an identified5 local government area and where the surface of the land is: (tick applicable box) [1 (i) below 20m AHD§ and the development will involve the excavation of 1000m?or more of soil or sediment at or below 5m AHD, or C1 (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more of material & (iii) none of the above 5. The identified loca! government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Coolaola, Doungias, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Marcochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday. 6 Australian Height Datum (AHD). Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0012 - Lot Reconfiguration & MCU [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.